United Pacific Insurance v. United States

497 F.2d 1402, 20 Cont. Cas. Fed. 83,173, 204 Ct. Cl. 686, 1974 U.S. Ct. Cl. LEXIS 139
CourtUnited States Court of Claims
DecidedJune 19, 1974
DocketNo. 163-73
StatusPublished
Cited by48 cases

This text of 497 F.2d 1402 (United Pacific Insurance v. United States) is published on Counsel Stack Legal Research, covering United States Court of Claims primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
United Pacific Insurance v. United States, 497 F.2d 1402, 20 Cont. Cas. Fed. 83,173, 204 Ct. Cl. 686, 1974 U.S. Ct. Cl. LEXIS 139 (cc 1974).

Opinion

Kashiwa, Judge,

delivered the opinion of the court:

This is an action ¡brought under the general jurisdiction of the court, 28 U.S.C. § 1491 (1970), for review of an administrative decision under the Wunderlich Act, 41 U.S.C. §§ 321, 822 (1970). The plaintiff contests the decision of the Armed Services Board of Contract Appeals (hereinafter referred to as “ASBOA”).

The parties filed cross motions for summary judgment. The material facts are not in dispute. Plaintiff’s motion for summary judgment is allowed for reasons hereinafter stated.

On or about June 30,1970, the Defense Supply Agency, an agency of defendant, and Knoxville Acoustical Co., Inc. entered into contract No. DSA 400-70-C-6216 for the recovering of roofs at the Defense General Supply Center, Richmond, Virginia, being Project PE 1-69 (Second Increment) , warehouses 4,10, and 12, and Project PR 1-69 (Third Increment), warehouses 30, 31, 32, and 33. The fixed contract price was $155,439.

Plaintiff, as surety, executed a payment and performance bond on said contract. Knoxville Acoustical Co. did not [689]*689perform any work on said project and was defaulted under said contract by the Government. Plaintiff was then requested to perform said contract.

Plaintiff and the Government entered into a takeover agreement whereby both parties agreed that plaintiff would become the contractor on said construction contract. On or albout June 1,1971, plaintiff contracted with L. P. Still and Co. for the performance of all work under said contract and takeover agreement.

■A dispute arose over the method of installing bituminous flashings on the firewalls of said project. The firewalls, about 8 inches wide, rose more than a foot above the warehouse roofs. Plaintiff contended that under the terms of the contract, the plaintiff could install the flashings on the firewalls in either of two ways. Either plaintiff could “cap and seal” the flashings or “return and seal” the flashings. Under the former method, the flashing would be installed up the vertical side of the firewalls and would be capped and sealed to the underedge of the terra cotta coping which was located on the horizontal surface of the top of the firewall. The latter alternative, commonly referred to as returning and sealing, requires the removal of all terra cotta coping on the tops of the firewalls. Then new flashings would be installed up the vertical side of the firewalls, over the top of the firewall, and down the other vertical side of the firewall. New terra cotta coping would then be sealed on top of the flashing on the horizontal portion (tops) of the firewalls.

The Government contended that the contract did not allow for alternative methods of installing the flashings. Instead, the Government demanded that the more expensive return- and-seal method be used. Plaintiff urged that under the contract either the cap-and-seal method or the return-and-seal method was allowed. Under protest, the plaintiff complied with the Government’s demand. The retum-and-seal method was considerably more expensive than the cap-and-seal method.

This dispute centers around the legal interpretation of the contract documents and particularly the following provisions of the contract:

TF2-2 GENERAL: * * * New "bituminous flashings [690]*690shall he installed in accordance with these specifications at all locations where existing flashings are bituminous type. [Emphasis supplied.]
TP2-8 FLASHINGS:
a. General: All bituminous flashings shall be replaced. Flashings shall be provided in the angles formed at walls and other vertical surfaces a/nd where required to make the work watertight.. Except where metal flash-ings are indicated or are specified in other sections, bituminous-plastic base flashings shall be provided and installed before the top pouring and surfacing aggregate are applied to the roofing. The raggle or groove in which flashings are installed shall be not more than 14 inches nor less than 8 inches above the roof. Step flashings shall be used where vertical surfaces abut sloped roof surfaces. Flashings shall be returned and seeded or capped and seeded to waterproof edges a'nd ends. [Emphasis supplied.]
* ❖ ❖ * ifs
TP6-1:
This section covers removing and reinstalling all coping as necessary in connection with replacement of flashings, it being specifically understood that contractor shall provide all material necessary to replace broken or cracked coping irrespective of whether or not damage resulted from contractor’s operations. [Emphasis supplied.]'

For the extra work caused by the Government’s demanding the returning and sealing of the flashings, plaintiff sought an equitable adjustment of the contract price. After an adverse finding by the contracting officer, plaintiff appealed to the AS'BOA. The Board ruled adversely to the plaintiff and held that the contract required the flashings to be returned and sealed (ASBCA No. 17748). Plaintiff then filed suit in this court to recover $44,003.92.

The Board’s decision turned entirely upon the application of law to the undisputed provisions of the contract. At page 8 of the decision, the Board stated that the issue was the interpretation of the specifications and drawings. Defendant concedes that under Wunderlich Act standards the issue of whether the subject construction contract requires installation of bituminous flashings on the tops of firewalls required an interpretation of the contract terms and, therefore, is a [691]*691question of law which this court is free to answer independently of the Board’s decision. The cases are legion which establish that an administrative board’s interpretation of the language of the contract documents is a question of law and not binding on nor entitled to finality by the court. Martin Lane Co. v. United States, 193 Ct. Cl. 203, 206-207, 432 F. 2d 1013, 1015 (1970); HRH Constr. Corp. v. United States, 192 Ct. Cl. 912, 918, 428 F. 2d 1267, 1271 (1970).

Plaintiff contends that the contract allowed either of two alternative methods of installation and under the terms of the contract, plaintiff had the option of either capping and sealing the flashings or returning and sealing the flashings. On the other hand, the Government claims the contract required the return-and-seal method of installation.

The contract provisions expressly provide that the plaintiff may use either of the aforementioned methods. Section TP2-8 provides:

a. General: All bituminous flashings shall be replaced. Flashings shall be provided in the angles formed at walls and other vertical surfaces and where required to make the work watertight. * * * Step flashings shall be used where vertical surfaces abut sloped roof surfaces. Flash-ings shall be returned and sealed or capped and sealed to waterproof edges and ends. [Emphasis supplied.]

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Vigor Works, LLC
Armed Services Board of Contract Appeals, 2023
ECC International, LLC
Armed Services Board of Contract Appeals, 2022
Richardson v. United States
Federal Claims, 2021
Benjamin Medina
Armed Services Board of Contract Appeals, 2017
States Roofing Corporation v. Winter
587 F.3d 1364 (Federal Circuit, 2009)
Public Service Co. v. United States
88 Fed. Cl. 250 (Federal Claims, 2009)
Information Systems & Networks Corp. v. United States
68 Fed. Cl. 336 (Federal Claims, 2005)
Bull v. United States
65 Fed. Cl. 407 (Federal Claims, 2005)
Sigmon Coal Co. v. Tennessee Valley Authority
359 F. Supp. 2d 686 (E.D. Tennessee, 2004)
CEMS, Inc. v. United States
59 Fed. Cl. 168 (Federal Claims, 2003)
Capital Properties, Inc. v. United States
56 Fed. Cl. 427 (Federal Claims, 2003)
Metcalf Construction Co. v. United States
53 Fed. Cl. 617 (Federal Claims, 2002)
CJP Contractors, Inc. v. United States
45 Fed. Cl. 343 (Federal Claims, 1999)
Input/Output Technology, Inc. v. United States
44 Fed. Cl. 65 (Federal Claims, 1999)
Nielsen-Dillingham Builders, J.V. v. United States
43 Fed. Cl. 5 (Federal Claims, 1999)
Telex Communications, Inc. v. United States
42 Cont. Cas. Fed. 77,281 (Federal Claims, 1998)

Cite This Page — Counsel Stack

Bluebook (online)
497 F.2d 1402, 20 Cont. Cas. Fed. 83,173, 204 Ct. Cl. 686, 1974 U.S. Ct. Cl. LEXIS 139, Counsel Stack Legal Research, https://law.counselstack.com/opinion/united-pacific-insurance-v-united-states-cc-1974.