Peter Kiewit Sons' Co. v. Iowa Southern Utilities Co.

355 F. Supp. 376, 1973 U.S. Dist. LEXIS 14838
CourtDistrict Court, S.D. Iowa
DecidedFebruary 21, 1973
DocketCiv. 8-2397-C-2
StatusPublished
Cited by35 cases

This text of 355 F. Supp. 376 (Peter Kiewit Sons' Co. v. Iowa Southern Utilities Co.) is published on Counsel Stack Legal Research, covering District Court, S.D. Iowa primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Peter Kiewit Sons' Co. v. Iowa Southern Utilities Co., 355 F. Supp. 376, 1973 U.S. Dist. LEXIS 14838 (S.D. Iowa 1973).

Opinion

MEMORANDUM AND ORDER.

HANSON, Chief Judge.

Peter Kiewit Sons’ Co. (hereinafter Kiewit or the plaintiff), a Nebraska corporation, brings this lawsuit against Black & Veatch (hereinafter also the Engineer), a Missouri partnership, and Iowa Southern Utilities Co. (hereinafter Iowa Southern or the Owner), a Delaware corporation with its principal place of business in Iowa. The matter in controversy exceeds $10,000, exclusive of interest and costs. The Court concludes that it has jurisdiction over the subject matter of this action by reason,of diversity of citizenship of the parties. 28 U. S.C., Section 1332(a).

The action arises from the work performed by the plaintiff under a construction contract dated May 13, 1966, in connection with the construction of a new generating station for Iowa Southern at Burlington, Iowa. In general, the construction work began in May of 1966 and was finally completed in 1968.

This cause came on for trial before the Court and the Court, having considered the evidence submitted, makes the following:

FINDINGS OF FACT:

1. Iowa Southern is a public utility engaged, among other things, in the production and sale of electricity. In 1964, Iowa Southern decided to build a new fossil fueled steam generating plant on the Mississippi River near Burlington, Iowa. After interviewing several engineering firms, it entered into an agreement, on April 10, 1964, with Black & Veatch, whereby Black & Veatch agreed to render certain services including the designing of the plant, the preparation of adequate plans, specifications, and contract documents relating to the several different phases of construction, and, ultimately, the supervision of the actual performance of construction activities on the job site. The contract required the new plant to be in operation by May 1, 1968. Black & Veatch agreed in the contract to perform the services called for “in accordance with the highest standards of the engineering profession.”

2. One provision of the contract between Black & Veatch and Iowa Southern required the Engineer to prepare construction plans and specifications in such detail that lump-sum proposals could be received from prospective contractors. Other provisions required Black & Veatch to properly coordinate and expedite the work, and to perform all tasks required “in obtaining strict compliance with contracts, plans and specifications.”

3. Pursuant to the contract with Iowa Southern, Black & Veatch began the preliminary work, which included obtaining for Iowa Southern bids on various items of equipment, such as the boiler, turbine and generator, to be purchased for installation in the proposed building. In addition, the Engineer began to prepare the necessary plans and specifications for construction of the building. Before the final plans, specifications and construction schedules could be prepared, however, it was necessary to obtain the contracts, including shipping dates, for the major items of equipment to be installed in the building, since the installation of this equipment had to be integrated into the construction process. The contracts for the boiler, turbine and generator were apparently awarded in late 1965. Combustion Engineering Co. was awarded the contract for the boiler and General Electric Co. was awarded the contract for the turbine.

4. Rather than let one general contract to one prime contractor who would be responsible for the entire construction of the project, Black & Veatch chose that Iowa Southern should award several prime contracts, breaking down the actual construction into several *380 areas by the type of work involved. The Engineer determined that the structural steel contract, which included supplying and erection of the structural steel, would be let as one prime contract. The general construction, mechanical construction, and electrical construction contracts were put out for bid on a unified basis, so that contractors could bid on all three contracts or on only one or two of them.

5. The structural steel plans were released to bidders on January 28, 1966. The successful bidder for this contract was Havens Steel Co. The contract between Iowa Southern and Havens was awarded on March 8, 1966, and actually signed on March 15, 1966.

6. Contemporaneous with this activity, Black & Veatch were preparing an overall schedule of the construction. This overall construction schedule was in the form of a modified bar chart, known in the record as G-l, and was issued by Black & Yeatch on March 11, 1966. The construction schedule, G-l, set out estimated dates for the delivery of major components and the sequence and schedule for constructing the plant. The schedule was designed to coordinate work under the various prime contracts and to establish the basic working periods, construction sequence, and completion dates for certain phases of the work. G-l was made part of the general, mechanical and electrical contracts, but was not included in the boiler, turbine or structural steel contracts because they had been awarded prior to the issuance of G-l.

7. Bids were then requested on the general, mechanical and electrical contracts. Peter Kiewit Sons’ Co., the plaintiff herein, was the successful bidder on the general contract, and the agreement forming the basis of this lawsuit was entered between Kiewit and Iowa Southern on May 13, 1966. Winger Construction Co. was awarded the mechanical contract, and A. G. Shulman Electric Co. was awarded the electrical contract.

8. The entire project cost in excess of $23 million. Kiewit’s contract, as adjusted, was for $3,284,221.00. The general construction contract awarded Kiewit called for such things as the driving of pilings for foundation work, the pouring of concrete slabs at various elevations of the powerhouse structure and in outlying structures, the erection of the walls, ceilings and roof of the various structures, and the painting involved in the project. Kiewit subcontracted the painting portion to Chicago Painting Service, Inc.

9. The contract between Iowa Southern and Havens Steel Co. required Havens to commence work on July 15, 1966, and to have the steel sufficiently erected to allow hoisting of the boiler drum to commence October 1, 1966. The Havens contract did not contain any other intermediate dates nor did it incorporate G-1, which did contain intermediate dates for some phases of the construction.

The construction contracts with Kiewit and each of the other contractors, including Havens, required the contractor to submit, within 30 days after award of contract, “a detailed construction schedule showing the time schedule for completion of each element of the work. The detailed schedule shall be based on the Construction Schedule but shall be expanded to include a complete breakdown of all elements of work.” Havens, before commencing its work on the structural steel, furnished and became bound to its own detailed construction schedule, which generally followed and was compatible with the schedule G-l. Kiewit also furnished a detailed construction schedule which followed G-l generally, but also included some fairly substantial deviations from G-l.

10. The entire agreement between Iowa Southern and Kiewit, excepting a later contract modification which will be discussed subsequently, is contained within two volumes, in evidence in this cause as Exhibit 1.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Mallavarapu v. City of Cedar Falls
Court of Appeals of Iowa, 2020
MacOmb Mechanical Inc v. Lasalle Group Inc
Michigan Court of Appeals, 2015
C & H Electric, Inc. v. Bethel
Supreme Court of Connecticut, 2014
Law Co., Inc. v. Mohawk Const. & Supply Co.
702 F. Supp. 2d 1304 (D. Kansas, 2010)
Tricon Kent Co. v. Lafarge North America, Inc.
186 P.3d 155 (Colorado Court of Appeals, 2008)
RaCON, Inc. v. Tuscaloosa County
953 So. 2d 321 (Supreme Court of Alabama, 2006)
Capital Safety, Inc. v. State
848 A.2d 863 (New Jersey Superior Court App Division, 2004)
Pellerin Construction, Inc. v. Witco Corp.
169 F. Supp. 2d 568 (E.D. Louisiana, 2001)
Triple R Paving, Inc. v. Broward County
774 So. 2d 50 (District Court of Appeal of Florida, 2000)
Scoccolo Const., Inc. v. City of Renton
9 P.3d 886 (Court of Appeals of Washington, 2000)
U.S. F/U/B/A Williams Electric Co. v. Metric Constructors, Inc.
480 S.E.2d 447 (Supreme Court of South Carolina, 1997)
Brown Bros. Inc. v. Metropolitan Government
877 S.W.2d 745 (Court of Appeals of Tennessee, 1993)
APAC-Carolina, Inc. v. Greensboro-High Point Airport Authority
431 S.E.2d 508 (Court of Appeals of North Carolina, 1993)
John E. Gregory & Son, Inc. v. A. Guenther & Sons Co.
432 N.W.2d 584 (Wisconsin Supreme Court, 1988)
H. PEPPER & ASSOC., INC. v. Hardrives Co., Inc.
528 So. 2d 72 (District Court of Appeal of Florida, 1988)
PT & L. CONST. v. Dept. of Transp.
531 A.2d 1330 (Supreme Court of New Jersey, 1987)

Cite This Page — Counsel Stack

Bluebook (online)
355 F. Supp. 376, 1973 U.S. Dist. LEXIS 14838, Counsel Stack Legal Research, https://law.counselstack.com/opinion/peter-kiewit-sons-co-v-iowa-southern-utilities-co-iasd-1973.