Old Dominion Elec. Coop. v. Fed. Energy Regulatory Comm'n

898 F.3d 1254
Court of Appeals for the D.C. Circuit·Decided August 3, 2018·No. 17-1040; C/w 17-1041·Published·Cited by 20 cases

Opinion

Katsas, Circuit Judge

In the past, electric utilities in the mid-Atlantic region have shared the costs of high-voltage transmission lines, which benefit the entire region. In 2015, some of these utilities proposed to eliminate cost sharing for projects undertaken only to satisfy an individual utility's planning criteria, including projects that involve high-voltage lines. The Federal Energy Regulatory Commission approved this change and applied it to deny cost sharing for projects to rebuild two high-voltage lines. The petitioners, whose local zone now must bear the entire cost of these two projects, contend that FERC's decisions were unlawful or inadequately explained.

I

A

The Federal Power Act gives FERC jurisdiction over facilities that transmit electricity in interstate commerce. See 16 U.S.C. § 824 (b)(1) ; 42 U.S.C. § 7172 (a)(1)(B). Under the Act, electric utilities must charge "just and reasonable" rates. 16 U.S.C. § 824d(a). For decades, the Commission and the courts have understood this requirement to incorporate a "cost-causation principle"-the rates charged for electricity should reflect the costs of providing it. See Ala. Elec. Co-op., Inc. v. FERC , 684 F.2d 20 , 27 (D.C. Cir. 1982). We often frame this principle as one that ensures "burden is matched with benefit," so that FERC "generally may not single out a party for the full cost of a project, or even most of it, when the benefits of the project are diffuse." BNP Paribas Energy Trading GP v. FERC , 743 F.3d 264 , 268 (D.C. Cir. 2014) ; see Midwest ISO Transmission Owners v. FERC , 373 F.3d 1361 , 1368-69 (D.C. Cir. 2004). This cost-causation principle "add[s] flesh to [the] bare statutory bones" of the just-and-reasonable-rate *1256 requirement. K N Energy, Inc. v. FERC , 968 F.2d 1295 , 1300 (D.C. Cir. 1992).

To promote more efficient coordination among electric utilities, FERC has promulgated a regulation known as "Order No. 1000." Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities, 136 FERC ¶ 61,051 (2011). It imposes two requirements relevant here. First, utilities in each planning region must jointly produce a regional transmission plan to determine what new facilities would best meet regional needs for electricity. Id. P 148. Second, in their respective tariffs, utilities must include a formula "for allocating the costs of new transmission facilities selected in the regional transmission plan for purposes of cost allocation." Id. P 558. This formula must satisfy six general principles, the first of which is the cost-causation principle: "The cost of transmission facilities must be allocated to those within the transmission planning region that benefit from those facilities in a manner that is at least roughly commensurate with estimated benefits." Id. P 622. Order No. 1000 requires each utility to show, through compliance filings, that its cost-allocation formula is consistent with the six specified principles. Id. P 603.

This case involves disputes within a planning region encompassing much of the Mid-Atlantic and part of the Midwest. In this region, the transmission of electricity is overseen by PJM Interconnection, LLC, which controls but does not own the facilities of its member utilities. ("PJM" refers to P ennsylvania, New J ersey, and M aryland-the first three states in which PJM operated.) The region is subdivided into zones that correspond to areas served by each individual utility. The utilities are governed by the PJM Operating Agreement, which sets forth the respective rights and duties of PJM and its members, and the PJM Open Access Transmission Tariff, which details the terms on which the utilities provide service.

To comply with the regional-planning requirement of Order No. 1000, PJM-member utilities maintain a Regional Transmission Expansion Plan. Schedule 6 of the Operating Agreement specifies what kind of projects must be included in this Regional Plan. As relevant here, Schedule 6 designates three categories of projects for inclusion in the Plan: (1) projects to satisfy PJM's own planning and reliability criteria; (2) projects to satisfy reliability criteria developed by standard-setting organizations such as the North American Electric Reliability Corporation ("NERC"); and (3) projects to satisfy planning criteria established by individual utilities. The utilities submit their individual planning criteria both to FERC, on a document called Form 715, and to PJM.

Schedule 12 of the Tariff addresses the cost-sharing requirements of Order No. 1000. Before 2015, Schedule 12 required regional cost sharing for all "Regional Facilities," which it defined as projects that were (a) included in the Regional Plan to satisfy any of the planning criteria described above and (b) particular kinds of high-voltage projects. Schedule 12 also establishes the cost-allocation formula for such Regional Facilities. Half of these costs are allocated on a pro rata basis, based on the level of customer demand within each zone, regardless of where the specific project at issue is located. This method of cost allocation is called the "postage stamp" approach.

Free access — add to your briefcase to read the full text and ask questions with AI

Old Dominion Elec. Coop. v. Fed. Energy Regulatory Comm'n, 898 F.3d 1254 (D.C. Cir. 2018).

898 F.3d 1254 (Old Dominion Elec. Coop. v. Fed. Energy Regulatory Comm'n) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Tenaska Clear Creek Wind, LLC v. FERC
108 F.4th 858 (D.C. Circuit, 2024)
City of Lincoln v. FERC
89 F.4th 926 (D.C. Circuit, 2024)
American Municipal Power, Inc. v. FERC
86 F.4th 922 (D.C. Circuit, 2023)
El Paso Electric v. FERC
76 F.4th 352 (Fifth Circuit, 2023)
Evergy Kansas Central, Inc. v. FERC
77 F.4th 1050 (D.C. Circuit, 2023)
NextEra v. D'Andrea
Fifth Circuit, 2022
NextEra v. Lake
48 F.4th 306 (Fifth Circuit, 2022)
Constellation Mystic Power v. FERC
45 F.4th 1028 (D.C. Circuit, 2022)
LSP Transmission Holdings II, LLC v. FERC
45 F.4th 979 (D.C. Circuit, 2022)
Coalition of MISO Transmission v. FERC
45 F.4th 1004 (D.C. Circuit, 2022)
Finnbin, LLC v. CPSC
45 F.4th 127 (D.C. Circuit, 2022)
LSP Transmission Holdings II v. FERC
28 F.4th 1285 (D.C. Circuit, 2022)
Long Island Power Authority v. FERC
27 F.4th 705 (D.C. Circuit, 2022)
PSE&G v. FERC
D.C. Circuit, 2021