This text of 281 N.W. 898 (Karlinski v. P. R. & H. Lumber & Construction Co.) is published on Counsel Stack Legal Research, covering North Dakota Supreme Court primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Karlinski v. P. R. & H. Lumber & Construction Co., 281 N.W. 898, 68 N.D. 522, 1938 N.D. LEXIS 142 (N.D. 1938).

Opinion

Morris, J.

This is an appeal from- a judgment for damages entered pursuant to the verdict of a jury, against tbe defendant for breach of a building contract. The evidence, when viewed in the light' most favorable to the plaintiff in whose favor the verdict was rendered, discloses these facts. In April 1930 the plaintiff and defendant en1 tered into a contract for repairing and building an addition to -a house and installing a furnace therein. The house was twenty by thirty'feet; one and a half stories high. The interior of the first story was-finished and the second story was unfinished. At the time the contract was entered into a Mr. Richards, representing the defendant, came out to *524 the plaintiff’s place and discussed with him the particulars of the work to be undertaken. They discussed the probable cost, and went over each item. The items covered by the conversation are as follows: Raising the house so that the bottom of the cellar window sills would be level with the top of the ground; plastering on metal lath over the old plaster; plastic painting of the interior; remodeling the upstairs using sheet rock and material to cover the nails so that they would not show; building on a small room upstairs as a dormer; laying a new floor upstairs. When completed, the job was to have two rooms and a dormer upstairs, and installation of water pipes to the dormer.

A few days later another conversation was had and the basement was discussed. It was agreed that the defendant would put in a cement wall six inches thick in the basement beside the stone wall that was already there. The house was to be raised as had been mentioned, in the previous conversation, a distance of about eighteen inches. It was then agreed that a furnace was to be installed in the basement, the house having been previously heated by stoves. It was to be a pipe furnace guaranteed to heat the house. The maple floors downstairs were to be resurfaced. The floors in the dining room and the living room were to be scraped. It was also agreed that a ten by twenty foot addition was to be built with sheet rock on the walls, and new floors. The sheet rock was to be covered so that the joints and nails would not show. The addition was to contain two rooms and a stairway going to the basement. It was also agreed that a stairway would be constructed from the main floor to the second story by taking out an old stairway and building a new one in its place. Also the old basement stairway was to be taken out and a clothes closet to be built in its place. Richards then calculated the approximate cost and advised the plaintiff that it would cost between $1100 and $1200 and not more than $1300. The work was commenced on April Y and completed about May 13. The plaintiff continued to live in the house, but most of the time was busy working in his fields.

The plaintiff complains that the defendant cut two joists under the main floor in order to insert cold air registers for the furnace. No 'header was installed, resulting in the weakening of the floor over a space of about six feet. Another joist was cut in order to install a sewer pipe, and no support provided in its place. This occurred di *525 rectly under a partition with the result that the house is sagging and the walls are cracking, there being no support beneath the partition. Another joist was cut under the partition wall in the living room where a warm air register was installed. Another joist cracked under the stairway causing the stairway to sag. Joists were also cut around the chimney which was installed by the ■ defendant. A two by four was used as a header on one side of the chimney and on the other no header was put in at all. A elothes-chute is beside the chimney. The clothes-chute is sagging down and the plaster is cracked. The floors downstairs are not level. Some of the floor boards upstairs do not meet on the joists and there is a large crack between the floor and wall along the side of one room.

When the defendant attempted to jack up one corner of the house the cellar wall gave way and collapsed into the basement. The corner of the house sagged. The defendant afterward raised it approximately to its original position, but did not raise the house eighteen inches as had been provided for in the agreement. It was agreed that the basement wall was to be waterproof. The cement is full of holes and soft in spots, and permits water to run into the basement. The chimney is cracked on three sides. The air ducts for the furnace were covered with a layer of asbestos. The boards shrunk, cracking the asbestos paper cover and resulting in the impairment of the air circulation of the furnace. The nails and joints of the sheet rock were not covered. The joints in the sheet rock in the ceiling were filled with plaster, but the plaster fell out. There are four different cracks in the plaster about the chimney. The floors were not scraped. Some of the plaster has fallen out around the sewer pipe, the joint of which was not concealed in the wall. Plaster on the ceiling has cracked. Some of the steps on the stairway are loose and squeak. The defects complained of are disputed or minimized by the evidence of the defendant.

The plaintiff paid the defendant $900 on May 21, 1930, and at that time complained of some of the defects. After this action was commenced the defendant brought a garnishment action against the plaintiff in the .state of Iowa and recovered the balance which the defendant claimed to be due on the contract. It is now contended that the payment of $900 constitutes a waiver of the defects and that the recovery *526 by tbe plaintiff in tbe Iowa court renders tbe plaintiff’s present cause of action res adjudicata.

• An owner may acquiesce in tbe builder’s failure to perform a contract and by accepting and paying for tbe work may waive bis claim for damages on account of defects. Tbe partial payment made by tbe plaintiff does not constitute a waiver because be protested and continued to protest concerning tbe defects and refused to pay tbe balance. Under tbe facts in this case tbe plaintiff cannot be held to have waived his claim for damages by accepting tbe work because of tbe fact that be was compelled to use tbe defective work. He was living in tbe bouse at tbe time tbe work was. done and of necessity continued to occupy it after tbe defective work was completed. Marchand v. Perrin, 19 N. D. 794, 124 N. W. 1112; Williston, Contr. rev. ed. § 724; 9 Am. Jur. Building and Construction Contracts, § 53. In Zambakian v. Leson, 77 Colo. 183, 234 P. 1065, tbe court discusses tbe acceptance of tbe work as a waiver of defective performance, and says: “However, tbe mere acceptance, without more, does not preclude tbe owner from recouping damages for defective performance, especially where be could not do otherwise than accept tbe situation in which tbe contractor bad placed him. 9 C. J. 802, and cases in note in 23 A.L.R. 1435.”

■ Defendant’s contention that tbe matter in litigation is res adjudicata cannot be sustained. Ees adjudicata was not pleaded as a defense. Neither tbe record nor tbe judgment entered in tbe Iowa court was presented in evidence in this action. It does not appear that tbe plaintiff interposed a counterclaim in tbe Iowa suit, or in any way presented to tbe court tbe question of damages arising from tbe alleged breach of contract. Tbe judgment of tbe Iowa court operates as an estoppel only as to those matters or questions therein’ litigated and determined. 15 R. C. L. p. 972; 34 C. J.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Bakke v. Magi-Touch Carpet One Floor & Home, Inc.
2018 ND 273 (North Dakota Supreme Court, 2018)
Biteler's Tower Service, Inc. v. Guderian
466 N.W.2d 141 (North Dakota Supreme Court, 1991)
Gross v. Sta-Rite Industries, Inc.
336 N.W.2d 359 (North Dakota Supreme Court, 1983)
Storebo v. Foss
325 N.W.2d 223 (North Dakota Supreme Court, 1982)
Robertson Companies, Inc. v. Kenner
311 N.W.2d 194 (North Dakota Supreme Court, 1981)
Dittmer v. Nokleberg
219 N.W.2d 201 (North Dakota Supreme Court, 1974)
Dobler v. Malloy
214 N.W.2d 510 (North Dakota Supreme Court, 1973)
Alm Construction Company v. Vertin
118 N.W.2d 737 (North Dakota Supreme Court, 1962)
Jones v. Elliott
108 N.W.2d 742 (Nebraska Supreme Court, 1961)
Markman v. Hoefer
106 N.W.2d 59 (Supreme Court of Iowa, 1960)
Shimek v. Vogel
105 N.W.2d 677 (North Dakota Supreme Court, 1960)
Shell v. Schmidt
330 P.2d 817 (California Court of Appeal, 1958)

Cite This Page — Counsel Stack

Bluebook (online)
281 N.W. 898, 68 N.D. 522, 1938 N.D. LEXIS 142, Counsel Stack Legal Research, https://law.counselstack.com/opinion/karlinski-v-p-r-h-lumber-construction-co-nd-1938.