Bruce Construction Corporation v. The United States

324 F.2d 516, 163 Ct. Cl. 97, 1963 U.S. Ct. Cl. LEXIS 141
CourtUnited States Court of Claims
DecidedNovember 15, 1963
Docket479-60
StatusPublished
Cited by78 cases

This text of 324 F.2d 516 (Bruce Construction Corporation v. The United States) is published on Counsel Stack Legal Research, covering United States Court of Claims primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Bruce Construction Corporation v. The United States, 324 F.2d 516, 163 Ct. Cl. 97, 1963 U.S. Ct. Cl. LEXIS 141 (cc 1963).

Opinion

DURFEE, Judge.

This case involves a claim for equitable adjustment for the alleged “additional value” of building block that was used in construction of buildings on the Air Force Base at Homestead, Florida.

The principal issue before us is whether plaintiffs have suffered damages as a result of defendant’s rejection of a building block and the consequent requirement that plaintiffs substitute a different block, where the price paid for the two different blocks was the same.

Plaintiffs entered into a contract, DA 08-123-ENG — 1595, with the Corps of Engineers on September 15, 1954. The contract involved construction of 18 airmen’s dormitories, five mess halls and three bachelor officers’ quarters. The total contract price was $4,867,605.30.

The buildings were to be constructed of concrete building block with exposed surfaces “of a fine texture generally produced in the Florida area which is suitable for painting as distinguished from ‘coarse textured block’ produced for the purpose of receiving stucco or plaster * * (Paragraph 5-02(c) Materials).

Plaintiffs placed an order for suitable block with a supplier. Subsequently, on or about January of 1955 the contracting officer rejected the concrete block submitted by plaintiffs, and required the use of a “sand block.” Plaintiffs then requested additional compensation in the amount of $312,016.60 to defray alleged additional costs. The matter was processed and Modifications Nos. 45 and 46, dated May 13, 1957, and April 4, 1958, respectively, were issued. These Modifications allowed plaintiffs $125,624.39 to compensate them for the cost of additional labor required in handling and placing the block, and for handling and hauling the rejected block. Plaintiffs’ claim of $42,415.98 for the alleged additional value of the sand block over and above the value of the originally specified block was denied by the contracting officer and, ultimately, by the Armed Services Board of Contract Appeals.

Though the price which plaintiffs actually paid for the “sand block” was the same as they would have paid for the original block selected, they contend that the fair market value of the sand block was greater than the purchase price. Essentially then, plaintiffs argue that *518 defendant should not benefit from the bargain price plaintiffs secured from their supplier, but should pay for the actual value of the sand block received by defendant, not merely its actual cost.

Though there is substantial controversy as to the market value of the sand block as of the time of the transaction between plaintiffs and their supplier, for purposes of defendant’s motion for partial summary judgment, we are called upon only to decide the narrow question whether “cost” or “fair market value” controls in the award of an equitable adjustment.

Equitable adjustments in this context are simply corrective measures utilized to keep a contractor whole when the Government modifies a contract. Since the purpose underlying such adjustments is to safeguard the contractor against increased costs engendered by the modification, it appears patent that the measure of damages cannot be the value received by the Government, but must be more closely related to and contingent upon the altered position in which the contractor finds himself by reason of the modification. We held this view in the early case of McFerran v. United States, 39 Ct.Cl. 441 (1904). The contract there involved construction of structures at Fort Ethan Allen. The specifications called for the use of cut stone. The quartermaster in charge required that claimant furnish marble. Judge Weldon, speaking for the court in disallowing the claim, stated (39 Ct.Cl. p. 451):

“ * * * The contract was performed in the country of the marble quarries, and as a result of that situation marble becomes a common material in the trimmings of houses. The findings on that point say that it is not shown that the cost of the marble used by the claimant by the direction of the quartermaster was in excess of the cost of good sound stone of best quality and even color: No allowance is made for this item..”’

Clearly, in that case the holding of tiro court was based on cost and not on fair-market value. The instant case falls-, squarely under, and is controlled by, Mc-Ferran, supra.

The Armed Services Board of Contract Appeals, in its consideration of plaintiffs’ case, assumed plaintiffs’ statement of law, but held against them on a finding of fact that the price plaintiffs had paid for the stone was actually its fair market value. But fair market value is not the measure of damages in this case. This is not to say that in all cases, historical cost is to be the gauge. The more proper measure would seem to be a “reasonable cost.” The concept of “reasonable cost” is not new. Indeed, it has been defined in the following manner:

“A cost is reasonable if, in its nature or amount, it does not exceed that which would be incurred by an ordinary prudent person in the conduct of competitive business. (A.S. P.R. 15-201.3 (1960))”

Use of the “reasonable cost” measure does not constitute “an objective and universal procedure, involving the determination of the reasonable value (or reasonable cost of any contractor similarly situated) of the work involved;” 1 but determination of reasonable cost requires, in and of itself, an objective test. The particular situation in which a contractor found himself at the time the cost was incurred, Appeal of WymanGordon Co., ASBCA 5100 (1959) and the exercise of the contractor’s business judgment, Appeal of Walsh Construction Co., ASBCA 4014 (1957), are but two of the elements that may be examined before ascertaining whether or not a cost was “reasonable.”

But the standard of reasonable cost “must be viewed in the light of a particular contractor’s costs * * * ” 2 *519 [emphasis added], and not the universal, objective determination of what the cost would have been to other contractors at large.

To say that “reasonable cost” rather than “historical cost” should be the measure does not depart from the test applied in the past, for the two terms are often synonymous. And where there is an alleged disparity between “historical” and “reasonable” costs, the historical costs are presumed reasonable.

Since the presumption is that a contractor’s claimed cost is reasonable, the Government must carry the very heavy burden of showng that the claimed cost was of such a nature that it should not have been expended, or that the contractors’ costs were more than were justified in the particular circumstance. 3

Applying the “reasonable cost” test to plaintiffs’ hypothetical situation of a contractor purchasing blocks in New York State and paying haulage to Florida, 4 would probably result in a disallowance of the haulage costs since the Government could probably overcome the presumption of reasonableness.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

JAAAT Technical Services, LLC
Armed Services Board of Contract Appeals, 2021
Missouri Department of Social Services
Armed Services Board of Contract Appeals, 2019
Kellogg Brown & Root Services, Inc.
Armed Services Board of Contract Appeals, 2018
Meridian Engineering Company v. United States
130 Fed. Cl. 147 (Federal Claims, 2016)
BAE Systems San Francisco Ship Repair
Armed Services Board of Contract Appeals, 2016
Parker Excavating, Inc. v. City & County of Denver
2012 COA 180 (Colorado Court of Appeals, 2012)
Kellogg Brown & Root Services Inc. v. United States
103 Fed. Cl. 714 (Federal Claims, 2012)
Metric Construction Co. v. United States
81 Fed. Cl. 804 (Federal Claims, 2008)
International Data Products Corp. v. United States
70 Fed. Cl. 387 (Federal Claims, 2006)
ACE Constructors, Inc. v. United States
70 Fed. Cl. 253 (Federal Claims, 2006)
Conner Brothers Construction Co. v. United States
65 Fed. Cl. 657 (Federal Claims, 2005)
Sab Construction, Inc. v. United States
66 Fed. Cl. 77 (Federal Claims, 2005)
George Sollitt Construction Co. v. United States
64 Fed. Cl. 229 (Federal Claims, 2005)
North American Construction Corp. v. United States
56 Fed. Cl. 73 (Federal Claims, 2003)
M.J. Paquet, Inc. v. New Jersey Department of Transportation
794 A.2d 141 (Supreme Court of New Jersey, 2002)
Thermalon Industries, Ltd. v. United States
51 Fed. Cl. 464 (Federal Claims, 2002)
MJ Paquet, Inc. v. Dept. of Transp.
761 A.2d 122 (New Jersey Superior Court App Division, 2000)
UMC Electronics Co. v. United States
43 Fed. Cl. 776 (Federal Claims, 1999)

Cite This Page — Counsel Stack

Bluebook (online)
324 F.2d 516, 163 Ct. Cl. 97, 1963 U.S. Ct. Cl. LEXIS 141, Counsel Stack Legal Research, https://law.counselstack.com/opinion/bruce-construction-corporation-v-the-united-states-cc-1963.