This text of 96 Ct. Cl. 148 (Ruff v. United States) is published on Counsel Stack Legal Research, covering United States Court of Claims primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Ruff v. United States, 96 Ct. Cl. 148, 1942 U.S. Ct. Cl. LEXIS 109, 1942 WL 4448 (cc 1942).

Opinion

Madden, Judge

delivered the opinion of the court:

In 1938 plaintiff, in response to the defendant’s invitation, bid upon and was awarded the contract for the construction of a new post office building at Beading, Pa. In this suit plaintiff seeks compensation, beyond the amount specified in the contract and already paid him, for three items: (1) the value of a “diner” restaurant building, which, plaintiff says, the defendant agreed that he might salvage from the site, but which was removed by another person,, to whom it belonged; (2) the cost of excavating a large part of the area formerly covered by the Supreme Bealty Company building, which area, plaintiff says, -the defendant represented had been excavated before the contract was made; (3) the extra cost of excavating rock found within. [160]*160a part of the area of excavation for the new building, plaintiff asserting that the existence of this rock was an unexpected condition encountered in the performance of the contract which entitled him to extra compensation under Article 4 of the contract.

As to the claim for the diner, the pertinent facts are •as follows. The defendant sent plaintiff, as a prospective bidder, the proposed specifications which were to be a part ■of the contract. Paragraphs 3-2 and 3-6 of these specifications said, respectively:

3-2. Drawing No. X-l-A relating to conditions of the site is not to become a contract drawing. It is furnished bidders only for such use as they may choose to make of it. The accuracy of data given on this drawing is not guaranteed. The structure known as the “Supreme Realty Company” (21-29 North 5th Street) on Drawing No. X-l-A has been or will be removed to the top of the foundation walls or to the ground level by others. •
*****
3-6. The contract will also include the demolition of all structures on the site, except that known as the “Supreme Realty Company” (27-29 North 5th Street), which will be removed to the top of the foundation walls or to the ground level by others.

Drawing No. X-l-A was a plat of the square- on which the new post'office-was to-be erected. It showed the several tracts making up the square, the names of their former owners, and what structures were on them. One lot was marked “This property from Supreme Realty Company.” The drawing showed a three story brick building occupying this entire lot from Fifth Street to Church Street. The •adjoining lot to the south, fronting on Fifth Street and -extending only a part of the way toward Church Street, was marked “This property from Harvey S. Adams * * •and the drawing showed a “diner” restaurant located on ■the west frontage of the lot. The Supreme Realty Company building had two street numbers, 31 and 33, painted on its ■front in appropriate places. The “diner” had no numbers marked on it but was known to the local post office staff as Nos. 27-29 for mail delivery purposes.

[161]*161Plaintiff read the specification as meaning that the three-story brick building would be removed by others, and that he could, if he got the contract, remove the diner as his own. As he was admonished to do by paragraph 5-4 of the specifications (see finding 3), he gave it a salvage value and reduced his bid by that amount, $7,500.00, which was the reasonable value of the diner. Another bidder, who discovered before the day for submission of bids that the street numbers 27-29, attributed to the Supreme Realty Company building in the specifications, did not belong to the building shown on the drawing as that building, asked the defendant for a clarifying statement. The defendant then notified all prospective bidders that it was adding to paragraph 3-6 of the specifications the following language: “The demolition of the ‘Supreme Realty Company’ building at 31-33 North Fifth Street will be included in the contract.”

Plaintiff read this addendum as meaning that the defendant was changing the specifications so. that it now expected, the contractor to remove the three-story brick building, which, plaintiff had supposed, was to have been removed by others under the original specifications. We have concluded that that was the meaning reasonably to be gathered from the defendant’s writings. The statement in the original specifications that “the contractor is required to include the demolition of all structures on the site except that known, as the Supreme Realty Company .* * *, which will be removed * * * by others” applied exactly to the three-story brick building as the only building not to be removed, so far as the drawing was concerned, and applied with equal exactness to the physical situation disclosed by an inspection of the site, except as to the street numbers assigned to the building in the specifications. It was not to be expected that a prospective bidder would look at the numbers on the building, when he was told that it was to be removed by someone else. The fact that there were no numbers on the diner made it even more unlikely that one inspecting the site would, by chance, discover the defendant’s error. We think, therefore, that the defendant is bound by the meaning which plaintiff reasonably gathered from the defend[162]*162ant’s writings, and must compensate plaintiff for the loss of the diner which plaintiff expected to get.

The controversy about the excavation under the Supreme Eealty building arose as follows. , Drawing No. X-l-A,, hereinbefore referred to as having been sent out by the defendant with the specifications, contained the legend on the site of the Supreme Eealty Building, which was about 30 feet wide and 228 feet long, “Conor. Basement Floor full length.” This legend was written at about the center of the site as shown on the drawing.

Plaintiff’s prospective subcontractor for the demolition and excavation required by the contract, a Mr. Herfurth, visited the site and made his bid to plaintiff before plaintiff made his bid to the defendant. His examination of the site is described in finding 5. In spite of the fact that he was a demolition and excavation contractor of long experience, and that he had the greatest possible financial interest in not overlooking any work which would be required under the contract, we think that he was, in some degree, careless in his inspection. This carelessness was induced by the erroneous and misleading legend on the defendant’s drawing No. X-l-A. That legend conveyed the meaning that the-site of the building was already excavated. We think that where such an erroneous statement is made in such circumstances that it has the natural effect of misleading the person to whom it is addressed, its consequences are not removed by a caveatory admonition such as that of paragraph 3-2 of the specifications (see finding 3). We recognize that the language of that paragraph, “The accuracy of data given on this drawing is not guaranteed,” is a pointed warning. Yet the statement on the drawing ought not to have been made at all if the one who made it had no knowledge of the facts. If on the other hand, he made an examination and reached the same conclusion that Herfurth did, the discovery of the true situation would have been as unexpected to him as it was to Herfurth and plaintiff. If that is what happened, plaintiff would seem to be entitled to the relief contemplated by Article 4 of the contract, discussed hereinafter. Plaintiff’s bid did not contemplate the [163]*163necessity for excavation under a considerable part of the Supreme Eealty Building. His omission was induced by the defendant’s misleading drawing.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

URS Group, Inc. v. Tetra Tech FW, Inc.
181 P.3d 380 (Colorado Court of Appeals, 2008)
Granite Construction Co. v. United States
37 Cont. Cas. Fed. 76,240 (Court of Claims, 1991)
North Slope Technical Ltd. v. United States
34 Cont. Cas. Fed. 75,430 (Court of Claims, 1988)
Weeks Dredging & Contracting, Inc. v. United States
34 Cont. Cas. Fed. 75,356 (Court of Claims, 1987)
Fox v. United States
32 Cont. Cas. Fed. 73,128 (Court of Claims, 1984)
Morrison-Knudsen Company, Inc. v. The United States
397 F.2d 826 (Court of Claims, 1968)
Ambrose-Augusterfer Corporation v. The United States
394 F.2d 536 (Court of Claims, 1968)
Bignold v. King County
399 P.2d 611 (Washington Supreme Court, 1965)
H. L. Yoh Co., Inc. v. United States
288 F.2d 493 (Court of Claims, 1961)
H. L. Yoh Co. v. United States
153 Ct. Cl. 104 (Court of Claims, 1961)
Appalachian Floor Co. v. United States
144 Ct. Cl. 11 (Court of Claims, 1958)
International Potato Corporation v. United States
161 F. Supp. 602 (Court of Claims, 1958)
Potashnick v. United States
105 F. Supp. 837 (Court of Claims, 1952)
Western Well Drilling Co. v. United States
96 F. Supp. 377 (N.D. California, 1951)
Wunderlich v. United States
117 Ct. Cl. 92 (Court of Claims, 1950)
Moorman v. United States
82 F. Supp. 1010 (Court of Claims, 1949)
Orino v. United States
77 F. Supp. 938 (Court of Claims, 1948)
Loftis v. United States
76 F. Supp. 816 (Court of Claims, 1948)

Cite This Page — Counsel Stack

Bluebook (online)
96 Ct. Cl. 148, 1942 U.S. Ct. Cl. LEXIS 109, 1942 WL 4448, Counsel Stack Legal Research, https://law.counselstack.com/opinion/ruff-v-united-states-cc-1942.