Robert L. Guyler v. The United States

314 F.2d 506, 161 Ct. Cl. 159, 1963 U.S. Ct. Cl. LEXIS 65
CourtUnited States Court of Claims
DecidedMarch 6, 1963
Docket19-60
StatusPublished
Cited by15 cases

This text of 314 F.2d 506 (Robert L. Guyler v. The United States) is published on Counsel Stack Legal Research, covering United States Court of Claims primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Robert L. Guyler v. The United States, 314 F.2d 506, 161 Ct. Cl. 159, 1963 U.S. Ct. Cl. LEXIS 65 (cc 1963).

Opinions

JONES, Chief Judge.

Plaintiff sues for the value of extra-work which he alleges he was required! to do in completing a construction contract. This work he asserts he was not required to do by the terms of the contract.

In April 1956 plaintiff entered into a contract for the construction of facilities at Ozona, Texas, consisting of 12 buildings and utilities.

The standard form contract with certain additions contained certain provisions which are set out in detail in findings 1, 2, and 3. The main issue turns upon whether the contract required the painting of the interior walls of masonry. The plaintiff contends that by the terms of the contract he was to finish the buildings and to paint the exterior and the woodwork of the interior, but that the contract and specifications required only the interior masonry walls of the operations room to be painted. Paragraph 27-8 of the specifications specifies that interior areas to be painted should include all wood, metal, concrete masonry units, gypsum board, cement-asbestos board, and similar surfaces, except where otherwise specified. Paragraph 27-8 (g) of the specifications, around which most of the controversy revolves, is as follows:

“Masonry Surfaces. — Interior exposed masonry surfaces, indicated on the drawings to be painted, shall be painted in accordance with the attached Figure1.”

It should be noted that this section refers to “attached Figure 1.” Reverting to Figure 1, it is found that it did not [507]*507specify what surfaces were to be painted. However, one of the drawings clearly and .specifically provided that the walls behind •and beside the platform in the operations room of the Operations Building •should be painted black. This drawing did not provide for the painting of any other interior masonry walls. No other sheet of drawings in the entire original set of drawings designated any other interior masonry walls to be painted.

When he made his preparations for bidding, plaintiff obtained bids from subcontractors for the painting work. The lowest bid figure for the painting was submitted by George E. Biediger & Son, a firm with more than 20 years’ experience in paint contracting. The plans, drawings, and specifications were furnished in advance to the subcontractor. After examining these, the subcontractor based its estimate and submitted a bid on its interpretation of the contract, drawings, and specifications as calling for painting the interior masonry of only one room, the operations room, a portion of which was designated to be painted black in the drawing referred to above.

In submitting his bid on the entire contract, plaintiff used the Biediger bid as the basis for that part of his bid covering painting. In June 1956, after the work had been started but before it had progressed to the point of painting the interior masonry walls, the resident engineer forwarded to plaintiff for pricing a number of changes in the specifications in the form of proposed supplemental specifications accompanied by revised drawings. Plaintiff’s project manager went over the proposed changes in detail to determine what additional costs would be involved in the supplemental specifications. One of the numerous changes outlined in the supplemental specifications was to be made in paragraph 27-8(g), as follows:

Delete “, indicated on the drawings to be painted,”.

Plaintiff accordingly submitted a quotation of price revisions resulting from the supplemental specifications totaling $11,146.99 additional. No price was quoted for any additional painting of interior masonry walls.

On August 20, 1956, modification No. 3 was issued by the contracting officer and executed by plaintiff’s authorized representative. This modification provided for an increase in the contract price of $11,146.99.

Plaintiff executed and accepted the modification No. 3 without any reservation, qualification, or protest. His representative did not attach any significance to the deletion of the particular phrase. The contracting officer apparently attached no significance to the fact that the plaintiff’s detailed breakdown for the work under modification No. 3 did not include any amount for interior masonry painting, nor did the contracting officer call the matter to the plaintiff’s attention. He stated the basis of his action later in his findings of fact, which included the following:

“1. The phrase ‘indicated on the drawings to be painted’ in sub-paragraph 27-8 (g) was deleted from the specifications only to clarify the painting requirements.
“2. This phrase was meaningless since the drawings are not intended to provide painting instructions. The painting requirements are contained in the specifications as is evident by paragraphs 27-8(a), 27-9 and 27-11, all of which indicate painting of interior masonry surfaces.”

This interpretation of the specification, however, was not communicated to plaintiff until after the disagreement about the requirements of the contract.

Some two months later plaintiff was advised by the defendant’s resident engineer that all interior masonry walls in the various buildings covered by the contract were required to be painted. This information was conveyed by plaintiff to his painting subcontractor, who refused to paint any interior masonry walls except the interior masonry walls of the Operations Building which were designated as a painting requirement in the contract drawing. His reason for re[508]*508fusing to do the painting was that the contract did not require the painting of any other interior masonry walls, and that his bid did not include the cost of painting any other interior masonry walls.

Plaintiff then notified the defendant of the position taken by the subcontractor and stated that if the additional work was required he should be compensated for it as extra work. He listed the painting items for the interior masonry walls in the 11 buildings on the project. The engineer replied that the painting-was required under the terms of the contract as revised and that plaintiff’s request for additional payment had been forwarded to the contracting officer for consideration. The plaintiff, under protest, had his subcontractor paint the additional interior masonry walls in dispute and paid the subcontractor for the performance of that work the sum of $3,496.14, which is found to be fair and reasonable compensation for the painting of the interior masonry walls other than the walls in the Operations Building.

A conference was held by the contracting officer and his representatives with representatives of the plaintiff in February 1957, to consider plaintiff’s claim for equitable adjustment under the “Changes” clause in the general provisions of the contract. At that meeting plaintiff’s representatives took the position that under the terms of the original contract, .paragraph 27-8(g) of the specifications and the accompanying drawings specifically limited the painting of interior masonry walls to those so shown on the drawings. The contracting officer disputed this, claiming that before it was modified, the contract required the painting of all interior masonry walls. However, he stated that, if he was in error, there had been a mutual mistake and that in such event plaintiff’s right to reimbursement for the cost of the additional painting would not be prejudiced by the fact that plaintiff had executed modification No. 3.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Nicholson v. United States
29 Fed. Cl. 180 (Federal Claims, 1993)
United States v. Pickett's Food Service
360 F.2d 338 (Fifth Circuit, 1966)
The Jack Stone Company, Inc. v. The United States
344 F.2d 370 (Court of Claims, 1965)
Copco Steel & Engineering Co. v. The United States
341 F.2d 590 (Court of Claims, 1965)
Kaiser Industries Corporation v. The United States
340 F.2d 322 (Court of Claims, 1965)
Hol-Gar Manufacturing Corp. v. The United States
351 F.2d 972 (Court of Claims, 1965)
Wingate Construction Co. v. United States
164 Ct. Cl. 131 (Court of Claims, 1964)
Wpc Enterprises, Incorporated v. The United States
323 F.2d 874 (Court of Claims, 1964)
WPC Enterprises, Inc. v. United States
323 F.2d 874 (Court of Claims, 1963)
Stein Bros. Mfg. Co. v. The United States
337 F.2d 861 (Court of Claims, 1963)
Stein Bros. Mfg. Co. v. United States
337 F.2d 861 (Court of Claims, 1963)
W. H. Edwards Engineering Corp. v. United States
161 Ct. Cl. 322 (Court of Claims, 1963)
Robert L. Guyler v. The United States
314 F.2d 506 (Court of Claims, 1963)

Cite This Page — Counsel Stack

Bluebook (online)
314 F.2d 506, 161 Ct. Cl. 159, 1963 U.S. Ct. Cl. LEXIS 65, Counsel Stack Legal Research, https://law.counselstack.com/opinion/robert-l-guyler-v-the-united-states-cc-1963.