MEMORANDUM
GASCH, Senior District Judge.
I. INTRODUCTION
This breach of contract case was brought by plaintiff Maurice Electrical Supply Company, Inc. (“Maurice Electric”) against defendant Anderson Safeway Guard Rail Corporation for its alleged failure to perform a contract to supply high mast lighting poles to be used in the construction of the Ft. McHenry Toll Plaza in Maryland. The Court’s jurisdiction over the matter is based on diversity, plaintiff being a Delaware corporation whose sole place of business is the District of Columbia, defendant being a Michigan corporation.
The lighting poles were to have been manufactured by Skyline Structures (“Skyline”), a former subdivision of defendant Anderson that has since been sold to Valmont Industries. The other significant players in this action are Potomac Lighting Associates (“Potomac” or “Potomac Lighting”), the Baltimore-Washington area manufacturer’s representative for Skyline, and Snowden River Corporation (“Snowden River”), a subsidiary of the Walter Truland Corporation (“Walter Truland”), which was the electrical subcontractor on the toll plaza project. However, neither Potomac, Snowden River or Walter Truland is a party to this suit.
This case was tried to the bench October 21-22, 1985. Based on the findings of fact and conclusions of law announced below, the Court will enter judgment for the defendant.
II. FINDINGS OF FACT
Plaintiff Maurice Electric is in the business of selling electrical fixtures for use in construction projects. In mid-November, 1983, Snowden River contacted plaintiff to obtain price quotes on electric fixtures to be used in the construction of the Ft. McHenry Toll Plaza. Snowden River’s parent corporation, Walter Truland, was hoping to win the electrical construction subcontract on the plaza, to be built for the Maryland Department of Transportation. In order to furnish Snowden River’s needs, Maurice Electric contacted several electrical manufacturer’s representatives to obtain price quotations on,
inter alia,
high mast lighting poles and luminaires. One of those contacted was Potomac Lighting, representative for defendant’s Skyline subdivision.
Potomac obtained a bill of materials and specifications for the high mast poles directly from Walter Truland. These were forwarded to Skyline by overnight courier service. However, pages from Skyline’s own catalogue, depicting standard lighting poles, were also attached to the specifications and bill of materials sent to Skyline. Def’s Exh. U. The information packet did not include a line drawing depicting the length of the individual segments or shafts that would make up each lighting pole. A few days later, Helen Hart, a Skyline quotation clerk, called Fred McGiffin, general partner of Potomac, with price quotes on individual items for Maurice Electric. McGiffin transmitted the price quotes to Marvin Kogod, an official of Maurice Electric. They were notably lower than any other price quotes Maurice Electric received for the items,
and therefore Maurice relied upon the Skyline price quotes when it submitted its price bid for resale to Snowden River shortly thereafter.
Unfortunately for all concerned, it appears the prices quoted to Maurice Electric were based on standard Skyline products and not those specially made to the specifications of the Maryland Department of Transportation (“DOT”). In fact, Skyline is unable to produce high mast lighting poles for Maryland because DOT always requires its poles to consist of 30-foot segments, or shafts,
plus
an overlap joint. Skyline’s production equipment cannot handle lengths of metal over 30 feet long. The Maryland DOT consistently requires additional features on high mast poles that Skyline finds uneconomical to produce. Therefore, according to Bernard Jenkins, who at all relevant times was national sales manager at Skyline, Skyline generally declined to sell high mast lighting for Mary
land DOT projects, although it did provide other items for DOT projects.
In early January, 1984, Jenkins became aware that Skyline had supplied price quotes on individual high mast lighting poles for potential use in a Maryland DOT project. Because he knew that Skyline could not usually satisfy DOT specifications, he contacted Potomac on January 3 and asked McGiffin to send a blueprint or line drawing that usually accompanied specifications. This was the line drawing that had been omitted from the specifications sent in November, and it showed that the DOT project indeed required 30-foot-plus-lap joint segments. On January 11, 1984, Maurice Electric learned that it was likely Walter Truland would win the electrical construction contract on the plaza, and in that event, would purchase its supplies (through its Snowden River subsidiary) from Maurice. Based on this information, Marvin Kogod of Maurice placed an order over the phone on the same day, through Potomac Lighting, for Skyline products. The order restated the prices originally quoted in November.
Potomac transmitted this oral purchase order to Skyline on January 12. Upon learning of it, Jenkins became upset because he now knew Skyline could not meet the Maryland DOT specifications. He testified he called McGiffin and Earl Dins-more, a limited partner of Potomac, and told them both that Skyline could not provide the lighting poles. Potomac officials, fearing they would offend a good customer if they could not fill Maurice Electric’s order, did not tell Maurice Electric that Skyline was not interested in the sale.
On January 31, Potomac received a written purchase order from Maurice Electric, confirming the terms of the oral order. This was forwarded to Skyline, where it was received no later than February 3, 1984. Rather than inform Maurice Electric of Skyline’s reaction to the order, Dinsmore and McGiffin attempted to get Skyline to perform. They made several phone calls to Skyline to get the supplier to prepare “submittal drawings” which had to be submitted to DOT before final acceptance for use in the project. Jenkins testified that the Potomac officials pressed him to submit drawings based on Skyline’s standard pole, in an attempt to get that item accepted by DOT instead of the special-made item. Jenkins refused to do so.
Skyline
never sent Maurice Electric an order acceptance form, as it routinely did for orders it intended to fill. By letter dated March 6, 1984, Skyline notified Potomac it would reject plaintiffs order, and Potomac so notified plaintiff. Defendant Anderson Safeway sold the Skyline division to Valmont Industries a few days later.
By this time, Maurice Electric felt it was committed to supply Snowden River with high mast poles and related items and had to obtain these from other suppliers, at a cost of $47,303 above what it would have paid Skyline.
A few words are in order about the general practices of the parties and the industry.
Free access — add to your briefcase to read the full text and ask questions with AI
MEMORANDUM
GASCH, Senior District Judge.
I. INTRODUCTION
This breach of contract case was brought by plaintiff Maurice Electrical Supply Company, Inc. (“Maurice Electric”) against defendant Anderson Safeway Guard Rail Corporation for its alleged failure to perform a contract to supply high mast lighting poles to be used in the construction of the Ft. McHenry Toll Plaza in Maryland. The Court’s jurisdiction over the matter is based on diversity, plaintiff being a Delaware corporation whose sole place of business is the District of Columbia, defendant being a Michigan corporation.
The lighting poles were to have been manufactured by Skyline Structures (“Skyline”), a former subdivision of defendant Anderson that has since been sold to Valmont Industries. The other significant players in this action are Potomac Lighting Associates (“Potomac” or “Potomac Lighting”), the Baltimore-Washington area manufacturer’s representative for Skyline, and Snowden River Corporation (“Snowden River”), a subsidiary of the Walter Truland Corporation (“Walter Truland”), which was the electrical subcontractor on the toll plaza project. However, neither Potomac, Snowden River or Walter Truland is a party to this suit.
This case was tried to the bench October 21-22, 1985. Based on the findings of fact and conclusions of law announced below, the Court will enter judgment for the defendant.
II. FINDINGS OF FACT
Plaintiff Maurice Electric is in the business of selling electrical fixtures for use in construction projects. In mid-November, 1983, Snowden River contacted plaintiff to obtain price quotes on electric fixtures to be used in the construction of the Ft. McHenry Toll Plaza. Snowden River’s parent corporation, Walter Truland, was hoping to win the electrical construction subcontract on the plaza, to be built for the Maryland Department of Transportation. In order to furnish Snowden River’s needs, Maurice Electric contacted several electrical manufacturer’s representatives to obtain price quotations on,
inter alia,
high mast lighting poles and luminaires. One of those contacted was Potomac Lighting, representative for defendant’s Skyline subdivision.
Potomac obtained a bill of materials and specifications for the high mast poles directly from Walter Truland. These were forwarded to Skyline by overnight courier service. However, pages from Skyline’s own catalogue, depicting standard lighting poles, were also attached to the specifications and bill of materials sent to Skyline. Def’s Exh. U. The information packet did not include a line drawing depicting the length of the individual segments or shafts that would make up each lighting pole. A few days later, Helen Hart, a Skyline quotation clerk, called Fred McGiffin, general partner of Potomac, with price quotes on individual items for Maurice Electric. McGiffin transmitted the price quotes to Marvin Kogod, an official of Maurice Electric. They were notably lower than any other price quotes Maurice Electric received for the items,
and therefore Maurice relied upon the Skyline price quotes when it submitted its price bid for resale to Snowden River shortly thereafter.
Unfortunately for all concerned, it appears the prices quoted to Maurice Electric were based on standard Skyline products and not those specially made to the specifications of the Maryland Department of Transportation (“DOT”). In fact, Skyline is unable to produce high mast lighting poles for Maryland because DOT always requires its poles to consist of 30-foot segments, or shafts,
plus
an overlap joint. Skyline’s production equipment cannot handle lengths of metal over 30 feet long. The Maryland DOT consistently requires additional features on high mast poles that Skyline finds uneconomical to produce. Therefore, according to Bernard Jenkins, who at all relevant times was national sales manager at Skyline, Skyline generally declined to sell high mast lighting for Mary
land DOT projects, although it did provide other items for DOT projects.
In early January, 1984, Jenkins became aware that Skyline had supplied price quotes on individual high mast lighting poles for potential use in a Maryland DOT project. Because he knew that Skyline could not usually satisfy DOT specifications, he contacted Potomac on January 3 and asked McGiffin to send a blueprint or line drawing that usually accompanied specifications. This was the line drawing that had been omitted from the specifications sent in November, and it showed that the DOT project indeed required 30-foot-plus-lap joint segments. On January 11, 1984, Maurice Electric learned that it was likely Walter Truland would win the electrical construction contract on the plaza, and in that event, would purchase its supplies (through its Snowden River subsidiary) from Maurice. Based on this information, Marvin Kogod of Maurice placed an order over the phone on the same day, through Potomac Lighting, for Skyline products. The order restated the prices originally quoted in November.
Potomac transmitted this oral purchase order to Skyline on January 12. Upon learning of it, Jenkins became upset because he now knew Skyline could not meet the Maryland DOT specifications. He testified he called McGiffin and Earl Dins-more, a limited partner of Potomac, and told them both that Skyline could not provide the lighting poles. Potomac officials, fearing they would offend a good customer if they could not fill Maurice Electric’s order, did not tell Maurice Electric that Skyline was not interested in the sale.
On January 31, Potomac received a written purchase order from Maurice Electric, confirming the terms of the oral order. This was forwarded to Skyline, where it was received no later than February 3, 1984. Rather than inform Maurice Electric of Skyline’s reaction to the order, Dinsmore and McGiffin attempted to get Skyline to perform. They made several phone calls to Skyline to get the supplier to prepare “submittal drawings” which had to be submitted to DOT before final acceptance for use in the project. Jenkins testified that the Potomac officials pressed him to submit drawings based on Skyline’s standard pole, in an attempt to get that item accepted by DOT instead of the special-made item. Jenkins refused to do so.
Skyline
never sent Maurice Electric an order acceptance form, as it routinely did for orders it intended to fill. By letter dated March 6, 1984, Skyline notified Potomac it would reject plaintiffs order, and Potomac so notified plaintiff. Defendant Anderson Safeway sold the Skyline division to Valmont Industries a few days later.
By this time, Maurice Electric felt it was committed to supply Snowden River with high mast poles and related items and had to obtain these from other suppliers, at a cost of $47,303 above what it would have paid Skyline.
A few words are in order about the general practices of the parties and the industry. Like many other electrical manufacturers, Skyline had no sales staff of its own, but rather relied on manufacturer’s representatives to promote its products and make sales.. In this capacity, Potomac was authorized to obtain price quotes from the manufacturer and convey these quotes to the purchaser. Because electrical supplies were frequently resold for use by electrical construction contractors, officials at Skyline were aware that oral quotes had to be supplied quickly and that these oral quotes would be relied on in preparation of bids by the contractors and by the middlemen who resold to the contractors. However, as McGiffin of Potomac Lighting testified, verbal quotes are often subject to negotiation.
Because of the time constraints on the bid process, purchase orders are frequently placed orally and then confirmed at a later date in writing. Nonetheless, most manufacturers have a policy of home office acceptance before any sale is finalized, and in the case of Skyline, such home office acceptance was required to be in writing to clarify the specifications and the terms of the sale.
Although it was rare for Skyline to reject an order and decline to issue an acceptance form, this did happen three or four times a year. Potomac, as manufacturer’s representative, transmitted purchase orders and order acceptances between Skyline and its customers. However, by express terms of its agreement with Skyline, Potomac was not authorized to enter into contracts on behalf of Skyline or to accept any orders without home office approval by Skyline.
Based on these facts, the Court must determine whether a contract existed between Skyline and Maurice Electric, and if there be one, whether its enforcement is barred by the Statute of Frauds. If the Court determines that no contract was formed, it must consider whether judgment in favor of plaintiff is nonetheless required under the doctrine of promissory estoppel.
III. CONCLUSIONS OF LAW
Plaintiff alleges a contract existed on the theory that defendant’s November price quotation constituted an offer that plaintiff accepted by its telephone purchase order of January 11, 1984. In the alternative, plaintiff contends the November price quote was a promise upon which plaintiff reasonably relied in bidding on the contract to resell the high mast lighting poles and fixtures to Snowden River. Therefore, plaintiff contends it should recover on a theory of promissory estoppel.
A.
Existence of a Contract
A necessary step in the formation of any contract is the making of an offer creating in the offeree the power of acceptance. This case involves a sale of goods within the ambit of the Uniform Commercial Code (“U.C.C.”), codified at D.C.Code 28:1-101
et seq.
“Offer” is not defined by the U.C.C. and therefore the Court must look to the common law and law merchant. D.C.Code § 28:1-103.
The general rule is that a mere price quotation is not an offer, but rather is an invitation to enter into negotiations or a mere suggestion to induce offers by others.
USEMCO, supra,
483 A.2d at 93;
Maryland Supreme, supra,
369 A.2d at 1024, and authorities cited therein. It is the submission of a purchase order by a buyer in response to a price quote that usually constitutes the offer.
J.B. Moore, supra,
273 S.E.2d at 556. However, whether a price quote may be considered an offer in any given case is a question of fact dependent on the nature of the particular acts or conduct and the circumstances surrounding the transaction.
USEMCO, supra,
483 A.2d at 93;
Maryland Supreme, supra,
369 A.2d at 1024. An offer must be definite and certain, and must be made under circumstances evidencing the express or implied intent of the offeror that its acceptance shall constitute a binding contract.
Id.; J.B. Moore, supra,
273 S.E.2d at 557.
Neither case law nor the facts of this case support plaintiff’s argument that the November price quote should be treated as an exception to the general rule. Plaintiff contends that it is the “usage of the trade” in the electrical supply business to treat price quotes as offers that may be accepted by submitting a purchase order based on the quote.
To this end, plaintiff offered the testimony of Marvin Kogod, an official of plaintiff. Although he testified that price quotes were regarded as offers within the trade (Tr. p. 39), and although he referred to the November price quote as defendant’s “offer” (Tr. p. 11), the facts belie Kogod’s conclusory statements.
Generally, the testimony of one officer of one of the parties as to that party’s
practices is insufficient to establish a usage of the trade.
See Wright v. Commercial and Savings Bank,
297 Md. 148, 464 A.2d 1080, 1084 (1983). Apart from Kogod’s testimony, the record does not support the conclusion that as a general rule in the electrical supply industry offers are made with sufficient detail as to be “definite and certain,” or that they are made with the intent of the seller that their acceptance shall bind the seller to a contract. In fact, McGiffin of Potomac Lighting testified that suppliers’ price quotes were often the subject of negotiation (Tr. p. 167). The other manufacturer’s representative, Earl Dins-more, testified that in general, a sale was not “finalized” until a purchase order was accepted by a manufacturer. (Tr. p. 216). Dinsmore and McGiffin testified that in most sales, home office acceptance was required, either orally or in writing. (Tr. p. 153, p. 216.).
Where the electrical product is to be used in a construction project, even with home office approval, the sale is conditional upon the ultimate purchaser’s winning the construction contract, and upon approval of submittal drawings and materials by the party letting the construction contract (in this case, Maryland DOT). (Tr. pp. 104-105, testimony of Stephen M. L’Etoile; Tr. p. 119, testimony of Vernon L. Eytchisan). Because of the home office approval requirement, it cannot be said as a rule that when price quotes are given by electrical manufacturers they intend to be bound if a purchase order issues in response.
Even if the Court were to conclude that as a general usage of the trade, price quotes did constitute offers to contract, that finding would be superseded in this case by evidence of a course of dealing between these two specific parties. See D.C.Code § 28:1-205(4). Since Skyline traditionally followed a policy of requiring written home office acceptance when dealing with its customers through Potomac,
see supra,
note 6, and since there is evidence that Maurice Electric received just such á written acceptance form when it placed another order with Skyline through Potomac,
see
Def’s Exh. C, Skyline’s course of dealing with plaintiff shows that Skyline did not intend to be bound until it accepted plaintiff’s orders by issuing an acceptance form. Maurice Electric had no reason to expect otherwise. Therefore, the Court concludes that price quotes were not generally made by Skyline with the express intention that it be bound, and the course of dealing between the parties would negate any implied intention to be bound.
The Court further concludes that the particular price quote here could not be deemed an offer. Nothing about the nature of the quote or the circumstances surrounding it would take it out of the general rule that a price quote is merely an invitation to negotiate.
USEMCO, supra,
483 A.2d at 93. It was simply a statement of price for three individual high mast poles of varying heights. It did not specify quality or quantity, time and place of delivery, or terms of payment. There was no promise that the quote would remain open for a specified period of time.
The Court con-
eludes that the price quote was not definite or certain enough to be capable of being converted into a contract by plaintiffs acceptance.
See id.
This result is unchanged even though the Court agrees with plaintiff that the knowledge of Potomac, as agent for Skyline, must be imputed to the principal.
See id.
at 96. In this case, Potomac had obtained the specifications for the Maryland DOT project prior to obtaining the price quotes from Skyline. Therefore, Skyline may be estopped from denying the price quotes were based on products meeting DOT specifications. However, the price quotes were nonetheless for individual items and still lacked the other key terms identified above. Furthermore, as noted above, through its course of dealing with Skyline, plaintiff had notice that defendant did not as a general rule intend to be bound until it issued written home office acceptance, thereby negating any inference that the price quote be deemed an offer.
See USEMCO, supra,
483 A.2d at 93.
While there have been several cases where courts found a price quote or bid amounted to an offer, they may be distinguished from the case at hand. In
J.B. Moore, supra,
the Virginia Supreme Court held an electrical supplier was bound by its price quote to a contractor that relied upon the quote in submitting its bid for a construction job. The court found an exception to the general rule because the supplier actually filled out the purchase order and submitted it to the buyer for signing, with the intent that it be an offer. 273 S.E.2d at 557.
Similarly, in
Maryland Supreme, supra,
the Maryland Court of Appeals found a price quote by a cement supplier to a construction contractor constituted an offer where the price quote was accompanied by a promise to supply cement in such quantity as the contractor required for a specific construction job, and added that “the price will be guaranteed throughout the job.”
Id.
Thus
Maryland Supreme
involved not a mere price quote, but rather an offer to enter into a requirements contract with the price guaranteed. Those facts, neither of which are present here, took
Maryland Supreme
out of the ordinary case.
Id.
Plaintiff wrongly relies on
Janke Construction Co. v. Vulcan Materials Co.,
386 F.Supp. 687 (W.D.Wis.1974),
aff'd,
527 F.2d 772 (7th Cir.1976), for the proposition that “a price quotation by a subcontractor supplier or manufacturer constitutes an offer to sell, and implies the intent that its acceptance shall constitute a binding contract.” (Plaintiffs Proposed Findings of Fact and Conclusions of Law, p. 6). In
Janke,
a construction contractor relied on price quotes received from a pipe supplier in preparing its bid on a construction contract. Quite to the contrary of what plaintiff states, the court in
Janke
found the price quote, unless made irrevocable, could not be the basis of making a contract; that the mere use of the price quote in preparing the bid did not create a binding contract; and that in any case, no contract existed.
Janke, supra,
386 F.Supp. at 691-92. Rather, the court found for plaintiff on a theory of promissory estoppel.
In sum, Skyline’s November price quote was not an offer, and therefore, plaintiff could not have formed a contract by issuing its purchase order. Since Skyline eventually rejected plaintiff’s order, Skyline was not bound in contract.
Cf.
Solway Decorating Co. v. Merando, Inc.,
240 A.2d 361, 362 (D.C.App.1968) (finding no contract existed where plaintiff relied on subcontractor’s price quote in preparing bid on prime contract);
N. Litterio & Co. v. Glassman Construction Co.,
319 F.2d 736, 739 (D.C.Cir.1963) (finding same).
B.
Promissory estoppel
The question remains as to whether defendant may be held liable on a theory of promissory estoppel because plaintiff relied upon defendant’s price quote in bidding on the contract to resell the poles and fixtures to Snowden River.
See Solway Decorating Co. v. Merando, Inc.,
264 A.2d 501 (D.C.App.1970) (hereinafter
“Solway II’); Solway Decorating Co. v. Merando, Inc.,
240 A.2d 361 (D.C.App.1968) (hereinafter
“Solway
I”);
Litterio, supra,
319 F.2d 736.
“To hold a party liable under the doctrine of promissory estoppel ‘there must be a promise which reasonably leads the promisee to rely on it to his detriment, with injustice otherwise not being avoidable.’ ”
Solway I, supra,
240 A.2d at 362, citing
Litterio, supra,
319 F.2d at 739. In the case at hand, defendant and its agent were aware that its price quotes were generally relied upon by purchasers in preparing bids for resale. However, in this case, the Court finds, plaintiff’s reliance was not reasonable because of the great difference in price quotes received from defendant and the other two potential suppliers.
See supra,
note 1. While the price quotes obtained from the other two suppliers were quite similar to each other, they were anywhere from 50 to almost 100 percent higher than the price quotes given by defendant. In such circumstances, plaintiff’s reliance was not justifiable.
Cf. Edward Joy Co. v. Noise Control Products, Inc. et al,
111 Misc.2d 64, 443 N.Y.S.2d 361, 362 (N.Y.Sup.Ct.1981) (Promissory estoppel not applicable where defendant made honest mistake in preparing quote and plaintiff had reason to doubt accuracy of quote);
Drennan v. Star Paving Co.,
51 Cal.2d 409, 333 P.2d 757, 761 (1958) (prime contractor may not reasonably rely on subcontractor’s bid if prime contractor had reason to know bid was in error). Therefore, plaintiff may not recover based on promissory estoppel.
IV. CONCLUSION
In sum, the November price quotes on high mast poles were not certain or definite nor were they given by Skyline with the intent that it be bound. Therefore, they were not an offer creating in plaintiff the power of acceptance. Rather, plaintiff’s purchase order constituted the offer here, an offer which defendant rejected. There was no contract.
Furthermore, although plaintiff relied to its detriment on defendant’s price quotes, such reliance was not reasonable in light of the substantial difference in prices quoted by defendant and other would-be suppliers. Therefore, plaintiff may not recover on a theory of promissory estoppel. For the foregoing reasons, judgment will be entered in favor of defendant.