This text of 898 F.3d 383 (Sierra Club v. State Water Control Board) is published on Counsel Stack Legal Research, covering Court of Appeals for the Fourth Circuit primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Sierra Club v. State Water Control Board, 898 F.3d 383 (4th Cir. 2018).

Opinion

TRAXLER, Circuit Judge:

Virginia certified under Section 401 of the Clean Water Act that it had reasonable assurance that certain activities regarding the construction of a natural gas pipeline would not degrade the state's water. Several environmental groups, individuals, and other entities petition for review. Concluding that Virginia's issuance of the certification was not arbitrary and capricious, we deny the petition for review.

I.

A. The Project

The Mountain Valley Pipeline Project (the "Project") is a proposed interstate natural gas transmission pipeline that will be approximately 303 miles long and 42 inches in diameter and will transport natural gas from Wetzel County, West Virginia, to Pittsylvania County, Virginia. Much of the Project crosses topography with steep slopes and areas that are susceptible to landslides. Approximately 106 miles of the pipeline will be located in Virginia, and constructing the pipeline requires 385 stream crossings and 144 wetland crossings in the Commonwealth.

Mountain Valley Pipeline, LLC ("MVP") proposes to construct and operate the pipeline in Virginia and West Virginia. 1 MVP generally would use a 125-foot-wide construction right-of-way in uplands and a 75-foot-wide right-of-way through wetlands. MVP would retain a 50-foot right-of-way permanently to operate the pipeline. For overland construction, MVP would generally need to clear the land of trees and vegetation, then dig a trench of up to nine feet in depth, fracturing and blasting rock where necessary. Waterbody crossings would be dry open-cut crossings; MVP would temporarily divert the water from the construction area and bury the pipeline two to four feet below the streambed.

B. Federal Statutes and Agencies

The Natural Gas Act ("NGA") requires that a party seeking to build or operate a natural gas pipeline must obtain authorization from the Federal Energy Regulatory Commission ("FERC") in the form of a "certificate of public convenience and necessity." The NGA and its implementing regulations set out the process for obtaining such a certificate. See 15 U.S.C. § 717 et seq. ; 18 C.F.R. § 157.1 et seq. ; see generally East Tenn. Nat. Gas. Co. v. Sage , 361 F.3d 808 , 818 (4th Cir. 2004).

When FERC receives an application for a certificate of public convenience and necessity, it undertakes review of the environmental impacts of the proposed project under the NGA and under the National Environmental Policy Act ("NEPA"), 42 U.S.C. §§ 4321 et seq. , usually by accepting input from the public and producing an environmental impact statement ("EIS"). FERC serves as the "lead agency," coordinating the needed governmental authorizations, see 15 U.S.C. § 717n(b), including the one central to this case, Virginia's state water-quality certification under the Clean Water Act ("CWA").

NEPA sets out the procedures FERC must employ in considering the environmental impacts of agency actions. See Robertson v. Methow Valley CitizensCouncil , 490 U.S. 332 , 350, 109 S.Ct. 1835 , 104 L.Ed.2d 351 (1989). Council on Environmental Quality regulations require FERC to draft an EIS in stages, first preparing a draft and inviting public comment thereon, then considering the comments and responding to them, possibly by modifying its analysis. See 40 C.F.R. §§ 1503.1 (a), 1503.4(a). In this way, the draft and the receipt of comments serve as a "springboard for public comment." National Comm. for the New River, Inc. v. FERC , 373 F.3d 1323 , 1328 (D.C. Cir. 2004) (internal quotation marks omitted).

Because construction of the Project would involve discharge of dredged and fill materials into wetlands and waterways, MVP needed not only a certificate of public convenience and necessity from FERC, but also approval from the U.S. Army Corps of Engineers (the "Corps") under Section 404 of the CWA. See 33 U.S.C. § 1344 (a) ; AES Sparrows Point LNG, LLC v. Wilson , 589 F.3d 721 , 724 (4th Cir. 2009). Section 404 approval from the Corps may come in the form of an issuance of individual permits or the Corps' verification of the coverage "within the scope of an existing general permit, which acts as a standing authorization for developers to undertake an entire category of activities deemed to create only minimal environmental impact."

Crutchfield v. County of Hanover, Va. , 325 F.3d 211 , 214 (4th Cir. 2003) (citing 33 U.S.C. § 1344 (e) ; 33 C.F.R.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Cite This Page — Counsel Stack

Bluebook (online)
898 F.3d 383, Counsel Stack Legal Research, https://law.counselstack.com/opinion/sierra-club-v-state-water-control-board-ca4-2018.