This text of 449 F.3d 1195 (Medlin Construction Group, Ltd. v. Harvey) is published on Counsel Stack Legal Research, covering Court of Appeals for the Federal Circuit primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Medlin Construction Group, Ltd. v. Harvey, 449 F.3d 1195, 2006 U.S. App. LEXIS 13485, 2006 WL 1492982 (Fed. Cir. 2006).

Opinion

PROST, Circuit Judge.

Medlin Construction Group, Ltd. (“Med-lin”) appeals from the summary judgment decision of the Armed Services Board of Contract Appeals (the “Board”), Medlin Constr. Group, Ltd., A.S.B.C.A. No. 54,-772, 05-1 BCA ¶ 32,939, which held that Medlin is not entitled to recover certain increased costs incurred in performing Contract No. DACA63-02-C-0015 (the “Contract”) with the Army. Because we find that Medlin’s interpretation is the only reasonable interpretation that gives meaning to all of the Contract provisions, we reverse and remand.

I. BACKGROUND

On July 29, 2002, the government awarded the Contract to Medlin for the construction of the vehicle maintenance facility at Fort Hood, Texas, at the fixed price of $14,267,011.06. The Contract specifications describe the products to be used in performing this section of the Contract. Paragraph 2.2, “FIBER VOID RETAINERS,” provides as follows:

2.2 FIBER VOID RETAINERS
2.2.1 Polystyrene Rigid Insulation
Polystyrene rigid insulation shall conform to ASTM C 578, Type V, VI, or *1197 VII, square edged. Size shall be 38 mm thick by 400 mm in height by 1 meter in length, unless otherwise indicated.
2.2.2 Precast Concrete
Precast concrete units shall have a compressive strength of no less than 17 MPa, reinforced with 150 mm by 150 mm by W1.4 WWF wire mesh, and 300 mm (height) by 1 m (length) by 40 mm (thickness) in size unless indicated.

Fort Hood Contract No. DACA63-02-C-0015, Specification Section 03100A, Paragraph 2.2. There is no dispute between the parties that paragraph 2.2 permits the contractor to choose between two materials for fiber void retainers: polystyrene rigid insulation (“polystyrene retainer”) or precast concrete (“concrete retainer”). Part 3.1.3 describes the installation of the Fiber Void Retainers, and provides that “[fjiber void retainers shall be installed, continuously, on both sides of fiber voids placed under grade beams in order to retain the cavity after the fiber voids biodegrade.”

Contract Drawing Sequence No. A-3101 states at “FOUNDATION NOTES: (SLAB — ON—GRADE),” note 11, that “ALL GRADE BEAMS SUPPORTED BY DRILLED PIERS SHALL HAVE VOIDS UNDER THEM. (SEE ‘TYP. GRADE BEAM VOID’ DETAIL THIS SHEET.)” The “TYPICAL GRADE BEAM VOID DETAIL” shows an arrow pointing to the retainer and states “41 x 304 x 914 mm PRECAST CONC. CONT. RETAINERS.” The detail also provides that the “BOTTOM OF GRADE BEAMS SHALL BE FORMED w/ PLYWOOD OF SUFFICIENT THICKNESS TO SUPPORT WET CONCRETE DURING PLACEMENT (TYP. ALL BEAMS)” and that “51 x 152mm PRECAST CONC. SPACERS @ 914mm O.C.” should be used at the joints of the side retainers.

The Contract contains the standard clauses for construction contracts, including FAR 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997) which provides:

(a) The Contractor shall keep on the work site a copy of the drawings and specifications and shall at all times give the Contracting Officer access thereto. Anything mentioned in the specifications and not shown on the draivings, or shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both. In case of difference [sic] between drawings and specifications, the specifications shall govern ....
(b) Wherever in the specifications or upon the drawings the words “directed”, “required”, “ordered”, “designated”, “prescribed”, or words of like import are used, it shall be understood that the “direction”, “requirement”, “order”, “designation”, or “prescription”, of the Contracting Officer is intended ....
(c) Where “as shown,” “as indicated”, “as detailed”, or words of similar import are used, it shall be understood that the reference is made to the drawings accompanying this contract unless stated otherwise. The word “provided” as used herein shall be understood to mean “provide complete in place,” that is “furnished and installed.”

Fort Hood Contract No. DACA63-02-C-0015 at 00700-67 (emphasis added).

By letter dated January 27, 2003, Medlin wrote to the Central Texas Office of the Army Corps of Engineers stating that Medlin was informed at informal discussions with Army representatives that the government believes the contract requires Medlin to install “precast concrete continuous retainers at all grade beams.” Letter *1198 from Jerry Hallmark, Project Manager, to Tom Hamilton, U.S. Army Corps of Eng’rs., Cent. Tex. Office (Jan. 27, 2003) (emphasis added). Medlin then stated its understanding of the Contract: that the specifications provide two options regarding the type of retainers that can be used, namely, polystyrene or concrete retainers, and that the contractor can choose between either of the two types. Id. Medlin also stated that it calculated its bid for the Contract based on the less expensive polystyrene material and the cost savings were reflected in its bid. Id.

In a subsequent letter, Medlin sent a sketch of “the construction of space beneath grade beams and utilization of specified polystyrene rigid insulation" and provided information on the polystyrene retainers Medlin proposed to use. Letter from Jerry Hallmark, Project Manager, to Tom Hamilton, U.S. Army Corp of Eng’rs., Cent. Tex. Office (Jan. 31, 2003) (emphasis added).

The government responded by letter dated March 17, 2003, in which it stated that there is “no conflict between the drawings and the specifications” because “the specifications list[] two acceptable products and [the] drawings authoriz[e] the use of only one of the acceptable products[,] ... pre-cast concrete retainers ....” Letter from Michael C. Bormann, Administrative Contracting Officer, to Medlin Construction Group, Ltd. (Mar. 17, 2003).

Medlin subsequently filed a claim with the Board in the amount of $56,140.38 1 for the extra costs associated with furnishing precast concrete fiber void retainers, as opposed to polystyrene retainers.

The issues, as framed by the Board, are “whether there is a conflict between the specification and drawing detail, and if so, ... [whether] that conflict [can] be resolved by the normal rules of contract interpretation and the application of the SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION clause.” Before the Board, both the government and Med-lin argued that the specification and drawing detail were not in conflict, albeit for different reasons. The government argued there was no conflict because although the specifications allowed some “latitude or option to the contractor, the ... drawings narrow the latitude or options by providing additional details regarding the grade beam void retainers.” Narrowing the options available, according to the government, did not present a conflict.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

RLB Contracting, Inc.
Armed Services Board of Contract Appeals, 2023
Flint v. United States
Federal Claims, 2022
Devine v. United States
Federal Claims, 2021
Labatte v. United States
Federal Claims, 2019
Yee v. United States
Federal Claims, 2017
Zebel LLC v. United States
Federal Claims, 2017
Stromness Mpo, LLC v. United States
134 Fed. Cl. 219 (Federal Claims, 2017)
Idaho Stage LLC v. United States
131 Fed. Cl. 727 (Federal Claims, 2017)
Tidewater Contractors, Inc. v. United States
131 Fed. Cl. 372 (Federal Claims, 2017)
Canpro Investments, Ltd v. United States
130 Fed. Cl. 320 (Federal Claims, 2017)
ECCI-C Metag, JV
Armed Services Board of Contract Appeals, 2015

Cite This Page — Counsel Stack

Bluebook (online)
449 F.3d 1195, 2006 U.S. App. LEXIS 13485, 2006 WL 1492982, Counsel Stack Legal Research, https://law.counselstack.com/opinion/medlin-construction-group-ltd-v-harvey-cafc-2006.