Fortec Constructors v. The United States

760 F.2d 1288, 32 Cont. Cas. Fed. 73,474, 1985 U.S. App. LEXIS 14776
CourtCourt of Appeals for the Federal Circuit
DecidedApril 30, 1985
DocketAppeal 84-1579
StatusPublished
Cited by231 cases

This text of 760 F.2d 1288 (Fortec Constructors v. The United States) is published on Counsel Stack Legal Research, covering Court of Appeals for the Federal Circuit primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Fortec Constructors v. The United States, 760 F.2d 1288, 32 Cont. Cas. Fed. 73,474, 1985 U.S. App. LEXIS 14776 (Fed. Cir. 1985).

Opinion

BISSELL, Circuit Judge.

Fortec Constructors appeals from the decision of the Armed Services Board of Contract Appeals (ASBCA or Board) sustaining a contracting officer’s final decision denying Fortec’s claim for an equitable adjustment. We affirm.

BACKGROUND

Fortec was awarded contract DACA6381-C-0041 by the United States Army Engineer District of Fort Worth on December 31, 1980. This contract called for the construction of a 32,000 square foot one-story medical clinic at Fort Sam Houston, San Antonio, Texas. The clinic structure rests on a concrete distribution rib slab foundation consisting of reinforced concrete beams, exterior grade beams and interior grade beams (distribution ribs).

The project commenced on February 3, 1981. After preparing the foundation area and placing the reinforcing steel (rebar) in the exterior grade and interior distribution rib trenches, Fortec began tying the rebar on June 3, 1981, for the first 25-foot concrete pour and continued to tie the rebar and pour the slab in 25-foot pours with the eighth and final pour on July 29, 1981. On July 28, 1981, a dispute arose about the manner of installing the rebar. Fortec had installed the rebar in the interior distribution ribs so that it butted up against the exterior grade beams without extending or lapping into them. The Corps area engineer informed Fortec that the rebar was improperly placed because the interior distribution rib rebar did not overlap the exterior grade beam rebar. On September 10, 1981, the Corps directed Fortec to immediately remove the concrete at the junction of the interior distribution ribs and exterior grade beams to determine if the rebar placement complied with contract documents. Thirty-five junctions were demol *1290 ished; only two junctions met lapping requirements.

DRAWINGS AND SPECIFICATIONS

The contract drawings, sheet S-3, sequence number 55, sections 01 and 02 and details 19 and 20, see Fortec Constructors, 84-2 BCA ¶ 17,328, at 86,345 (1984), schematically illustrate the rebar in the distribution ribs intersecting the rebar in the exterior grade beams. Drawing sheet S-6, sequence number 58, provides two instructions of importance under the “Reinforcing Steel Notes,” specifically notes 3 and 4, which provide:

3. DETAILING OF CONCRETE REINFORCEMENT AND ACCESSORIES SHALL BE IN ACCORDANCE WITH ACI 315-74.
4. REINFORCING BARS MAY BE SPLICED ONLY AS SHOWN ON THE DRAWINGS EXCEPT THAT REINFORCING DESIGNATED AS ‘CONTINUOUS’ MAY BE CONTACT LAP SPLICED 36 BARS DIAMETERS. LAP SPLICES OF CONTINUOUS REINFORCING SHALL BE MADE OVER SUPPORTS FOR BOTTOM BARS AND FOR INTERMEDIATE BARS AND AT MIDSPAN FOR TOP BARS. AT EXTERIOR SUPPORTS, TOP BARS SHALL BE HOOKED DOWN AND BOTTOM BARS SHALL BE HOOKED UP.

Fortec, 84-2 BCA at 86,346.

American Concrete Institute (ACI) Standard 315-74, incorporated by reference in note 3, provides the details of concrete reinforcement. The schematic illustrating the reinforcement in ACI 315-74 is shown at figure 2-9 entitled “Typical Wall Details.” Two alternative structures are shown for double curtain reinforcement.

Typical intersection details for double curtain reinforcement

The detail on the left shows the rebar from the interior distribution rib stopping at the exterior grade beam. The detail on the right depicts the rebar from the interior distribution rib running into the exterior beam. No instruction was provided which would have enabled Fortec to select either of these two alternative reinforcement schemes.

ASBCA DECISION

The Board’s decision reported at 84-2 BCA H 17,328 found that the drawings, notes, and details were not a model of clarity. It held that a finding of ambiguity was not necessary in order to go outside the four corners of the contract to resolve the dispute as to whether Fortec complied with the terms of the contract. It found:

[Tjhat a concrete distribution rib type of foundation is commonly found in the area to provide ‘continuous reinforcement’ in foundations which have a tendency to deflect due to either the absorption or loss of moisture at the perimeter of buildings (findings 7, 8). Experts from both sides agreed without exception that in distribution rib type of founda *1291 tions seen and found in the area, the interior rebars always lap or tie into exterior support (finding 9). We conclude from the foregoing that the Government has established a prima facie case that in the locality of the construction, there is a trade practice when installing a concrete distribution rib type of foundation to lap interior rebars from the distribution ribs into the exterior grade beams.

Fortee, 84-2 BCA at 86,351 (emphasis in original).

It also found that the hook configuration at the ends of the interior rebar should have indicated to an experienced contractor that the interior rebar was to be lapped over the exterior grade beam rebar. Fortee had installed the rebar in accordance with ACI 315-74 figure 2-9 details showing the interior distribution rib rebar stopping at the exterior grade beam. The Board held that Fortee was not entitled to an equitable adjustment for having been required to demolish and reconstruct the thirty-three noncomplying intersections between the interi- or and exterior grade beams.

OPINION

This court has jurisdiction under 28 U.S.C. § 1295(a)(10) (1982) to hear an appeal pursuant to 41 U.S.C. § 607(g)(1)(A) (1982). Our standard of review is governed by 41 U.S.C. § 609(b) (1982):

[A]ny contract provision, regulation, or rules of law to the contrary, the decision of the agency board on any question of law shall not be final or conclusive, but the decision on any question of fact shall be final and conclusive and shall not be set aside unless the decision is fraudulent, or arbitrary, or capricious, or so grossly erroneous as to necessarily imply bad faith, or if such decision is not supported by substantial evidence.

The interpretation of a contract is a question of law to be decided by the court and an administrative interpretation of a contract is not binding on the court. B.D. Click Company v. United States, 614 F.2d 748, 752, 222 Ct.Cl. 290 (1980). However, a Board’s interpretation of a contract will be given careful consideration and accorded great respect. George Hyman Construction Co. v. United States, 564 F.2d 939, 944, 215 Ct.Cl. 70 (1977).

Fortee contends that the Board’s reliance on trade practice to change the meaning of an unambiguous contract was contrary to law.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Korte Construction Company
Armed Services Board of Contract Appeals, 2024
CKY, Inc.
Armed Services Board of Contract Appeals, 2020
Veterans Evaluation Services, Inc. v. United States
132 Fed. Cl. 610 (Federal Claims, 2017)
Hendrickson v. United States
131 Fed. Cl. 489 (Federal Claims, 2017)
Shaw v. United States
131 Fed. Cl. 181 (Federal Claims, 2017)
Langkamp v. United States
131 Fed. Cl. 85 (Federal Claims, 2017)
Vandesande v. United States
Federal Claims, 2017
Per Aarsleff A/S v. United States
121 Fed. Cl. 603 (Federal Claims, 2015)
Allen v. United States
119 Fed. Cl. 461 (Federal Claims, 2015)
Ensley, Inc. v. United States
114 Fed. Cl. 704 (Federal Claims, 2014)
Villanueva v. Barcroft
822 F. Supp. 2d 726 (N.D. Ohio, 2011)
Nvt Technologies, Inc. v. United States
370 F.3d 1153 (Federal Circuit, 2004)
Summitt Investigative Service, Inc. v. Herman
34 F. Supp. 2d 16 (District of Columbia, 1998)
United States v. Adrian Pielago, Maria Varona
135 F.3d 703 (Eleventh Circuit, 1998)
Northrop Grumman Corporation v. Goldin
136 F.3d 1479 (Federal Circuit, 1998)
United States v. Pielago
Eleventh Circuit, 1998

Cite This Page — Counsel Stack

Bluebook (online)
760 F.2d 1288, 32 Cont. Cas. Fed. 73,474, 1985 U.S. App. LEXIS 14776, Counsel Stack Legal Research, https://law.counselstack.com/opinion/fortec-constructors-v-the-united-states-cafc-1985.