Delaware Riverkeeper Network v. Federal Energy Regulatory Commission

753 F.3d 1304, 78 ERC 2016, 410 U.S. App. D.C. 137, 2014 WL 2535225, 78 ERC (BNA) 2016, 2014 U.S. App. LEXIS 10523, 44 Envtl. L. Rep. (Envtl. Law Inst.) 20126
CourtCourt of Appeals for the D.C. Circuit
DecidedJune 6, 2014
Docket13-1015
StatusPublished
Cited by84 cases

This text of 753 F.3d 1304 (Delaware Riverkeeper Network v. Federal Energy Regulatory Commission) is published on Counsel Stack Legal Research, covering Court of Appeals for the D.C. Circuit primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Delaware Riverkeeper Network v. Federal Energy Regulatory Commission, 753 F.3d 1304, 78 ERC 2016, 410 U.S. App. D.C. 137, 2014 WL 2535225, 78 ERC (BNA) 2016, 2014 U.S. App. LEXIS 10523, 44 Envtl. L. Rep. (Envtl. Law Inst.) 20126 (D.C. Cir. 2014).

Opinions

Opinion for the Court filed by Senior Circuit Judge EDWARDS.

[1307]*1307Opinion filed by Circuit Judge BROWN concurring in part and concurring in the judgment.

Concurring opinion filed by Senior Circuit Judge SILBERMAN.

EDWARDS, Senior Circuit Judge:

In May 2012, the Federal Energy Regulatory Commission (“Commission” or “FERC”) issued a certificate of public convenience and necessity to Tennessee Gas Pipeline Company, L.L.C. (“Tennessee Gas”), authorizing it to build and operate the Northeast Upgrade Project (“Northeast Project”). The project included five new segments of 30-inch diameter pipeline, totaling about 40 miles, and modified existing compression and metering infrastructure. Petitioners, Delaware River-keeper Network, New Jersey Highlands Coalition, and Sierra Club, New Jersey Chapter (collectively, “Riverkeeper”), contend, inter alia, that in approving the Northeast Project, FERC violated the National Environmental Policy Act (“NEPA”), 42 U.S.C. §§ 4321-4370h, by: (1) segmenting its environmental review of the Northeast Project — i.e., failing to consider the Northeast Project in conjunction with three other connected, contemporaneous, closely related, and interdependent Tennessee Gas pipeline projects — and (2) failing to provide a meaningful analysis of the cumulative impacts of these projects to show that the impacts would be insignificant.

The Northeast Project upgraded a portion of a much longer natural gas pipeline known as the 300 Line. Taken together, the Northeast Project and the three other connected, closely related, and interdependent Tennessee Gas upgrade projects on the 300 Line constituted a complete upgrade of almost 200 miles of continuous pipeline. FERC was responsible for the environmental review of these projects because, under the Natural Gas Act, any party seeking to construct a facility for the transportation of natural gas in interstate commerce must first obtain a certificate of public convenience and necessity from the Commission. 15 U.S.C. § 717f(c)(l)(A). And before FERC may issue such a certificate, it must satisfy the requirements of NEPA by identifying and evaluating the environmental impacts of the proposed action. This means that FERC was required to prepare an Environmental Assessment (“EA”) and, if significant impacts were found, to prepare a more comprehensive Environmental Impact Statement (“EIS”). 40 C.F.R. § 1501.4.

The 300 Line carries natural gas from wells in western Pennsylvania to points of delivery east of Mahwah, New Jersey. When it was first constructed in the 1950s, the entire pipeline was built of 24-inch diameter pipe, with compressor stations located every several miles to keep the gas moving through the pipeline. The 300 Line has a Western Leg and an Eastern Leg. Expansions to the Western Leg of the pipeline added 30-inch diameter pipe and allowed it to accommodate skyrocketing natural gas production in the Marcel-lus Shale region, a drilling area that spreads across western Pennsylvania and neighboring states. By 2010, the Western Leg consisted of parallel, connected 24-inch and 30-inch pipes, while the Eastern Leg consisted almost entirely of 24-inch pipe.

In 2010, the pipeline’s owner, Tennessee Gas, commenced construction of what has turned out to be a complete overhaul of the Eastern Leg of the 300 Line. Tennessee Gas’s upgrades to the Eastern Leg have included construction of new 30-inch pipe segments, as well as renovations to compression and monitoring infrastructure. As with the Western Leg, the improvements to the Eastern Leg produced [1308]*1308parallel and connected 24-inch and 30-inch pipes. The result was fifteen interlocking loop segments of new pipeline that completed a full and continuous upgrade of the Eastern Leg of the 300 Line.

Tennessee Gas submitted four separate project proposals to FERC for the upgrade work on the Eastern Leg. The four upgrade projects — the third being the Northeast Project — were reviewed separately by FERC, approved, and then constructed in rapid succession between 2010 and 2013.

In November 2011, FERC completed the EA for the Northeast Project — the project that is the subject of the petition for review in this case — and recommended a Finding of No Significant Impact. FERC’s NEPA review of the Northeast Project did not consider any of the other upgrade projects, even though the first upgrade project was under construction during FERC’s review of the Northeast Project, and even though the applications for the second and fourth upgrade projects were pending before FERC while it considered the Northeast Project application. In May 2012, the Commission approved the Northeast Project, incorporating its EA and the Finding of No Significant Impact and issuing a certificate of public convenience and necessity to Tennessee Gas. Term. Gas Pipeline Co., 139 FERC ¶ 61,161, 2012 WL 1934728 (May 29, 2012) (“Order”).

Petitioners contend that FERC violated NEPA when it segmented its review of the Northeast Project, giving no consideration to that project in conjunction with the three other connected, contemporaneous, closely related, and interdependent Eastern Leg projects. Petitioners also claim that FERC failed to provide a meaningful analysis of the cumulative impacts of these projects to show that the impacts would be insignificant.

FERC argues that because each project resulted in a measurable increase in the pipeline’s overall capacity, the agency was justified in completing the NEPA analysis of the Northeast Project separately from the other projects. But FERC’s position cannot be squared with the record, which shows that by May 2012, when FERC issued the certificate for the Northeast Project, it was clear that the entire Eastern Leg was included in a complete overhaul and upgrade that was physically, functionally, and financially connected and interdependent. During the pendency of Tennessee Gas’s Northeast Project application, the other three projects that would constitute the revamped Eastern Leg were either under construction or were also pending before the Commission for environmental review and approval. Given the self-evident interrelatedness of the projects as well as their temporal overlap, the Commission was obliged to consider the other three other Tennessee Gas pipeline projects when it conducted its NEPA review of the Northeast Project.

Under applicable NEPA regulations, FERC is required to include “connected actions,” “cumulative actions,” and “similar actions” in a project EA. 40 C.F.R. § 1508.25(a). “Connected actions” include actions that are “interdependent parts of a larger action and depend on the larger action for their justification.” Id. § 1508.25(a)(l)(iii). The four pipeline improvement projects are certainly “connected actions.”

There is a clear physical, functional, and temporal nexus between the projects. There are no offshoots to the Eastern Leg. The new pipeline is linear and physically interdependent; gas enters the system at one end, and passes through each of the new pipe sections and improved compressor stations on its way to extraction points beyond the Eastern Leg. The upgrade [1309]

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Healthy Gulf v. Haaland
District of Columbia, 2025
City of Port Isabel v. FERC
111 F.4th 1198 (D.C. Circuit, 2024)
Corner Post, Inc. v. Board of Governors
603 U.S. 799 (Supreme Court, 2024)
El Puente v. United States Army Corps of Engineers
100 F.4th 236 (D.C. Circuit, 2024)
Wilderness Society v. Haaland
District of Columbia, 2024
Trenton Threatened Skies Inc v. FAA
90 F.4th 122 (Third Circuit, 2024)
John S. Lowman, IV v. Federal Aviation Administration
83 F.4th 1345 (Eleventh Circuit, 2023)
Seia v. Ferc
Ninth Circuit, 2023
Center for Biological Diversity v. FERC
67 F.4th 1176 (D.C. Circuit, 2023)
Gulf Restoration Network v. Debra Haaland
47 F.4th 795 (D.C. Circuit, 2022)

Cite This Page — Counsel Stack

Bluebook (online)
753 F.3d 1304, 78 ERC 2016, 410 U.S. App. D.C. 137, 2014 WL 2535225, 78 ERC (BNA) 2016, 2014 U.S. App. LEXIS 10523, 44 Envtl. L. Rep. (Envtl. Law Inst.) 20126, Counsel Stack Legal Research, https://law.counselstack.com/opinion/delaware-riverkeeper-network-v-federal-energy-regulatory-commission-cadc-2014.