Rockwell International Corp. v. United States

127 S. Ct. 1397, 167 L. Ed. 2d 190, 20 Fla. L. Weekly Fed. S 116, 549 U.S. 457, 2007 U.S. LEXIS 3778, 75 U.S.L.W. 4138, 25 I.E.R. Cas. (BNA) 1377
CourtSupreme Court of the United States
DecidedMarch 27, 2007
Docket05-1272
StatusPublished
Cited by648 cases

This text of 127 S. Ct. 1397 (Rockwell International Corp. v. United States) is published on Counsel Stack Legal Research, covering Supreme Court of the United States primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Rockwell International Corp. v. United States, 127 S. Ct. 1397, 167 L. Ed. 2d 190, 20 Fla. L. Weekly Fed. S 116, 549 U.S. 457, 2007 U.S. LEXIS 3778, 75 U.S.L.W. 4138, 25 I.E.R. Cas. (BNA) 1377 (U.S. 2007).

Opinions

[460]*460Justice Scalia

delivered the opinion of the Court.

The False Claims Act, 31 U. S. C. §§ 3729-3733, eliminates federal-court jurisdiction over actions under § 3730 of the Act that are based upon the public disclosure of allegations or transactions “unless the action is brought by the Attorney General or the person bringing the action is an original source of the information.” § 3730(e)(4)(A). We decide whether respondent James Stone was an original source.

I

The mixture of concrete and pond sludge that is the subject of this case has taken nearly two decades to seep, so to speak, into this Court. Given the long history and the complexity of this litigation, it is well to describe the facts in some detail.

A

From 1975 through 1989, petitioner Rockwell International Corp. was under a management and operating contract with the Department of Energy (DOE) to run the Rocky Flats nuclear weapons plant in Colorado. The most significant portion of Rockwell’s compensation came in the form of a semiannual “‘award fee,’” the amount of which depended on DOE’s evaluation of Rockwell’s performance in a number of areas, including environmental, safety, and health concerns. United States ex rel. Stone v. Rockwell Int’l Corp., 92 Fed. Appx. 708, 714 (CA10 2004).

From November 1980 through March 1986, James Stone worked as an engineer at the Rocky Flats plant. In the early 1980’s, Rockwell explored the possibility of disposing of the toxic pond sludge that accumulated in solar evapora[461]*461tion ponds at the facility, by mixing it with cement. The idea was to pour the mixture into large rectangular boxes, where it would solidify into “pondcrete” blocks that could be stored onsite or transported to other sites for disposal.

Stone reviewed a proposed manufacturing process for pondcrete in 1982. He concluded that the proposal “would not work,” App. 175, and communicated that conclusion to Rockwell management in a written “Engineering Order.” As Stone would later explain, he believed “the suggested process would result in an unstable mixture that would later deteriorate and cause unwanted release of toxic wastes to the environment.” Ibid. He believed this because he “foresaw that the piping system” that extracted sludge from the solar ponds “would not properly remove the sludge and would lead to an inadequate mixture of sludge/waste and cement such that the ‘pond crete’ blocks would rapidly disintegrate thus creating additional contamination problems.” Id., at 290.

Notwithstanding Stone’s prediction, Rockwell proceeded with its pondcrete project and successfully manufactured “concrete hard” pondcrete during the period of Stone’s employment at Rocky Flats. It was only after Stone was laid off in March 1986 that what the parties have called “insolid” pondcrete blocks were discovered. According to respondents, Rockwell knew by October 1986 that a substantial number of pondcrete blocks were insolid, but DOE did not become aware of the problem until May 1988, when several pondcrete blocks began to leak, leading to the discovery of thousands of other insolid blocks. The media reported these discoveries, 3 Appellants’ App. in No. 99-1351 etc. (CA10), pp. 889-38 to 889-39, and attributed the malfunction to Rockwell’s reduction of the ratio of concrete to sludge in the mixture.

In June 1987, more than a year after he had left Rockwell’s employ, Stone went to the Federal Bureau of Investigation (FBI) with allegations of environmental crimes at Rocky [462]*462Flats during the time of his employment. According to the court below, Stone alleged that

“contrary to public knowledge, Rocky Flats accepted hazardous and nuclear waste from other DOE facilities; that Rockwell employees were ‘forbidden from discussing any controversies in front of a DOE employee’; that although Rocky Flats’ fluid bed incinerators failed testing in 1981, the pilot incinerator remained on line and was used to incinerate wastes daily since 1981, including plutonium wastes which were then sent out for burial; that Rockwell distilled and fractionated various oils and solvents although the wastes were geared for incineration; that Stone believed that the ground water was contaminated from previous waste burial and land application, and that hazardous waste lagoons tended to overflow during and after ‘a good rain,’ causing hazardous wastes to be discharged without first being treated.” App. to Pet. for Cert. 4a.

Stone provided the FBI with 2,300 pages of documents, buried among which was his 1982 engineering report predicting that the pondcrete-system design would not work. Stone did not discuss his pondcrete allegations with the FBI in their conversations.1

Based in part on information allegedly learned from Stone, the Government obtained a search warrant for Rocky Flats, and on June 6, 1989, 75 FBI and Environmental Protection Agency agents raided the facility. The affidavit in support of the warrant included allegations (1) that pondcrete blocks were insolid “due to an inadequate waste-concrete mixture,” App. 429, (2) that Rockwell obtained award fees based on its alleged “ ‘excellent’ ” management of Rocky Flats, id., at 98, and (3) that Rockwell made false statements and concealed material facts in violation of the Resource Conservation and Recovery Act of 1976 (RCRA), 90 Stat. 2811, as amended, 42 [463]*463U. S. C. § 6928, and 18 U. S. C. § 1001. Newspapers published these allegations. In March 1992, Rockwell pleaded guilty to 10 environmental violations, including the knowing storage of insolid pondcrete blocks in violation of RCRA. Rockwell agreed to pay $18.5 million in fines.

B

In July 1989, Stone filed a qui tam suit under the False Claims Act.2 That Act prohibits false or fraudulent claims for payment to the United States, 31 U. S. C. § 3729(a), and authorizes civil actions to remedy such fraud to be brought by the Attorney General, § 3730(a), or by private individuals in the Government’s name, § 3730(b)(1). The Act provides, however, that “[n]o court shall have jurisdiction over an action under this section based upon the public disclosure of allegations or transactions .. . from the news media, unless the action is brought by the Attorney General or the person bringing the action is an original source of the information.” § 3730(e)(4)(A). An “original source” is “an individual who has direct and independent knowledge of the information on which the allegations are based and has voluntarily provided the information to the Government before filing an action under this section which is based on the information.” § 3730(e)(4)(B).

Stone’s complaint alleged that Rockwell was required to comply with certain federal and state environmental laws and regulations, including RCRA; that Rockwell committed numerous violations of these laws and regulations throughout the 1980’s;3 and that, in order to induce the Government [464]

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Lipian v. Frumkin
E.D. Michigan, 2020
Parker v. WI Waterstone
Tenth Circuit, 2019
Chad Brackeen v. David Bernhardt
937 F.3d 406 (Fifth Circuit, 2019)
Pack v. Hickey
Tenth Circuit, 2019
Farar v. Weston
District of Columbia, 2019
M.W. v. D.M.
2018 Ohio 392 (Ohio Court of Appeals, 2018)
United States Ex Rel. Bennett v. Biotronik, Inc.
876 F.3d 1011 (Ninth Circuit, 2017)
Nelson E. Bowers, II v. Estate of Katherine N. Mounger
542 S.W.3d 470 (Court of Appeals of Tennessee, 2017)
Scutellaro v. Capitol Supply, Inc.
District of Columbia, 2017

Cite This Page — Counsel Stack

Bluebook (online)
127 S. Ct. 1397, 167 L. Ed. 2d 190, 20 Fla. L. Weekly Fed. S 116, 549 U.S. 457, 2007 U.S. LEXIS 3778, 75 U.S.L.W. 4138, 25 I.E.R. Cas. (BNA) 1377, Counsel Stack Legal Research, https://law.counselstack.com/opinion/rockwell-international-corp-v-united-states-scotus-2007.