Diggins Equipment Corp. v. United States

35 Cont. Cas. Fed. 75,687, 17 Cl. Ct. 358, 1989 U.S. Claims LEXIS 132, 1989 WL 76015
United States Court of Claims·Decided July 11, 1989·No. No. 137-88C·Published·Cited by 11 cases

Opinion

ORDER

MOODY R. TIDWELL, III, Judge:

This action is before the court on parties’ cross-motions for summary judgment. The dispute involves the proper interpretation of an amendment to a contract provision. Plaintiff contended that the amendment to a provision dealing with the combustion chambers of two boilers would have exclusive application to the combustion chambers. Defendant claimed that the amendment referred to the boilers as a whole.

FACTS

Defendant, acting through the United States Army Corps of Engineers, issued a solicitation for bids for the refurbishing of two boilers. Potential bidders were given copies of the contract and drawings, and were encouraged to visit the site. The solicitation stated that all technical questions on plans and specifications were to be directed to Mr. J. Caspe of the New York District Corps of Engineers and a telephone number was provided. Plaintiff, Diggins Equipment Corp., noticed what appeared to be a discrepancy in Section 7.1 of the contract, dealing with the combustion chambers, and in May 1983 called the number provided in the solicitation. Plaintiff [359] sought clarification of whether the refractory located beneath the floor of the combustion chambers in the two boilers was to be removed during the course of demolition. Either Mr. Caspe or a person in his office instructed plaintiff to contact Tectonic Engineering, the firm which had prepared the plans and specifications. Plaintiff accordingly telephoned Tectonic Engineering and spoke with Mr. Louis Ares, who advised that the Corps of Engineers was preparing an amendment that would answer plaintiffs question. Amendment No. 4 to Section 7.1 soon followed on May 31, 1983.

On July 13, 1983, plaintiff was awarded the contract. Plaintiff’s first action was to remove and replace the brickwork, refractory and insulation within the combustion chambers as per Section 7.1 and Amendment No. 4. Plaintiff interpreted the section and its amendment as applying only to the combustion chambers. Soon thereafter, plaintiff was notified by defendant that plaintiff’s interpretation was inconsistent with the contract and that plaintiff was required to perform work outside the combustion chamber, i.e., to remove and replace the insulation and tiles in the walls and the roofs of the boilers, and while doing so support outside water, gas and electric lines. Plaintiff disagreed with defendant, but under protest performed the additional work in the amount $79,733.42. Plaintiff then filed a claim for equitable adjustment with the contracting officer. Plaintiff’s claim was denied. Having exhausted its administrative remedies, plaintiff brought a complaint in this court. Defendant responded with a motion for summary judgment, to which plaintiff cross-moved.

DISCUSSION

Summary judgment is appropriate when there are no genuine issues of material fact in dispute and the moving party is entitled to judgment as a matter of law. RUSCC 56(c). Both parties are in agreement that there are no issues of material fact in dispute and that this case deals with interpretation of a contract — strictly a matter of law. The issue before the court, then, is whether or not Amendment No. 4 to Section 7.1 is ambiguous. A contract is ambiguous if it sustains the interpretations advanced by both parties. Max Drill Inc. v. United States, 192 Ct.Cl. 608, 627, 427 F.2d 1233, 1245 (1970). However, both interpretations must be reasonable. Tri-Cor, Inc. v. United States, 198 Ct.Cl. 187, 211, 458 F.2d 112, 126 (1972). In addition, contract terms are not to be rendered ambiguous by the mere fact that the parties disagree as to their meanings. There must be a reasonable uncertainty of meaning. ITT Arctic Services, Inc. v. United States, 207 Ct.Cl. 743, 767, 524 F.2d 680, 692-93 (1975); Southern Constr. Co. v. United States, 176 Ct.Cl. 1339, 1361-62, 364 F.2d 439, 453 (1966).

To determine whether an ambiguity indeed existed, the court in this instance needed only look to the contractual language. Section 7.1 reads:

Bridge walls exposed on all sides to radiant heat and the products of combustion shall be constructed of super-duty refractory not less than 18 inches thick; walls having only the front side exposed to radiant heat and the products of combustion shall have front facing and cap constructed of 9 inches of super duty refractory and back facing of not less than 9 inches of low duty firebrick. Base of the wall shall be a common brick.

Amendment No. 4 states:

All brickwork, refractory and insulation in the two boilers shall be replaced with materials of a similar type and thickness as the existing materials.

The interpretation of Amendment No. 4, in light of Section 7.1, is clear. Section 7.1 deals exclusively with the combustion chambers, and any amendment to that section would necessarily apply only to the combustion chambers as well. It is implausible to think that the combustion chamber provision could be stretched to include removal of an outside steel casing, demolition and replacement of insulation and tiles on the walls and roof, and support of outside gas, water, and high voltage electric lines, as well as removal and re[360] placement of the brickwork, refractory and insulation within the combustion chambers. The court also notes that Amendment No. 4 made reference to brickwork, etc., “in” the two boilers. Work outside of the boiler was never mentioned in either Section 7.1 or Amendment No. 4. It is apparent that the scope of the work to be performed by plaintiff was limited to the inner parts of the two boilers and specifically, the combustion chambers. Thus, upon analysis of the contract provisions, the court finds that only one interpretation can reasonably be sustained by the contract; i.e., only work inside of the combustion chamber was required. The court does not find the contract to be ambiguous.

Free access — add to your briefcase to read the full text and ask questions with AI

Diggins Equipment Corp. v. United States, 35 Cont. Cas. Fed. 75,687, 17 Cl. Ct. 358, 1989 U.S. Claims LEXIS 132, 1989 WL 76015 (cc 1989).

35 Cont. Cas. Fed. 75,687 (Diggins Equipment Corp. v. United States) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Premier Office Complex of Parma, LLC v. United States
134 Fed. Cl. 83 (Federal Claims, 2017)
Shaw v. United States
131 Fed. Cl. 181 (Federal Claims, 2017)
Oenga v. United States
96 Fed. Cl. 479 (Federal Claims, 2010)
Wyoming Sawmills, Inc. v. United States
90 Fed. Cl. 148 (Federal Claims, 2009)
West Bay Builders, Inc. v. United States
85 Fed. Cl. 1 (Federal Claims, 2008)
Input/Output Technology, Inc. v. United States
44 Fed. Cl. 65 (Federal Claims, 1999)
Analytical & Research Technology, Inc. v. United States
42 Cont. Cas. Fed. 77,228 (Federal Claims, 1997)