Dairyland Power Cooperative v. United States

123 Fed. Cl. 220, 2015 U.S. Claims LEXIS 1166, 2015 WL 5247583
CourtUnited States Court of Federal Claims
DecidedSeptember 9, 2015
Docket12-902C
StatusPublished
Cited by1 cases

This text of 123 Fed. Cl. 220 (Dairyland Power Cooperative v. United States) is published on Counsel Stack Legal Research, covering United States Court of Federal Claims primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Dairyland Power Cooperative v. United States, 123 Fed. Cl. 220, 2015 U.S. Claims LEXIS 1166, 2015 WL 5247583 (uscfc 2015).

Opinion

*221 Motion in limine, Spent Nuclear Fuel, Offset Costs, Incurred Costs, Res Judicata

OPINION AND ORDER

EDWARD J. DAMICH, Senior Judge

Before the Court is a Motion in limine filed by Plaintiff Dairyland Power Cooperative (“Dairyland”). Dairyland seeks an order pursuant to Rule 7 of the Rules of the Court of Federal Claims (“RCFC”) prohibiting Defendant, the United States, from arguing that Dairyland must deduct from its pending damages claim the nonbreach world cost of delivering spent fuel to the United States Department of Energy (“DOE”) in 1998 or earlier. Dairyland further seeks, pursuant to RCFC 26(c), a protective order barring Defendant from seeking discovery into the costs Dairyland would have incurred in the nonbreach world to deliver spent fuel.

For the reasons set forth below, the Court hereby DENIES the Motion in limine.

I. Background

This case is one of a number of cases before the court of Federal Claims involving the ongoing breach of the Standard Contract between the DOE and nuclear utilities for the removal and disposal of spent nuclear fuel (“SNF”). The general facts of the ease have been discussed at length in this Court’s first round ease for damages, see Dairyland Power Coop. v. United States, 90 Fed.Cl. 615 (Fed.Cl.2009); thus the Court shall limit discussion only to the facts relevant to the present controversy.

Currently at issue is Dairyland’s claim for second round damages, for the time period of 2007 to 2012. Dairyland seeks damages for, inter alia, the construction of dry cask storage at the .La Crosse Boiling Water Reactor (“LACBWR”). After determining that such a project would be financially feasible, and in an effort to mitigate damages, Dairyland removed the reactor pressure vessel (“RPV”) from LACBWR and installed a specially fabricated cask loading pool, along with a temporary cask handling Crane. Mot. at 5. 1 This setup included a water system and water gate that would allow Dairyland to manipulate water levels to enable the movement of casks in and out of the loading pool and fuel assemblies. Id.

On November 22, 2013, Defendant served several requests for admissions and interrogatory requests on Dairyland, which now provide the basis for Dairyland’s Motion. Dairyland specifically objects to Interrogatory requests 1-7 and 11, and requests for admission 1-7, which “seek to isolate the amount spent on a specified sub-part of Dairyland’s dry cask storage project.” Mot. at 6. 2 Dairyland indicated that it was unable *222 to respond to these specific requests because Dairyland’s accounting method was set up in such a way that all costs related to the dry cask storage project were accounted for using a single accounting code; thus, it would be unduly burdensome for Dairyland to retroactively reclassify every sub-category for the entire project. 3 To date, Dairyland has not substantively responded to these specific requests for admission and interrogatories.

The fundamental premise for the disagreement between the parties is that the government believes that at least some of the costs identified in its discovery requests would have also been incurred by Dairyland in the nonbreach world — a premise Dairyland disagrees with. In its Motion, Dairyland details what it believes would have been the process for SNF removal in the nonbreach world, and contrasts it with the steps it has undertaken in the breach world. Dairyland argues that the process of loading fuel in the non-breach world for DOE collection would have been drastically different than the process that actually occurred when Dairyland loaded SNF into its newly constructed dry cask storage, and Dairyland is prepared to present expert testimony at the trial for damages to that effect. The government, on the other hand, is prepared to offer expert testimony to the contrary — that several of the costs that Dairyland now seeks to recover are costs that would have been incurred in the nonbreach world.

The government has indicated to Dairy-land that it believes Dairyland to be obligated to break down these costs as part of its legal burden of identifying and deducting costs that would have been incurred in the nonbreaeh world. Mot. at 6. The parties disagree about the existence and extent of any obligation Dairyland has to delineate and deduct from damages the amount of costs it would have incurred in the nonbreach world to deliver SNF to the government.

Dairyland now seeks a judicial order which, pursuant to RCFC 7 4 , would prohibit the government from arguing that Dairyland would have incurred some of the loading costs in the nonbreach world that it now seeks compensation for. Dairyland also asks for a protective order to bar the government from requiring Dairyland to answer the outstanding discovery (namely, Defendant’s First Sét of Interrogatories number 1-7 and 11 and Defendant’s First set of Request for Admissions numbers 1-7). Finally, Dairy-land asks the Court for a protective order, pursuant to RCFC 26(c) 5 , that would bar the government from seeking further discovery into the costs Dairyland would have incurred in the nonbreach world to deliver SNF to DOE.

II. Standard of Review

A motion in limine is “a recognized method under [RCFC] 16 and Fed.R.Civ.P. 16 for obtaining a pretrial order simplifying issues for trial.” White Mountain Apache Tribe of Az. v. United States, 10 Cl.Ct. 115, 116 (1986). The basic purpose of a motion in limine is ‘“to prevent a party before trial from encumbering the record with irrelevant, immaterial or cumulative matters. Such a motion enables a court to rule in advance on the admissibility of documentary or testimonial evidence and thus expedite and render efficient a subsequent trial.’” INSLAW, Inc. v. United States, 35 Fed.Cl. 295, 302-03 (1996) (quoting Baskett v. United States, 2 *223 Cl.Ct. 356, 367-68 (1983), aff'd, 790 F.2d 93 (Fed.Cir.1986) (table)).

III. Discussion

Dairyland objects to the government’s discovery requests for three reasons: (1) Dairy-land argues that its nonbreach world fuel transfer costs have already been deducted •from damages in the Round 1 case; (2) Dairyland argues that it is too late for the government to seek a deduction for 1998 costs; and (3) that consideration of a reduction of damages based on nonbreach world costs from 1998 or earlier is barred by res judicata. See generally Mot. For the reasons set forth below, the Court finds Dairy-land’s arguments unavailing.

A. Dairyland’s Nonbreach World Fuel Transfer Costs Have Not Been Deducted From Damages

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Cite This Page — Counsel Stack

Bluebook (online)
123 Fed. Cl. 220, 2015 U.S. Claims LEXIS 1166, 2015 WL 5247583, Counsel Stack Legal Research, https://law.counselstack.com/opinion/dairyland-power-cooperative-v-united-states-uscfc-2015.