Snow v. Power Construction Co.

2017 IL App (1st) 151226
CourtAppellate Court of Illinois
DecidedJuly 19, 2017
Docket1-15-1226
StatusPublished
Cited by9 cases

This text of 2017 IL App (1st) 151226 (Snow v. Power Construction Co.) is published on Counsel Stack Legal Research, covering Appellate Court of Illinois primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Snow v. Power Construction Co., 2017 IL App (1st) 151226 (Ill. Ct. App. 2017).

Opinion

Digitally signed by Reporter of Decisions Illinois Official Reports Reason: I attest to the accuracy and integrity of this document Appellate Court Date: 2017.07.19 12:18:15 -05'00'

Snow v. Power Construction Co., 2017 IL App (1st) 151226

Appellate Court JOHN T. SNOW, Plaintiff-Appellant, v. POWER CONSTRUCTION Caption COMPANY, LLC, an Illinois Limited Liability Company, THORNE ASSOCIATES, INC., an Illinois Corporation, and POWER CONTRACTING AND ENGINEERING CORPORATION, an Illinois Corporation, Defendants-Appellees.

District & No. First District, Fourth Division Docket No. 1-15-1226

Rule 23 order filed December 22, 2016 Motion to publish allowed April 12, 2017 Opinion filed May 4, 2017

Decision Under Appeal from the Circuit Court of Cook County, No. 12-L-3597; the Review Hon. Eileen Brewer, Judge, presiding.

Judgment Affirmed.

Counsel on Daniel E. Compton, of Compton Law Group, of Elgin, for appellant. Appeal Patricia J. Hogan, Yaro M. Melnyk, and James F. Maruna, of Cassiday Schade LLP, of Chicago, for appellees Power Construction Company, LLC, and Power Contracting and Engineering Corp.

Robert J. Franco, Christopher G. Beunik, and Christopher M. Cano, Franco & Moroney, LLC, of Chicago, for appellee Thorne Associates, Inc. Panel JUSTICE McBRIDE delivered the judgment of the court, with opinion. Presiding Justice Ellis and Justice Burke concurred in the judgment and opinion.

OPINION

¶1 Plaintiff John T. Snow filed a negligence action against defendants Power Construction Company, LLC (PCC), Power Engineering and Contracting Corporation (PCEC) (collectively Power), and Thorne Associates, Inc. (Thorne), after he was injured when several sheets of drywall fell on him while at a construction site. Plaintiff was employed by third-party defendant, Professionals Associated Construction Layout & Survey Co., Ltd. (Professionals), as a surveyor and was on the site in his professional capacity. The trial court granted summary judgment in favor of PCC, PCEC, and Thorne. ¶2 Plaintiff appeals, arguing that the trial court erred in (1) granting summary judgment because there was a material question of fact regarding the stacking of the drywall and the responsibility for safety of persons on the jobsite, (2) ruling that reliance on an alleged custom and practice could make an injury unforeseeable as a matter of law, (3) striking portions of the affidavits of plaintiff and Richard Hislop tendered in response to the motions for summary judgment, and (4) quashing the notice of deposition for Jeff Karp, president of PCC. ¶3 In May 2010, Alexian Brothers Health System (Alexian), as the owner, entered into a contract with PCEC, as the construction manager, for the construction of the new children’s hospital and bed tower (bed tower site) at St. Alexius Medical Center (St. Alexius) in Hoffman Estates, Illinois. In May 2011, PCEC entered into a project specific agreement with Professionals to perform surveying work at the bed tower site. A master subcontract agreement between PCC and Professionals, from October 2004, governed the project specific agreement and was incorporated by reference. Also in May 2011, PCEC entered into a project specific agreement with Thorne to perform framing and drywall assembly at the bed tower site. A master subcontract agreement between PCC and Thorne, dated November 2003, governed and was incorporated by reference. ¶4 As part of Thorne’s subcontract, it was to construct a temporary corridor connecting the emergency room of the hospital to the new construction. On June 29, 2011, Thorne completed its installation of drywall in the temporary corridor. At the end of the work day, Thorne’s employees vertically stacked approximately 14 sheets, 4 by 8 feet high, of leftover drywall near the entrance to the corridor. The next morning, on June 30, 2011, plaintiff came to the bed tower site to check his previously placed benchmarks in the corridor. Plaintiff believed one of his benchmarks was behind the stacked drywall. He then moved the stack toward himself to check for his benchmark, but the stack continued to move and fell forward. Plaintiff was struck on his right leg and trapped under the drywall. He immediately sought care at St. Alexius. ¶5 Plaintiff initially filed his negligence action in April 2012. In December 2012, plaintiff filed his second amended complaint with one count directed at each of the defendants. The allegations against PCC and PCEC are identical. The complaint asserts that both PCC and PCEC were the general contractor for a project at the east pavilion of St. Alexius. Both PCC

-2- and PCEC retained some control over the safety of the work on the project. PCC and PCEC each had a duty to exercise that control with ordinary care. PCC and PCEC were individually guilty of one or more negligent and careless acts or omissions: (1) caused drywall to be stacked or stored in such a manner as to easily topple over; (2) allowed drywall to be stacked or stored in such a way and in such a manner as to be easily tipped or toppled over; (3) failed to brace drywall stacked in a vertical manner when it knew or should have known that drywall so stored or stacked could easily tip over, causing injury; (4) failed to move, alter, or correct drywall stacked or stored in an unsafe manner or direct that drywall so stacked or stored be moved, braced, or corrected; (5) scheduled work of the subcontractor Professionals such that its employees would have to move or disturb stacked or stored drywall, and (6) failed to assure that the drywall was stacked, racked, blocked, interlocked, or otherwise secured to prevent sliding, falling, or collapse. As a result of one or more of these acts or omissions, the vertically stacked drywall fell and struck plaintiff, trapping him underneath and causing injury to his back and legs. As a direct and proximate result of said accident, plaintiff has experienced and will continue to experience pain, suffering, disability, loss of normal life, and lost income. ¶6 The third count of the complaint pled the following allegations against Thorne. Thorne was a drywall subcontractor at the St. Alexius site, and it stacked, moved, and stored drywall, specifically the drywall involved in the accident which injured plaintiff. Thorne had a duty to use due care in its stacking, storage, and moving of drywall so as not to cause an unsafe condition, which might injure plaintiff and other employees on the project. Thorne was guilty of one or more negligent and careless acts or omissions: (1) stored or stacked drywall in an area that was neither safe nor authorized; (2) caused drywall to be stacked or stored in a manner such that plaintiff could move or dislodge it; (3) failed to brace, band, or secure the drywall in such a manner that it would not tip or fall; (4) improperly stacked the drywall; and (5) was otherwise careless and negligent. As a result of one or more of these acts or omissions, the vertically stacked drywall fell and struck plaintiff, trapping him underneath and causing injury to his back and legs. As a direct and proximate result of said accident, plaintiff has experienced and will continue to experience pain, suffering, disability, loss of normal life, and lost income. ¶7 The parties engaged in lengthy discovery, which included all relevant contracts as well as several depositions of employees of PCC, PCEC, Thorne, and Professionals. The contract between Alexian and PCEC included the following provisions in the general conditions of the contract for construction. ¶8 Article 1.1.3 detailed the work under the contract. “The term ‘Work’ means the construction and services required by the Contract Documents, whether completed or partially completed, and included all other labor, materials, equipment and services provided or to be provided by the Contractor to fulfill the Contractor’s obligations.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Wiberg v. Metro Storage, LLC
2024 IL App (1st) 240271 (Appellate Court of Illinois, 2024)
Brettman v. Virgil Cook & Son, Inc.
2020 IL App (2d) 190955 (Appellate Court of Illinois, 2020)
Foley v. Builtech Construction, Inc.
2019 IL App (1st) 180941 (Appellate Court of Illinois, 2019)
Bailey v. Graham Enterprises, Inc.
2019 IL App (1st) 181316 (Appellate Court of Illinois, 2019)
Snow v. Power Construction Co., LLC
2017 IL App (1st) 151226 (Appellate Court of Illinois, 2017)

Cite This Page — Counsel Stack

Bluebook (online)
2017 IL App (1st) 151226, Counsel Stack Legal Research, https://law.counselstack.com/opinion/snow-v-power-construction-co-illappct-2017.