[398]*398Mr. Justice Brennan

delivered the opinion of the Court.

This case is the first contested licensing proceeding to be decided by the Atomic Energy Commission under the Atomic Energy Act of 1954, 68 Stat. 919, 42 U. S. C. § 2011 et seq. It presents the question whether the Commission erred in continuing in effect a provisional construction permit which authorizes the petitioner Power Reactor Development Company to construct, but not to operate, a fast-neutron breeder reactor for the generation of electric power. The Court of Appeals for the District of Columbia Circuit set that order aside. 108 U. S. App. D. C. 97, 280 F. 2d 645 (1960). We granted certiorari, 364 U. S. 889 (1960), on petitions of the United States and of Power Reactor Development Company (hereafter PRDC), to decide an important question of the scope of the Commission’s power under the Atomic Energy Act of 1954.

Stated more precisely, the question before us is whether the Commission, in issuing a permit for the construction of a facility which will utilize nuclear materials, such as the power reactor presently involved, must make the same definitive finding of safety of operation as it admittedly will have to make before it licenses actual operation of the facility. The Court of Appeals said: “It is undisputed that the Commission must make such a finding when it authorizes operation. The question is whether it must make such a finding when it authorizes construction. In our opinion it must.” 108 U. S. App. D. C., at 100, 280 F. 2d, at 648. Petitioners agree that some finding directed to safety of operation must be made at the construction-permit stage of the proceeding, but argue that the Court of Appeals erred in holding that the Commission must have the same degree of certitude at this preliminary point as when it licenses operation. In order to understand how the controversy arises and what is involved in [399]*399its resolution, it will be necessary to state the proceedings in the case at some length, and then describe in detail the governing statute and administrative regulations. For the decision of this case ultimately turns on a comparison of what the Commission found with what the statute and regulations require.

The case began on January 7, 1956, when PRDC filed with the Commission (hereafter sometimes referred to as the AEC) an application to construct and operate a developmental power reactor of a relatively new type. This device has two characteristics which distinguish it from other nuclear reactors. First, the neutrons which fly about inside the reactor (to use crude but graphic layman’s terminology) and split atoms of fissionable Uranium-235 — thus releasing new neutrons and energy in the form of heat — are “fast” neutrons. That is, they travel at a velocity of about 10,000 miles per second, much faster than neutrons in ordinary reactors. Second, this réactor is a “breeder”: it has the property of being able to produce about 1.2 times as much fissionable material as it consumes. This result comes about through a sort of modern alchemy; when the neutrons fly outside the inner core of the reactor, which is composed of fissionable U-235, they enter a blanket of nonfissionable U-238. Atoms in this blanket are changed, when struck by a neutron, into Plutonium, itself a fissionable fuel which can be removed from the reactor and be put to possible use in other installations. Thus, the reactor “breeds” Plutonium faster than it uses up U-235. It not only generates energy to produce electric power, it also creates new reactor fuel. This “breeder” effect is attainable because of the use of fast neutrons. Two boron control rods inserted into the reactor are a means designed to reduce its power level at any time. And in addition to these rods, eight more boron rods are suspended by an electromagnet over the reactor; in case the reactivity rises to a danger[400]*400ously high level, these safety rods are intended to drop into the reactor automatically and shut it down immediately. The whole machine is housed in a series of thick concrete, graphite, and steel layers, all underground. Over this entire complex is placed a football-shaped building, enclosed in a two-inch steel shield capable of containing an explosion equal in force to 1,000 pounds of TNT, which is greater than any explosion which any of the experts who testified in this case believes is at all likely to result from an accident in the operation of the reactor. The application, after describing the reactor in much greater detail than this rudimentary summary, went on to provide that the reactor would be located at Lagoona Beach, Mich., on the shores of Lake Erie, about 35 miles from the center of Detroit, Mich., and about 30 miles from the center of Toledo, Ohio.

The Commission took the case under advisement and, on August 4, 1956, despite a report of its Advisory Committee on Reactor Safeguards which was at best noncommittal about the probable safety of the proposed reactor in operation, issued a provisional construction permit without having held public hearings, as the law at that time permitted it to do. This permit was subject to the following condition:

“The conversion of this permit to a license is subject to submittal by PRDC to the Commission (by amendment of the application) of the complete, final Hazards Summary Report (portions of which may be submitted and evaluated from time to time). The final Hazards Summary Report must show that the final design provides Reasonable assurance . . . that the health and safety''of the public will not be endangered by operation of the reactor

On August 31, 1956, in accordance with the Commission’s then existing rules of practice, the respondents in [401]*401this Court, International Union of Electrical, Radio, and Machine Workers, United Automobile, Aircraft, and Agricultural Implement Workers of America, and United Papermakers and Paperworkers, petitioned the Commission for permission to intervene and oppose continuation in effect of PRDC’s provisional construction permit. The AEC granted permission to intervene on October 8, 1956, and set the case down for a hearing before one of its hearing examiners. Extensive hearings were held between January 8, 1957, and August 7, 1957, and on November 22, 1957, in accordance with the AEC’s order setting the case for hearing before him, the examiner, instead of issuing an initial decision and opinion of his own, transferred and certified the record of the hearings to the full Commission for its consideration. Oral argument was had before the Commission on May 29, 1958. On December 10, 1958, the Commission rendered its “Opinion and Initial Decision” continuing PRDC’s permit in effect, subject to the same condition recited above. To its opinion were appended extensive findings of fact, including Finding 22, which is of central importance to the decision of this case. That finding reads as follows:

“22. The Commission finds reasonable assurance in the record that a utilization facility of the general type proposed in the PRDC application and amendments thereto can be constructed and will be able to be operated at the location proposed without undue risk to the health and safety of the public.”

Commissioners Vance and Floberg joined in the opinion. Commissioner Graham filed a short concurring opinion agreeing with the Commission’s basic safety findings, just quoted, but doing so in much shorter compass than the majority.

Free access — add to your briefcase to read the full text and ask questions with AI

Power Reactor Development Co. v. International Union of Electrical, Radio & MacHine Workers, 367 U.S. 396, 81 S. Ct. 1529, 6 L. Ed. 2d 924, 1961 U.S. LEXIS 1933 (1961).

367 U.S. 396 (Power Reactor Development Co. v. International Union of Electrical, Radio & MacHine Workers) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Melissa Wilson v. Darin Gordon
822 F.3d 934 (Sixth Circuit, 2016)
Venetian Casino Resort v. Equal Employment Opportunity Commission
453 F. Supp. 2d 157 (District of Columbia, 2006)
California Radioactive Materials Management Forum v. Department of Health Services
15 Cal. App. 4th 841 (California Court of Appeal, 1993)
Baird v. Sonnek
944 F.2d 890 (Federal Circuit, 1991)
Untitled California Attorney General Opinion
California Attorney General Reports, 1990
WEST VIRGINIA ASS'N OF COM. HEALTH v. Sullivan
737 F. Supp. 929 (S.D. West Virginia, 1990)
Planned Parenthood Federation of America v. Bowen
680 F. Supp. 1465 (D. Colorado, 1988)
Alaska Fish & Wildlife Federation v. Dunkle
829 F.2d 933 (Ninth Circuit, 1987)
City of Houston v. Harris County Outdoor Advertising Ass'n
732 S.W.2d 42 (Court of Appeals of Texas, 1987)
Monongahela Power Co. v. Marsh
809 F.2d 41 (D.C. Circuit, 1987)
Pathfinder Mines Corp. v. Clark
620 F. Supp. 336 (D. Arizona, 1985)
United States Steel Corp. v. United States
618 F. Supp. 496 (Court of International Trade, 1985)
Berger v. Heckler
771 F.2d 1556 (Second Circuit, 1985)
Chula Vista City School District v. Bell
762 F.2d 762 (Ninth Circuit, 1985)
Montres Rolex v. Snyder
718 F.2d 524 (Second Circuit, 1983)
Ram v. Blum
564 F. Supp. 634 (S.D. New York, 1983)