Mundt v. Ragnar Benson, Inc.

310 N.E.2d 633, 18 Ill. App. 3d 758, 1974 Ill. App. LEXIS 2891
CourtAppellate Court of Illinois
DecidedMarch 5, 1974
Docket56324
StatusPublished
Cited by29 cases

This text of 310 N.E.2d 633 (Mundt v. Ragnar Benson, Inc.) is published on Counsel Stack Legal Research, covering Appellate Court of Illinois primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Mundt v. Ragnar Benson, Inc., 310 N.E.2d 633, 18 Ill. App. 3d 758, 1974 Ill. App. LEXIS 2891 (Ill. Ct. App. 1974).

Opinion

Mr. JUSTICE DOWNING

delivered the opinion of the court:

Rex Mundt, plaintiff-appellant (hereinafter plaintiff), was injured on December 20, 1965, when he fell during the construction of a four-story building owned by defendant-appellee Western Electric Company, Inc. (hereinafter Western Electric). At the time of his fall, plaintiff was in the employ of the Corbetta Construction Company, which company was a subcontractor for the concrete work on the project. Defendant-appellee Ragnar Benson, Inc. (hereinafter Ragnar Benson) acted as “management contractor” for the construction of the building.

In 1966, plaintiff brought suit, based on a common law negligence theory, against: Western Electric, as owner of the building; Ragnar Benson, as “management contractor” for the construction; the architectural firm of Holabird and Root, which was party to a contract with Western Electric under which it had responsibility for all design drawings and documents related to the cons traction; and Bell Telephone Laboratories, as an additional “owner, operator, or possessor” of the building.

The record presented here is unclear as to the disposition of the case with respect to Holabird and Root, the architects. It was explained by counsel during argument before this court, however, that the firm was directed out of the case at some point during the course of the proceedings in the court below.

Prior to trial in the court below, summary judgment was entered with respect to Bell Telephone Laboratories, the court finding that no triable issue of fact existed relative to Bell; Bell is not a party to this appeal.

On two occasions in the trial court (after the jury had been sworn, but before the trial commenced; and after the close of plaintiff’s case), plaintiff requested leave of court to file an amended complaint. Pleading the same allegations of fact as had been made in the original complaint, it would have added a second count alleging a cause of action based upon the Illinois Structural Work Act (Ill. Rev. Stat. 1971, ch. 48, par. 60 et seq.). The trial court refused to permit plaintiff leave to file the proposed amendment.

At the close of plaintiff’s case, the trial court directed verdicts in favor of Western Electric and Ragnar Benson with respect to the common law negligence count. Plaintiff appeals from the entry of the order denying him leave to file the amended complaint, as well as from the order directing verdicts in favor of defendants.

The seminal issues presented to this court on review are: (1) whether the court below properly refused to permit plaintiff leave to file an amended complaint, count two of which was based upon the Illinois Structural Work Act; and (2) whether the court below erred in directing verdicts for Western Electric and Ragnar Benson in the action for common law negligence.

It would be helpful at the outset to summarize the common law negligence complaint filed in 1966 by plaintiff against defendants Western Electric and Ragnar Benson. The complaint alleged, inter alia, that on December 20, 1965, plaintiff was engaged in construction work, in the employ of Corbetta Construction Company, at the premises of Western Electric located at Wheaton and Warrenville Roads in Du Page County, Illinois; that Ragnar Benson was the general contractor in charge and control of the construction being performed on said premises; that Holabird and Root were the architects in charge and control of said construction; that Western Electric was the owner of the premises; that all the named defendants were in charge and control of said construction; that plaintiff was in the exercise of due care and caution for his own safety; that the defendants, on the day in question, had the duty to maintain, operate, and control the construction work in a safe, suitable, and proper manner so that plaintiff, while at work, would not be injured; that, notwithstanding the aforesaid duties, defendants were guilty of one or more of the following acts or omissions constituting negligence: (a) allowed work areas to be poorly lighted for night work; (b) failed to use due care in inspecting the condition of their premises; (c) failed to provide warnings or barricades around openings for workers on the premises; (d) failed to provide adequate lighting for night work; (e) failed to warn plaintiff of an existing unsafe condition; (f) failed to retain sufficient and proper control over the construction work; (g) failed to illuminate the work areas and openings in the floor at the construction site at night; and, finally, that as a direct result of defendants’ negligence, plaintiff was caused severe injury when he fell through an opening from the fourth floor to the third floor at the building site. Plaintiff prayed for judgment in the amount of $150,000 against each of the named defendants, including Western Electric and Ragnar Benson.

Plaintiff’s employer Corbetta Construction Company, as a subcontractor for Ragnar Benson, was under contract to build the concrete floors under construction at the time of plaintiff’s accident. Using 4' x 8' pieces of plywood, Corbetta employees would build temporary wooded floors, “decking,” and then proceed to cover those floors with concrete. When the concrete had hardened, they would remove the temporary flooring from below. Whenever it was necessary to leave a hole in the concrete floor for the future installation of an elevator or an air duct, Corbetta employees were supposed to nail four boards into a square and then nail the square to the temporary wooden floor before the concrete was poured. Consequently, the concrete would harden around the square and leave a hole in the final concrete floor. When the temporary flooring was removed, leaving a hole in the floor, it was customary procedure for a Corbette workman to cover or barricade the hole. Larger holes, those for elevator shafts and the like, were barricaded; smaller holes, those for air ducts, were generally supposed to be covered by hatch covers or by sheets of plywood, which were to be nailed from their upper surfaces to the wooden baffle square which was still in place, or themselves “cleated” by pieces of wood nailed to their undersurfaces so that when they were placed over the openings in the concrete floor, the “cleats” would prevent them from slipping or sliding off the opening.

SUMMARIES OF THE TESTIMONY AT TRIAL:

Plaintiff testified, in pertinent part, that on December 20, 1965, he was employed on the night crew by Corbetta Construction Company, for whom he had worked since August, 1965. He had started out with Corbetta as a general laborer and would occasionally help with the wrecking crew. He had worked as a laborer for 20 years. At the time of the accident, his duties were to take care of recently poured concrete on Western Electric’s building, mating sure that it was completely covered and that heaters and thermometers were properly positioned in the bottom of the concrete forms and on top of the concrete slabs after they had been covered. The covering procedure was this: the concrete floors were covered with graphite paper; blankets were then placed on top of the paper; and, finally, any available material nearby was laid on top of the blankets to make certain the blankets did not blow away. The concrete could be covered approximately IV2 to 2 hours after it had been poured.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

La Salle National Bank v. 53rd-Ellis Currency Exchange, Inc.
618 N.E.2d 1103 (Appellate Court of Illinois, 1993)
Heino v. Mellon Stuart Co.
583 N.E.2d 697 (Appellate Court of Illinois, 1991)
Stringer Construction Co. v. Chicago Housing Authority
563 N.E.2d 819 (Appellate Court of Illinois, 1990)
Keyser v. Metropolitan Sanitary District
520 N.E.2d 678 (Appellate Court of Illinois, 1987)
Dickmann v. MIDWEST INT. ELEC. CONST. CO.
493 N.E.2d 33 (Appellate Court of Illinois, 1986)
Dickmann v. Midwest Interstate Electrical Construction Co.
493 N.E.2d 33 (Appellate Court of Illinois, 1986)
DiBenedetto v. County of Du Page
491 N.E.2d 13 (Appellate Court of Illinois, 1986)
Pietka v. Chelco Corp.
437 N.E.2d 872 (Appellate Court of Illinois, 1982)
Bernesak v. Catholic Bishop of Chicago
409 N.E.2d 287 (Appellate Court of Illinois, 1980)
Smith v. Georgia Pacific Corp.
408 N.E.2d 117 (Appellate Court of Illinois, 1980)
Lake County Forest Preserve District v. Frecska
407 N.E.2d 137 (Appellate Court of Illinois, 1980)
Ewert v. Wieboldt Stores, Inc.
405 N.E.2d 1283 (Appellate Court of Illinois, 1980)
Zizzo v. Ben Pekin Corp.
398 N.E.2d 382 (Appellate Court of Illinois, 1979)
Alfano v. BD. OF TRADE OF CITY OF CHICAGO
395 N.E.2d 384 (Appellate Court of Illinois, 1979)
FIRST NAT'L BK. & T. CO. v. Sousanes
384 N.E.2d 30 (Appellate Court of Illinois, 1978)
First National Bank & Trust Co. v. Sousanes
384 N.E.2d 30 (Appellate Court of Illinois, 1978)
Moore v. Clearing Industrial District, Inc.
380 N.E.2d 1063 (Appellate Court of Illinois, 1978)
Borus v. Yellow Cab Co.
367 N.E.2d 277 (Appellate Court of Illinois, 1977)
Mayfair Construction Co. v. Security Insurance
366 N.E.2d 1020 (Appellate Court of Illinois, 1977)
Blazina v. Blazina
356 N.E.2d 164 (Appellate Court of Illinois, 1976)

Cite This Page — Counsel Stack

Bluebook (online)
310 N.E.2d 633, 18 Ill. App. 3d 758, 1974 Ill. App. LEXIS 2891, Counsel Stack Legal Research, https://law.counselstack.com/opinion/mundt-v-ragnar-benson-inc-illappct-1974.