LEVINSON, Justice.
The complainant-appellant Mark L. Peterson appeals the Public Utilities Commission’s (PUC) Decision and Order (D & 0) No. 13198, filed on April 4, 1994, dismissing his complaint against the Hawai'i Electric Light Company (HELCO) based upon the PUC’s determination that HELCO’s PohoiM Transmission Line No. 2 (PTL No. 2) was in substantial compliance with PUC’s D & 0 No. 10620. On appeal, we are asked to review the PUC’s finding that the PTL No. 2 was in substantial compliance with D & 0 No. 10620. We need not address this issue because we hold that this court lacks appellate jurisdiction to hear a direct appeal from a PUC order dismissing a complaint that merely alleges error in the placement of transmission lines. Accordingly, we dismiss this appeal for lack of appellate jurisdiction.
I. BACKGROUND
This appeal’ arises from HELCO’s construction of two overhead, sixty-nine Mlovolt (kv) transmission lines that interconnect Puna Geothermal Venture’s (PGV) geothermal facility at PohoiM, on the Island of Ha-wai'i, with HELCO’s electric system located near its Puna substation. These lines transmit power generated by PGWs geothermal facility so that the power can be distributed to HELCO’s customers.
In preparation for the construction of the transmission lines, a routing study and an environmental impact statement (EIS) were prepared. The routing study was prepared on HELCO’s behalf by DHM, Inc. (DHM), an engineering consulting firm; in the routing study, DHM located optimum “transmission corridors” based on “opportunities and constraints” pertaining to placement of the lines, such as land use, special conservation restrictions, geographic features, and existing transportation and utility infrastructures. The routing study then located two proposed route alignments within the transmission corridors through further study of environmental, geographic, and economic factors; the placement of one of these route alignments is at the heart of the present dispute.
Portions of the proposed alignments passed through state conservation district and state-owned agricultural land. Because the project proposed the possible use of state lands in those areas, an environmental assessment by the Department of Land and Natural Resources (DLNR) was required pursuant to Hawai'i Revised Statutes (HRS) ch. 343. As part of its assessment, the DLNR determined that an EIS was required. Accordingly, DHM prepared and submitted an EIS on HELCO’s behalf. Thereafter, the DLNR approved the routing of the lines, portions of which passed through the Nánáwale Forest Reserve.
On September 6, 1989, both the routing study and the EIS were submitted in support of HELCO’s application to the PUC for approval of the placement of the transmission lines. Approval by the PUC is required pursuant to (1) HRS § 269-27.5 (1993), which requires PUC approval for the construction of new overhead transmission lines in excess of forty-six kv through residential areas, and (2) PUC General Order No. 7, which requires PUC approval for any expenditure by a utility exceeding $500,000. After the requisite public hearing, the PUC issued D & O No. 10620 on May 8, 1990, approving HELCO’s request to construct the transmission lines. In particular, D & O No. 10620 ruled that
[t]he Commission finds that the construction of the proposed transmissions lines is necessary, if HELCO is to be assured of [325]*325firm capacity from PGV. The capacity to be furnished by PGV is required to improve HELCO’s service reliability in the Puna area. The Commission further finds that the construction of the overhead fines is reasonable, will be safe and prudent, and is in the public interest.
Furthermore, D & 0 No. 10620 contained a general description of the placement of the proposed transmission lines. Specifically, PTL No. 2 was characterized in D & 0 No. 10620 as being
18.2 miles long. It will originate on the northern edge of the geothermal site, cross Kapoho Road, and head northwest across open vacant land to the edge of Nanawale Farm ranch lands. It will then continue along the outside edge of the ranch lands and Nanawale Estates subdivision to the northeast corner of Nanawale Estates subdivision.
Peterson purchased certain real property in September 1990, several months after the PUC authorized the placement of HELCO’s transmission fines. As constructed, PTL No. 2 skirted Peterson’s property, at its closest point, by approximately 150 feet. The sellers of Peterson’s property had not informed him of then-ongoing negotiations, in which HEL-CO was involved, to acquire an easement over the property, or of any imminent threat of condemnation. Apparently, it was only in November 1992 that it became evident to Peterson that HELCO had entered into an agreement with a neighboring landowner to locate the transmission fine on the parcel adjacent to Peterson’s property. Thus, as constructed, PTL No. 2 did not follow the precise route described in D & O No. 10620. However, except for those portions near Peterson’s property and the Puna substation, PTL No. 2 followed the general route described in D & O No. 10620.
On December 8, 1992, Peterson filed a formal complaint with the PUC alleging that HELCO had violated D & O No. 10620 when it failed to construct PTL No. 2 in exact conformity therewith. On April 6, 1994, after an extensive hearing, the PUC issued D & O No. 13198, dismissing his complaint. In its order, the PUC concluded that the description of PTL No. 2 contained in D & O No. 10620 was not meant to dictate final placement of the fine, but, rather, was a “proposed” alignment. Furthermore, the PUC determined that the deviations from D & O No. 10620 were not substantial and were only a result of negotiations with the landowner over whose property the fine was intended to pass. Thus, because the final alignment of PTL No. 2 was understood to be subject to negotiations for rights-of-way with affected landowners, the PUC concluded that HELCO was not required to obtain additional PUC approval for the final alignment of PTL No. 2. Therefore, inasmuch as the final alignment of PTL No. 2 substantially followed the general route described in D & O No. 10620, Peterson’s complaint was dismissed.
Peterson filed his notice of appeal from D & O No. 13198 on May 4,1994.
II. DISCUSSION
A. Principles Of Appellate Jurisdiction
Peterson primarily relies upon HRS § 269-16 as the jurisdictional basis for his appeal of D & O No. 13198. HRS § 269-16 (1993) provides in relevant part:
Regulation of utility rates; ratemak-ing procedures, (a) All rates, fares, charges, classifications, schedules, rules, and practices made, charged, or observed by any public utility ..., shall be just and reasonable and shall be filed with the public utilities commission....
To the extent that the contested case proceedings referred to in chapter 91[1] are required in any rate proceeding ...
Free access — add to your briefcase to read the full text and ask questions with AI
LEVINSON, Justice.
The complainant-appellant Mark L. Peterson appeals the Public Utilities Commission’s (PUC) Decision and Order (D & 0) No. 13198, filed on April 4, 1994, dismissing his complaint against the Hawai'i Electric Light Company (HELCO) based upon the PUC’s determination that HELCO’s PohoiM Transmission Line No. 2 (PTL No. 2) was in substantial compliance with PUC’s D & 0 No. 10620. On appeal, we are asked to review the PUC’s finding that the PTL No. 2 was in substantial compliance with D & 0 No. 10620. We need not address this issue because we hold that this court lacks appellate jurisdiction to hear a direct appeal from a PUC order dismissing a complaint that merely alleges error in the placement of transmission lines. Accordingly, we dismiss this appeal for lack of appellate jurisdiction.
I. BACKGROUND
This appeal’ arises from HELCO’s construction of two overhead, sixty-nine Mlovolt (kv) transmission lines that interconnect Puna Geothermal Venture’s (PGV) geothermal facility at PohoiM, on the Island of Ha-wai'i, with HELCO’s electric system located near its Puna substation. These lines transmit power generated by PGWs geothermal facility so that the power can be distributed to HELCO’s customers.
In preparation for the construction of the transmission lines, a routing study and an environmental impact statement (EIS) were prepared. The routing study was prepared on HELCO’s behalf by DHM, Inc. (DHM), an engineering consulting firm; in the routing study, DHM located optimum “transmission corridors” based on “opportunities and constraints” pertaining to placement of the lines, such as land use, special conservation restrictions, geographic features, and existing transportation and utility infrastructures. The routing study then located two proposed route alignments within the transmission corridors through further study of environmental, geographic, and economic factors; the placement of one of these route alignments is at the heart of the present dispute.
Portions of the proposed alignments passed through state conservation district and state-owned agricultural land. Because the project proposed the possible use of state lands in those areas, an environmental assessment by the Department of Land and Natural Resources (DLNR) was required pursuant to Hawai'i Revised Statutes (HRS) ch. 343. As part of its assessment, the DLNR determined that an EIS was required. Accordingly, DHM prepared and submitted an EIS on HELCO’s behalf. Thereafter, the DLNR approved the routing of the lines, portions of which passed through the Nánáwale Forest Reserve.
On September 6, 1989, both the routing study and the EIS were submitted in support of HELCO’s application to the PUC for approval of the placement of the transmission lines. Approval by the PUC is required pursuant to (1) HRS § 269-27.5 (1993), which requires PUC approval for the construction of new overhead transmission lines in excess of forty-six kv through residential areas, and (2) PUC General Order No. 7, which requires PUC approval for any expenditure by a utility exceeding $500,000. After the requisite public hearing, the PUC issued D & O No. 10620 on May 8, 1990, approving HELCO’s request to construct the transmission lines. In particular, D & O No. 10620 ruled that
[t]he Commission finds that the construction of the proposed transmissions lines is necessary, if HELCO is to be assured of [325]*325firm capacity from PGV. The capacity to be furnished by PGV is required to improve HELCO’s service reliability in the Puna area. The Commission further finds that the construction of the overhead fines is reasonable, will be safe and prudent, and is in the public interest.
Furthermore, D & 0 No. 10620 contained a general description of the placement of the proposed transmission lines. Specifically, PTL No. 2 was characterized in D & 0 No. 10620 as being
18.2 miles long. It will originate on the northern edge of the geothermal site, cross Kapoho Road, and head northwest across open vacant land to the edge of Nanawale Farm ranch lands. It will then continue along the outside edge of the ranch lands and Nanawale Estates subdivision to the northeast corner of Nanawale Estates subdivision.
Peterson purchased certain real property in September 1990, several months after the PUC authorized the placement of HELCO’s transmission fines. As constructed, PTL No. 2 skirted Peterson’s property, at its closest point, by approximately 150 feet. The sellers of Peterson’s property had not informed him of then-ongoing negotiations, in which HEL-CO was involved, to acquire an easement over the property, or of any imminent threat of condemnation. Apparently, it was only in November 1992 that it became evident to Peterson that HELCO had entered into an agreement with a neighboring landowner to locate the transmission fine on the parcel adjacent to Peterson’s property. Thus, as constructed, PTL No. 2 did not follow the precise route described in D & O No. 10620. However, except for those portions near Peterson’s property and the Puna substation, PTL No. 2 followed the general route described in D & O No. 10620.
On December 8, 1992, Peterson filed a formal complaint with the PUC alleging that HELCO had violated D & O No. 10620 when it failed to construct PTL No. 2 in exact conformity therewith. On April 6, 1994, after an extensive hearing, the PUC issued D & O No. 13198, dismissing his complaint. In its order, the PUC concluded that the description of PTL No. 2 contained in D & O No. 10620 was not meant to dictate final placement of the fine, but, rather, was a “proposed” alignment. Furthermore, the PUC determined that the deviations from D & O No. 10620 were not substantial and were only a result of negotiations with the landowner over whose property the fine was intended to pass. Thus, because the final alignment of PTL No. 2 was understood to be subject to negotiations for rights-of-way with affected landowners, the PUC concluded that HELCO was not required to obtain additional PUC approval for the final alignment of PTL No. 2. Therefore, inasmuch as the final alignment of PTL No. 2 substantially followed the general route described in D & O No. 10620, Peterson’s complaint was dismissed.
Peterson filed his notice of appeal from D & O No. 13198 on May 4,1994.
II. DISCUSSION
A. Principles Of Appellate Jurisdiction
Peterson primarily relies upon HRS § 269-16 as the jurisdictional basis for his appeal of D & O No. 13198. HRS § 269-16 (1993) provides in relevant part:
Regulation of utility rates; ratemak-ing procedures, (a) All rates, fares, charges, classifications, schedules, rules, and practices made, charged, or observed by any public utility ..., shall be just and reasonable and shall be filed with the public utilities commission....
To the extent that the contested case proceedings referred to in chapter 91[1] are required in any rate proceeding ... such evidentiary hearings shall be conducted expeditiously and shall be conducted as a part of the ratemaking proceeding.
(b) No rate, fare, charge, classification, schedule, rule, or practice ... shall be established, abandoned, modified, or departed from by any public utility, except [after notice] and prior approval by the commission for any increases in rates, [326]*326fares or charges.... A contested case hearing shall be held in connection with any increase in rates....
(c) The commission may in its discretion and after public hearing ... authorize temporary increases in rates, fares, and charges....
(d) The commission shall make every effort to complete its deliberations and issue its decision as expeditiously as possible....
(e) ... [T]he commission may distribute, apportion, or allocate gross income, deductions, credits or allowances between or among [two or more] organizations, trades or businesses....
(f) From every order made by the commission under this chapter that is final or, if preliminary, is of the nature defined by section 91-lj(a)f[2] an appeal shall lie to the supreme court subject to chapter 602[3] only by a person aggrieved in the contested case hearing provided for under this section in the manner and within the time provided by chapter 602, and by the rules of court. The commission may elect to be a party to all matters from which an order of the commission is appealed, and the commission may file appropriate responsive briefs or pleadings in the appeal; provided that where there was no adverse party in the case below or in cases where there is no adverse party to the appeal, the commission shall be a party to all matters in which an order of the commission is appealed and shall file the appropriate responsive briefs or pleadings in defending all such orders. The appearance of the commission as a party in appellate proceedings in no way limits the participation of persons otherwise qualified to be parties on appeal. The appeal shall not of itself stay the operation of the order appealed from, but the court may stay the order after a hearing upon a motion therefor and may impose conditions it deems proper as to giving a bond and keeping the necessary accounts or otherwise in order to secure a restitution of the excess charges, if any, made during the pendency of the appeal in case the order appealed from should be sustained, reversed, or modified in whole or in part.
(g)For public utilities having annual gross revenues of less than $2,000,000, the commission may make and amend its rules and procedures which will provide the commission with sufficient facts necessary to determine the reasonableness of the proposed rates without unduly burdening the utility company and its customers.
(Emphasis added.)
In its answering brief, HELCO does not argue that this court lacks jurisdiction to hear Peterson’s appeal. Nevertheless,
jurisdiction is the base requirement for any court considering and resolving an appeal or original action. Appellate courts, upon determining that they lack jurisdiction shall not require anything other than a dismissal of the appeal or action. Without jurisdiction, a court is not in a position to consider the case further. Thus, appellate courts have an obligation to insure that they have jurisdiction to hear and determine each case. The lack of subject matter jurisdiction can never be waived by any party at any time. Accordingly, when we perceive a jurisdictional defect in an appeal, we must, sua sponte, dismiss that appeal.
Housing Fin. and Dev. Corp. v. Cattle, 79 Hawai'i 64, 76, 898 P.2d 576, 588 (1995) (citations, internal quotation signals, brackets, and ellipsis points omitted).
Because we perceive a jurisdictional defect, we address the issue sua sponte and dismiss this appeal.
[327]*327B. This Court Lacks Jurisdiction Under HRS Ch. 269 To Hear A Direct Appeal From An Order Of The PUC Dismissing A Complaint Against A Public Utility In A “Non-Ratemaking” Case.
We begin our analysis with the observation that judicial review of decisions of administrative agencies is governed by HAP A—in particular, HRS § 91-14—, which authorizes judicial review of the final decisions and orders of administrative agencies in contested eases. See supra note 2. However, “[proceedings for review shall be instituted in the circuit court ... except where a statute provides for a direct appeal to the supreme court[.]” See HRS § 91—14(b), supra at note 2.
Matters relating to the PUC are governed by HRS ch. 269. The chapter contains a direct appeal provision in HRS § 269-16(f)4 —the subsection that outlines the PUC’s authority to regulate utility rates. See section II.A of this opinion, supra. The presence or absence of subject matter jurisdiction over this appeal revolves around the resolution of what appears to be conflicting language in HRS § 269—16(f). On the one hand, the statute generally authorizes an appeal “[f]rom every order made by the commission under this chapter” (emphasis added), i.e., under HRS ch. 269, which outlines, inter alia, the general powers, duties, and investigative powers of the PUC. On the other hand, the statute simultaneously and specifically provides that “an appeal shall he” to this court “only by a person aggrieved in a contested case hearing provided for under this section” (emphasis added), i.e., under the section whose subject matter is restricted to “regulation of utility rates” and “ratemaking procedures.” In order to harmonize what appears to be conflicting language in HRS § 269-16(f), we turn to certain applicable canons of statutory construction as well as relevant legislative history for guidance.
1. Principles of statutory construction
Our analysis of HRS § 269-16(f) is guided by several basic principles of statutory construction. First, “[t]he fundamental starting point for statutory interpretation is the language of the statute itself.” Mathewson v. Aloha Airlines, Inc., 82 Hawai'i 57, 71, 919 P.2d 969, 983 (1996) (citation and internal quotation signals omitted); State v. Kwak, 80 Hawai'i 291, 295, 909 P.2d 1106, 1110 [Kwak I] (citation and internal quotation signals omitted), vacated in part on other grounds on reconsideration, 80 Hawai'i 297, 909 P.2d 1112 (1995) [Kwak II]. Second, “where the statutory language is plain and unambiguous, our sole duty is to give effect to its plain and obvious meaning.” Kwak I, 80 Hawai'i at 295, 909 P.2d at 1110 (citation and internal [328]*328quotation signals omitted). Third, implicit in the task of statutory construction is “our foremost obligation to ascertain and give effect to the intention of the legislature, which is to be obtained primarily from the language contained in the statute itself.” Mathewson, 82 Hawai'i at 71, 919 P.2d at 983 (citation and internal quotation signals omitted); Kwak I, 80 Hawai'i at 295, 909 P.2d at 1110 (citations and internal quotation signals omitted). Fourth, “[w]hen there is doubt, doubleness of meaning, or indistinetiveness or uncertainty of an expression used in a statute, an ambiguity exists.” Ko'olau Agric. Co. v. Commission on Water Resource Management, 83 Hawai'i 484, 488-89, 927 P.2d 1367, 1371-72 (1996) (citations, internal quotation signals, and brackets omitted). And fifth,
[i]n construing an ambiguous statute, the meaning of the ambiguous words may be sought by examining the context, with which the ambiguous words, phrases, and sentences may be compared, in order to ascertain their true meaning. Moreover, the courts may resort to extrinsic aids in determining the legislative intent. One avenue is the use of legislative history as an interpretive tool.
Gray v. Administrative Dir. of the Court, 84 Hawai'i 138, 148, 931 P.2d 580, 590 (1997) (citations, internal quotation signals, and brackets omitted).
As indicated above, because the language of HRS § 269—16(f) appears to provide, on the one hand, for a direct appeal “from every order made by the commission under this chapter” (emphasis added), and, on the other hand, “only by a person aggrieved in the contested case hearing provided for under this section” (emphasis added), it is apparent that the language of the statute is not free of ambiguity. Thus, applying the aforementioned principles of statutory construction, “the meaning of the ambiguous words may be sought by examining the context” of the ambiguous statute, which we do in applying two long-held maxims of statutory construction in an attempt to harmonize the wording of HRS § 269—16(f); we then “resort to extrinsic aids in determining the legislative intent,” which we do by turning to “legislative history as an interpretive tool” in order to harmonize the wording of the statute with the purposes and policies underlying HRS § 269—16(f).
a. application of canons of statutory construction to harmonize the wording of HRS § 269-16(f)
First, the canon of construction denominated noscitur a sociis provides that the meaning of words may be determined by reference to their relationship with other associated words and phrases. State v. Merino, 81 Hawai'i 198, 217, 915 P.2d 672, 691 (1996). Thus, when two or more words are grouped together, noscitur a sociis “requires that the more general and the more specific words of a statute must be considered together in determining the meaning of a statute, and that the general words are restricted to a meaning that should not be inconsistent with, or alien to, the narrower meanings of the more specific words of the statute.” In re Pacific Marine & Supply Co. Ltd., 55 Haw. 572, 578 n. 5, 524 P.2d 890, 894 n. 5 (1974); see also HRS § 1-15(1) (1993); N. Singer 2A Sutherland Statutory Construction § 47.16 (5th ed. 1992) [hereinafter, Sutherland Statutory Construction]. Accordingly, that portion of § 269-16(f) that appears to authorize direct appeals of any final order “made by” the PUC under HRS ch. 269 should be restricted by the more specific words of the statute, which authorize a direct appeal to this court—thereby bypassing the usual intervening review by the circuit court pursuant to HRS § 91-14(b), see supra note 2—only by a person aggrieved in a contested case hearing specifically conducted pursuant to HRS § 269-16.
A variation of noscitur a sociis is the maxim of ejusdem generis. Where general words follow specific words in a statute, the general words are construed to embrace only objects similar in nature to those objects enumerated by the preceding specific words. Richardson v. City and County of Honolulu, 76 Hawai'i 46, 74, 868 P.2d 1193, 1201, reconsideration denied, 76 Hawai'i 247, 871 P.2d 795 (1994). “Where the opposite sequence is found, i.e., specific words following general ones, the doctrine is equally applicable, and restricts application of the general term to [329]*329things that are similar to those enumerated.” Sutherland Statutory Construction § 47.17. As that treatise explains,
[t]he doctrine of ejusdem generis is an attempt to reconcile an incompatibility between specific and general words so that all words in a statute can be given effect, all parts of a statute can be construed together and no words will be superfluous. If the general words are given their full .and natural meaning, they would include the objects designated by the specific words, making the latter superfluous.
Id. Accordingly, the general phrase “[f]rom every order made by the commission under this chapter” precedes the more specific phrase limiting a direct appeal to this court to one taken “only by a person aggrieved in the contested case hearing provided for under this section,” the scope of which, by the express terms of HRS § 269-16(a), is limited to “[a]ll rates, fares, charges, classifications, schedules, rules, and practices made, charged, or observed by any public utility.” Applying the doctrine of ejusdem generis, the general language of HRS § 269-16(f) authorizing direct appeals to this court from any final order entered under HRS ch. 269 is therefore restricted by the specific language limiting such direct appeals to final orders entered in “ratemaking” cases under HRS § 269-16.
b. legislative history
Our interpretation of what may be directly appealed to this court under HRS § 269-16(f) is also guided by legislative history. HRS § 269-16 is the successor to Revised Laws of Hawai'i (RLH) § 2234 (1915), which provided:
Regulate rates, etc.; appeals. All rates, fares, charges, classifications, rules and practices made, charged, or observed by any public utility, or by two or more public utilities, jointly, shall be just and reasonable, and the commission shall have the power, after a hearing upon its own motion, or upon complaint, and in so far as it is not prevented by the constitution or laws of the United States, by order to regulate, fix and change all such rates, fares, charges, classifications, rules and practices, so that the same shall be just and reasonable, and to prohibit rebates and unreasonable discriminations between localities, or between users or consumers under substantially similar conditions. From every order made by the commission under the provisions of this section an appeal shall lie to the supreme court of Hawaii in like manner as an appeal lies from an order or decision of a circuit judge at chambers. Such appeal shall not of itself stay the operation of the order appealed from, but the supreme court may stay the same, after a hearing upon a motion therefore, upon such conditions as it may deem proper as to giving a bond and keeping the necessary accounts or otherwise in order to secure a restitution of the excess charges, if any, made during the pendency of the appeal in case the order appealed from should be sustained in whole or in part.
(Emphasis added.)
In 1920, this court held that RLH § 2234 (1915) authorized direct appeals only from those PUC orders that regulated, fixed, or changed rates, fares, charges, classifications, rules, or practices. City and County of Honolulu v. Honolulu Rapid Transit & Land Co., 25 Haw. 332, 334 (1920). Accordingly, we dismissed the direct appeal of a PUC order requiring the transit company to remove certain street railway tracks, holding that the non-ratemaking order at issue was not directly appealable to this court under RLH § 2234, but was secondarily appealable only after an initial appeal to the circuit court.5
[330]*330In 1925, the territorial legislature amended RLH § 2234. However, the amendment was nonsubstantive, altering only the numerical designation of the statute from RLH § 2234 to RLH § 2202. See 1925 Haw.Sess.L. Act 173, § 1 at 197-98. Section 2202 was later amended in several respects. See 1933 Haw. Sess.L. Act 169, § 2 at 188-89. One of the 1933 amendments changed the direct appeal language “[f]rom every order made by the commission under the provisions of this section an appeal shall lie to the supreme court of Hawaii” (emphasis added) to “[f]rom every order made by the commission under the provisions of this chapter an appeal shall lie to the supreme court of Hawaii” (emphasis added). This is substantially the language currently contained in HRS § 269-16(f). Unfortunately, there is no legislative history that explains the 1933 amendments.
While it might appear that the 1933 amendment allowing for a direct appeal “under the provisions of this chapter” was intended to permit the direct appeal of any final order “made by” the PUC, rather than merely ratemaking orders, such an interpretation is inconsistent with later amendments. Following a number of subsequent amendments, which are irrelevant to the disposition of this appeal, RLH § 2202 ultimately became HRS § 269-16 in 1967 and took its present form in 1973. A 1976 amendment, inter alia, added the present language authorizing a direct appeal “only by a person aggrieved in the contested ease hearing provided for under this section.” (Emphasis added.) See 1976 Haw.Sess.L. Act 10, § 1 at 15-16. According to the legislative history underlying the 1976 amendment,
[t]he purpose of this bill [amending HRS § 269-16] is to improve the procedures of the Public Utilities Commission in regulating the rates, fares, and charges which public utilities charge for their services.
[[Image here]]
[T]he bill ... clarifies] the law covering appeal procedures. As amended, the bill provides that only parties to a contested case proceeding, commonly referred to [as] an economic hearing, have the right to appeal a decision of the Public Utilities Commission to the Hawai[’]i Supreme Court..
Sen.Stand.Comm.Rep. 507-76, in 1976 Senate Journal, at 1101; Hse. Stand.Comm.Rep. No. 513-76, in 1976 House Journal, at 1501. (Emphasis added.) Thus, in amending HRS § 269-16, the legislature clearly intended that a direct appeal to this court only be allowed in a subset, of the contested ease proceedings conducted before the PUC, namely, those contested cases “commonly referred to” as “economic hearing[s]”; accordingly, it appears that a contested case hearing “under this section” could only mean a contested case hearing in a ratemaking case. Therefore, while HRS § 269—16(f) generally addresses the subject of appeals “from every order made by the commission under this chapter,” the same subsection specifically limits the right of direct appeals to this court—thereby bypassing the normal judicial review conducted in the circuit court in the first instance pursuant to HRS § 91-14(b), see supra note 2—to those taken by “a person aggrieved in the contested case hearing[6] [331]*331provided for under this section,” which, pursuant to HRS § 269-16(a), pertains exclusively to “ratemaking.”
That the only legislative purpose underlying HRS § 269-16 is, indeed, to further the “regulation of rates” charged by public utilities is evident from the history that accompanied amendments to the statute subsequent to 1976. The committee reports accompanying the 1982 amendment of HRS § 269-16 explained that “[t]he purpose of [the amendment] is to allow the [PUC] to vary its rules and regulations regarding procedures followed in its economic regulation of public utilities.” Sen.Stand.Comm.Rep. No. 603-82, in 1982 Senate Journal, at 1204; Hse. Stand.Comm.Rep. No. 506-82, in 1982 House Journal, at 1121. (Emphasis added.) In 1983, the legislature changed the title of HRS § 269-16 from “[r]egulate rates, etc., hearings, notice of hearings, appeals” to “Regulation of utility rates; ratemaking procedures.” See 1983 Haw.Sess.L. Act 98, § 2 at 169. Finally, the purpose of the 1984 amendment was “to provide the [PUC] with statutory authorization to render interim decisions granting rate relief to a utility until such time as the [PUC] is able to render a final decision on the appropriate amount of permanent rate relief to which a utility company may be entitled.” Sen. Stand.Comm.Rep. No. 560-84, in 1984 Senate Journal, at 1278; Hse.Stand.Comm.Rep. No. 305-84, in 1984 House Journal, at 960. (Emphases added.) Thus, there can be no doubt that the legislature intended that HRS § 269-16 deal only with the power of the PUC to regulate rates. That being the case, it therefore follows that a direct appeal “under this section” can only be taken to this court from a PUC order pertaining to “regulation of rates” or “ratemaking procedures.”
2. The bottom line
Based on the foregoing, we hold that, under § 269—16(f), a direct appeal from a PUC order lies to this court only when the PUC order pertains to “regulation of utility rates” or “ratemaking procedures.” Therefore, because D & O No. 13198 was not an order pertaining to the “regulation of utility rates” or “ratemaking procedures,” but, rather, merely addressed the placement of HEL-CO’s PTL No. 2 in accordance with D & O No. 10620, we hold that this court, pursuant to § 269—16(f), lacks appellate jurisdiction to hear this direct appeal.7
III. CONCLUSION
For the foregoing reasons, we dismiss this appeal for want of appellate jurisdiction.8