Hurley v. Kincaid

285 U.S. 95, 52 S. Ct. 267, 76 L. Ed. 637, 1932 U.S. LEXIS 778
CourtSupreme Court of the United States
DecidedFebruary 23, 1932
Docket457
StatusPublished
Cited by185 cases

This text of 285 U.S. 95 (Hurley v. Kincaid) is published on Counsel Stack Legal Research, covering Supreme Court of the United States primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Hurley v. Kincaid, 285 U.S. 95, 52 S. Ct. 267, 76 L. Ed. 637, 1932 U.S. LEXIS 778 (1932).

Opinion

*99 Mr. Justice Brandéis

delivered the opinion of the Court.

On June 15, 1929, Kincaid brought this suit in the federal court for western Louisiana against the United States, the Secretary of War, the Chief of Engineers, the Mississippi River Commission and its members, to enjoin the carrying out of ,any work in the Boeuf Floodway under the Mississippi River Flood Control Act, May 15, 1928, c. 569, 45 Stat. 534, and specifically to enjoin the receiving of bids and awarding of contracts for the construction of certain guide-levees bounding the Floodway.

The Mississippi River Flood Control Act adopted the Jadwin Plan for protection against floods. The Act provides for raising the levees generally three feet; for improving the carrying capacity of the main channel of the river by revetment work; and for limiting the flood-waters in this channel to its safe capacity through the provision of specified diversion channels. Among these is the Boeuf Floodway, which will carry excess flood-waters from a point below the mouth of the Arkansas through the Boeuf Basin west of the Mississippi into the backwater area at the mouth of the.Red River. Such diversion has taken place to some extent in the past, when flood-waters have passed over, or through crevasses in, the twenty mile section of the levee at the head, of the Basin, known as the Cypress Creek levee.' Before *100 this section was completed, in 1921, the Boeuf Basin and the parallel Tensas Basin, lying between it and the main channel, served as natural overflow areas of the Missis- ■ sippi in flood periods. The Plan leaves the Cypress Creek section at its present height. But as the levees elsewhere are to be raised three feet and materially strengthened, preventing overflow at other points, the volume of water passing into the diversion channel may be greatly increased. Moreover, guide, or protection, levees running in a southerly direction are to be built on either side of the Floodway, which will direct the waters into a specified channel of a width varying from ten to twenty miles; and new levees are to be constructed which will cause this Floodway to carry waters formerly overflowing into the Tensas Basin. The maximum previous flow of water into the Boeuf Basin occurred in 1927, and is estimated at 450,000 cubic feet per second. Under the new Plan the flow may reach 1,250,000 feet per second in times of extraordinary flood. The War Department advertised for bids for the construction of guide-levees for the Boeuf" Floodway, to be received June 17, 1929. To complete the project will probably require ten years.

Kincaid owns a 160-acre farm in the Boeuf Basin at a point 125 miles below the point of diversion. No part of the guide-levees is to be built on his land; but the land lies within the proposed channel of the Floodway. He alleges that the project-will expose his property to additional destructive floods and thus subject it to a new servitude; that the mere “setting apart [of] this property as a flood way and diversion channel and . . . advertising for and receiving bids for . . . construction of the guide levees ” casts a cloud upon his title; 1 and that the Government is proposing to com *101 menee the work without having instituted condemnation proceedings. He charges that the acts of the defendants in advertising for bids for the construction of the guide-levees, to be followed by the letting of contracts, without having taken proceedings to condemn his land, “ will mean the taking by the United States Government of complainant’s lands and properties without due process of.law and without just compensation.”

All the defendants moved to dismiss the bill on the grounds, among others, that the United States had not consented to be sued, and that the bill disclosed no ground for equitable relief. The District Court held th,at the United States could not be made a party, since it had not consented to be sued; but overruled the motion to dismiss the suit, on the ground that the United States was not an indispensable party; that § 4 of the Act declares that “ the United States shall provide flowage rights for additional destructive flood waters that will *102 pass by reason of diversion from the main channel of the Mississippi River”; 2 that, on the allegations-of the bill, the creation of the Boeuf Floodway would subject Kincaid’s land to additional destructive flood-waters; that the Act required the Government to condemn, or otherwise to acquire -flowage rights over, the property before proceeding with the flood-control project in the Boeuf Basin; ,and that, by starting work before acquiring such rights, the defendants were proceeding in violation of both the Act and the Constitution. 35 F. (2d) 235.

Thereupon an answer was filed and the case was heard on evidence on final hearing, The defendants showed *103 that, in the opinion of the Secretary of War and the Chief of Engineers, it was unnecessary to acquire any flowage rights over complainant’s lands; insisted that these lands would be better protected under the Plan than heretofore; and claimed that § 4 of the Act was not applicable, because the Plan would not subject the property to “ additional destructive flood waters.” The District Court found on these issues against the Government; held that upon the evidence the Plan involved a taking of rights in respect to Kincaid’s land; and that although the physical occupancy of it would not occur until the land had been overflowed in time of flood, “ the process of subjecting it to that service and the taking possession in <so far as is either necessary or contemplated by the act will begin with the construction of the first levee or'works which are intended to direct the water upon the land.” It enjoined the defendants, other than the United States, “ from proceeding with the construction authorized by or carrying out the plan adopted by . . . the Mississippi River flood-control act in the Boeuf Basin flood way, . ... until the property of the said complainant has been acquired by the Ünited States Government or the flowage rights over the same acquired either by purchase or condemnation for such purpose.” 37 É. (2d) 602. The Circuit Court of Appeals affirmed the judgment of the District Court. 49 F. (2d) 768. This Court granted a writ of certiorari.

We have no occasion to determine any of the controverted issues of fact or any of the propositions of substantive law which have been argued. Kincaid concedes that the Act is valid and that it authorizes those entrusted with its execution to take his lands or an easement therein. We may assume that, as charged, the mere adoption by Congress of a plan of flood control which involves an intentional, additional, occasional flooding of complainant’s land constitutes a taking of it — as soon as the Government *104 begins to carry out the project authorized. Compare United States v. Lynah, 188 U. S. 445, 469; United States v. Cress,

Related

Stueve Bros. Farms, LLC v. United States
737 F.3d 750 (Federal Circuit, 2013)
Stueve Bros. Farms, LLC v. United States
107 Fed. Cl. 469 (Federal Claims, 2012)
Lion Raisins, Inc. v. United States
416 F.3d 1356 (Federal Circuit, 2005)
Sexton v. Public Service Commission
423 S.E.2d 914 (West Virginia Supreme Court, 1992)
Abbiss v. Delaware Department of Transportation
712 F. Supp. 1159 (D. Delaware, 1989)
Francis Skaw v. United States
740 F.2d 932 (Federal Circuit, 1984)
Collier v. City of Springdale
733 F.2d 1311 (Eighth Circuit, 1984)
Nika Corp. v. City of Kansas City, Mo.
582 F. Supp. 343 (W.D. Missouri, 1984)
Brewer v. United States
562 F. Supp. 128 (E.D. Missouri, 1983)
Union Carbide Agricultural Products Co. v. Costle
632 F.2d 1014 (Second Circuit, 1980)
Oahe Conservancy Sub-District v. Alexander
493 F. Supp. 1294 (D. South Dakota, 1980)
United States v. Bedford Associates
618 F.2d 904 (Second Circuit, 1980)
C. S. Lenoir v. Porters Creek Watershed District
586 F.2d 1081 (Sixth Circuit, 1978)
Kohlasch v. New York State Thruway Authority
460 F. Supp. 956 (S.D. New York, 1978)

Cite This Page — Counsel Stack

Bluebook (online)
285 U.S. 95, 52 S. Ct. 267, 76 L. Ed. 637, 1932 U.S. LEXIS 778, Counsel Stack Legal Research, https://law.counselstack.com/opinion/hurley-v-kincaid-scotus-1932.