This text of 604 N.E.2d 1310 (Fall River Hous. Auth. v. HV COLLINS CAPE COD LATH) is published on Counsel Stack Legal Research, covering Massachusetts Supreme Judicial Court primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Fall River Hous. Auth. v. HV COLLINS CAPE COD LATH, 604 N.E.2d 1310, 414 Mass. 10, 1992 Mass. LEXIS 630 (Mass. 1992).

Opinion

Nolan, J.

Once again we must work our way through the brambles surrounding the right to indemnity at common law. In this case, there are two issues: (1) whether there is an implied right of indemnification arising from the terms of a subcontract between the general contractor and the subcontractor; and (2) if the right exists in this case, when does an *11 action based on implied contractual indemnity accrue? We hold that there is no implied contractual indemnity in this case, and, consequently, we do not reach the second issue.

This case began on March 16, 1988, by a complaint founded on a contract dispute between the Fall River Housing Authority (Fall River) and H.V. Collins Company (Collins), the general contractor on a housing development for the elderly. On April 27, 1988, Collins filed a third-party complaint against Cape Cod Lath & Plaster, Inc. (Cape Cod), a subcontractor on the development, for contribution and indemnification of any payments which Collins might have to make to Fall River. On April 9, 1990, the Superior Court judge granted Cape Cod’s motion for summary judgment on the third-party claim and subsequently denied Collins’ motion for reconsideration on September 25, 1990. The judge ruled that Collins’ claim against Cape Cod was barred by the statute of limitations, 1 and judgment was entered on February 5, 1991, dismissing Collins’ third-party complaint as well as all remaining parties and claims in the case. However, when Collins turned to Fall River and moved for summary judgment on the ground that Fall River’s claims against Collins were likewise time barred, a different judge in the Superior Court denied Collins’ motion. The judge held that Fall River’s claim against Collins, in contrast to Collins’ third-party claim against Cape Cod, was not barred by the statute of limitations. 2 In reaching her decision, the judge *12 ruled that the previous decision was not controlling on the action' between Fall River and Collins because it was based upon the subcontract between Collins and Cape Cod to which Fall River was not a party. Collins then settled with Fall River, and judgment was entered against Collins for $85,000 on November 15, 1990. Collins appeals only from the grant of summary judgment to Cape Cod on the third-party claim. 3

“An order granting or denying summary judgment will be upheld if the trial judge ruled on undisputed material facts and his ruling was correct as a matter of law.” Commonwealth v. One 1987 Mercury Cougar Auto., 413 Mass. 534, 536 (1992), citing Community Nat’l Bank v. Dawes, 369 Mass. 550, 556 (1976). In the present case, no material facts are in dispute, and, therefore, we review only whether Collins may maintain a claim against Cape Cod for implied contractual indemnity as a matter of law. The judge ruled that Collins’ claim against Cape Cod accrued at the time Cape Cod allegedly breached its subcontract with Collins. Therefore, since Cape Cod’s work was completed no later than October 31, 1981, and yet the complaint against Cape Cod was not filed until April of 1988, the judge ruled that Collins’ claim against Cape Cod was barred by the six-year statute of limitations. We affirm.

In contrast to the procedural history, the facts of this case are quite straightforward. On October 9, 1980, Fall River contracted with Collins for the construction of a low-income elderly housing project. Collins then subcontracted with Cape Cod to install a synthetic stucco wall system manufactured by Dryvit System, Inc. (Dryvit). Cape Cod’s work was finished by October, 1981; the work was certified as complete in November, 1981, and the subcontractors were paid the same month. The entire project was certified as substantially complete on March 22, 1982, and accepted by Fall River on *13 November 11, 1983. Not until March of 1987 were any defects found in the exterior wall system. At that time an inspector discovered that water had penetrated the walls and damaged the insulation. In March, 1988, nearly six years after the project was certified complete, Fall River sued Collins, Collins’ insurer, and Dryvit to recover the costs of removing and reinstalling the wall system and repairing all other damage caused by the leakage.

The subcontract between Collins and Cape Cod provides that Cape Cod will indemnify Collins for claims, damages, and expenses arising out of Cape Cod’s negligent performance. The parties agree, however, that this provision does not apply to their situation. The subcontract also states that “[sjuch obligation shall not be construed to . . . reduce any other right or obligation of indemnity which would otherwise exist as to any party . . . .” We have held that indemnity provisions will be construed “fairly and reasonably ... to ascertain the intention of the parties and to effectuate their purpose.” Whittle v. Pagani Bros. Constr. Co., 383 Mass. 796, 798 (1981), citing Shea v. Bay State Gas Co., 383 Mass. 218, 221-223 (1981), and cases cited. Collins contends that this provision preserves an implied right of contractual indemnity; we disagree.

When there is an express agreement of indemnity in a contract, a claim for indemnity accrues when there is a breach of that provision. See Ryan Stevedoring Co. v. Pan-Atlantic S.S. Corp., 350 U.S. 124, 130 (1956) (formal indemnity bond creates independent contract right to recovery). 4 For example, in this case if a person were injured due to Cape Cod’s negligence, then a breach of contract would occur when Collins pays damages to the injured person because Cape Cod expressly agreed to pay such damages. Consequently, a claim against Cape Cod for contractual indemnity would accrue from the time the indemnity provision was *14 breached. Compare Peterson v. Abbe, 234 Mass. 467, 469-470 (1920) (express indemnity contract creates surety relationship so that indemnity claim accrues from failure of defendant principal to indemnify plaintiff surety), with Nutter v. Mroczka, 303 Mass. 343, 346 (1939) (indemnity claim accrues when payment violates express contract provision, but absent express indemnity clause, claim based only on breach of contract to pay mortgage). See Black’s Law Dictionary 1442, Suretyship, Contract of (6th ed. 1990) (surety has indemnification claim against principal based on surety contract).

Lacking an express indemnity provision applicable to the facts of this case, Collins asks this court to find an implied right of contractual indemnity so that an equitable resolution may be reached. A contractual right to indemnity arises from the relationship between the parties. Araujo v. Woods Hole, Martha’s Vineyard, Nantucket S.S. Auth.,

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Sharp v. Hylas Yachts, LLC
872 F.3d 31 (First Circuit, 2017)
Blixseth v. Byrne
214 F. Supp. 3d 97 (D. Massachusetts, 2016)
In re Corbett
550 B.R. 170 (D. Massachusetts, 2016)
Santolucito v. DeMoulas Super Markets, Inc.
30 Mass. L. Rptr. 372 (Massachusetts Superior Court, 2012)
Devaney v. Affiliated Insurance Managers, Inc.
30 Mass. L. Rptr. 21 (Massachusetts Superior Court, 2012)
Downey v. Chutehall Construction Co.
30 Mass. L. Rptr. 403 (Massachusetts Superior Court, 2012)
Vreeken v. Lockwood Engineering, B.V.
218 P.3d 1150 (Idaho Supreme Court, 2009)
Curtis v. GREENPOINT MORTGAGE FUNDING, INC.
661 F. Supp. 2d 65 (D. Massachusetts, 2009)
Georgiadis v. Yankee Engineering & Testing, Inc.
24 Mass. L. Rptr. 105 (Massachusetts Superior Court, 2008)
Abraham Properties, Inc. v. Engineering Design Consultants, Inc.
23 Mass. L. Rptr. 678 (Massachusetts Superior Court, 2008)
Agostini v. Pilgrim Insurance
2008 Mass. App. Div. 19 (Mass. Dist. Ct., App. Div., 2008)
American Insurance Co. v. Siena Construction Corp.
23 Mass. L. Rptr. 252 (Massachusetts Superior Court, 2007)
EMC2 v. Advance Manufacturing Co.
2007 Mass. App. Div. 126 (Mass. Dist. Ct., App. Div., 2007)
Garcia v. Federics
22 Mass. L. Rptr. 682 (Massachusetts Superior Court, 2007)

Cite This Page — Counsel Stack

Bluebook (online)
604 N.E.2d 1310, 414 Mass. 10, 1992 Mass. LEXIS 630, Counsel Stack Legal Research, https://law.counselstack.com/opinion/fall-river-hous-auth-v-hv-collins-cape-cod-lath-mass-1992.