Draft Systems, Inc. v. Rimar Manufacturing, Inc.

524 F. Supp. 1049, 32 U.C.C. Rep. Serv. (West) 1493, 1981 U.S. Dist. LEXIS 16779
CourtDistrict Court, E.D. Pennsylvania
DecidedOctober 9, 1981
DocketCiv. A. 77-2557
StatusPublished
Cited by11 cases

This text of 524 F. Supp. 1049 (Draft Systems, Inc. v. Rimar Manufacturing, Inc.) is published on Counsel Stack Legal Research, covering District Court, E.D. Pennsylvania primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Draft Systems, Inc. v. Rimar Manufacturing, Inc., 524 F. Supp. 1049, 32 U.C.C. Rep. Serv. (West) 1493, 1981 U.S. Dist. LEXIS 16779 (E.D. Pa. 1981).

Opinion

MEMORANDUM AND ORDER

JOHN MORGAN DAVIS, Senior District Judge.

After a jury trial in this contract action, a verdict was returned for the plaintiff, Draft Systems Inc., in the amount of $409,-184.16. Before the court are defendant’s motions for judgment n. o. v. and for a new trial which in substance challenge the sufficiency of the evidence in support of the *1051 award of damages. 1 After careful consideration of these motions, I have concluded that the arguments raised therein are without merit, and they are denied accordingly. 2

Plaintiff, Draft Systems, is engaged in the business of manufacturing a type of dispensing unit used on beer kegs. TR. 2.67-8. This beer dispensing unit consists essentially of two component parts — a double valve and a syphon tube. TR. 2-12. One component part, the syphon tube, which is approximately eighteen inches in length and made of graded nylon, was supplied by the defendant, Rimar Manufacturing, Inc. TR. 2.23. Throughout 1974 the plaintiff submitted purchase orders for various amounts of nylon 11 or nylon 2908L tubing to the defendant. TR. 2.27-33. In August 1975 the defendant filled the aforesaid orders by shipping the required amounts to the plaintiff. After the inspection of the amount of goods and specifications of the tubing, including a check of the accompanying documents which certified that the tubing was actually nylon 11, the plaintiff accepted the goods and began using them in its manufacturing process. TR. 2.28 — 40. Some months later, the plaintiff began receiving complaints from beer distributors that the dispensing mechanism was not functioning properly. It was later determined that the defendant forwarded a different grade of tubing, nylon 6, rather than the nylon 11 specified in the purchase orders and blueprints supplied by plaintiff. TR. 3.59. Expert testimony established that because of the higher liquid absorption rate of nylon 6 tubing contrasted with the absorption rate of nylon 11, an excessive amount of beer was absorbed by the nylon 6 tubing. This excessive absorption caused the internal diameter of the tubing to expand, thus, breaking the seal between the tubing and the metal portion of the dispensing unit to which the tubing was attached. TR. 3.71. It was theorized that, after carbon dioxide was pumped into the keg in order to force beer from it — i. e. drafting the beer — carbon dioxide entered the beer stream through the broken seal; this created a condition known as “wild beer” which was unfit for consumption.

The jury, by interrogatories, found that the defendant breached the express, and implied warranties of merchantability and fitness for a particular purpose which were incorporated into the contract. In its post trial motions, defendant presents a myriad of claims for relief from the judgment against it. I now turn to these contentions.

Preliminarily, defendant vigorously contends that all items of consequential damages should be excluded from the verdict because the evidence is insufficient to support the jury award. More specifically, it asserts that the proof failed to demonstrate that defendant had any knowledge concerning the particular requirement of the contract that the nylon tubing supplied could not have a liquid absorption rate in excess of that of nylon ll. 3 This argument, however, misconceives the nature of consequential damages.

*1052 The seminal case in Pennsylvania on the ability of a contractee to recover consequential damages is R. I. Lampus Co. v. Neville Cement, Etc., 474 Pa. 199, 378 A.2d 288 (1977). Lampus rejected the long standing tacit-agreement rule as the measure of consequential damages. As stated by the court, “[ujnder Section 2-715(2), consequential damages are proper for any loss resulting from general or particular requirements and needs of which the seller at the time of contracting had reason to know and which could not reasonably be prevented by cover or otherwise.” Id. at 206-07, 378 A.2d at 291 (emphasis in original). The rule enunciated by the court embodies the less restrictive reasonably foreseeable test which has been espoused by Professor Corbin. 4 Thus, “[a]ll that is required is that the seller have reason to know the buyer’s needs and requirements.” Id. at 208, 378 A.2d at 292. (emphasis in original).

In this case, the defendant knew the nature of the plaintiff’s business. The defendant knew that the nylon tubing was required as a component of the plaintiff’s beer dispensing system. TR. 2.70. It knew that the tubing would eventually be immersed within the beer. TR. 2.71. Furthermore, the company knew that nylon 6 did not have the same hydroscopic properties as nylon 11. TR. 2.73. It also knew that the plaintiff required nylon 11 for use in its product. TR. 2.74 & 2.76. In short, the defendant knew of all plaintiff’s general and particular requirements except the precise demarcation in absorption rates which would render nylon 6 useless. But the plaintiff’s specification of the particular grade of nylon coupled with the defendant’s knowledge of the difference in the absorption properties of varying grades of nylon, put the defendant on notice of the particular quality of tubing which would be valuable to the buyer. Thus, the jury could properly find that the defendant had sufficient reason to know of the general and particular requirements of the plaintiff to thereby charge defendant with the consequential losses proximately following from the breach of warranty under section 2715(b). 5 See R. I. Lampus Co. v. Neville *1053 Cement, Etc., supra, 474 Pa. at 209, 378 A.2d at 293.

Alternatively, the defendant contends that the award of consequential damages is precluded under Section 2-715(2) of the code since the plaintiff failed to perform an adequate inspection of the tubing to ensure that conforming goods were incorporated in the finished product. While the defendant restates the law correctly, the underlying facts do not support his position.

Section 2-715(2)(a) of the Code provides, in part, for the award of consequential damages resulting from seller’s breach “which could not reasonably be prevented by cover or otherwise.” 6 Hence, the dispositive question is whether the plaintiff’s actions upon receipt of the goods were commercially reasonable.

The testimony establishes that upon receipt of the tubing from Rimar, the plaintiff performed various tests to insure that the goods conformed to specifications as to length, width, inside and outside diameter, and quantity. TR. 2.37. Furthermore, the product certification of tubing grade forwarded by the defendant was compared to the corresponding bills of lading to verify that the tubing shipped was actually nylon 11. TR. 2.38. It is undisputed that the tubing shipped was nonconforming nylon 6 and that the plaintiff was unaware of the certification error until an investigation into the keg failures was instituted.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Commonwealth, Department of Transportation v. Brozzetti
684 A.2d 658 (Commonwealth Court of Pennsylvania, 1996)
Lowell Paper Box Co. v. Omni Resources Corp.
2 Mass. L. Rptr. 649 (Massachusetts Superior Court, 1994)
Technographics, Inc. v. Mercer Corp.
777 F. Supp. 1214 (M.D. Pennsylvania, 1991)
Dale R. Horning Co. v. Falconer Glass Industries, Inc.
730 F. Supp. 962 (S.D. Indiana, 1990)
Draft Systems, Inc. v. Alspach
756 F.2d 293 (Third Circuit, 1985)
Schoenenberger v. Hayman
465 A.2d 1335 (Commonwealth Court of Pennsylvania, 1983)
Pee Jay's Packing Co. v. Makfil Systems
34 Pa. D. & C.3d 285 (Philadelphia County Court of Common Pleas, 1983)
Draft Systems, Inc. v. Rimar Mfg., Inc
688 F.2d 820 (Third Circuit, 1982)
Lanza v. Poretti
537 F. Supp. 777 (E.D. Pennsylvania, 1982)

Cite This Page — Counsel Stack

Bluebook (online)
524 F. Supp. 1049, 32 U.C.C. Rep. Serv. (West) 1493, 1981 U.S. Dist. LEXIS 16779, Counsel Stack Legal Research, https://law.counselstack.com/opinion/draft-systems-inc-v-rimar-manufacturing-inc-paed-1981.