Chesin Construction Co. v. Epstein

446 P.2d 11, 8 Ariz. App. 312, 1968 Ariz. App. LEXIS 531
CourtCourt of Appeals of Arizona
DecidedOctober 23, 1968
Docket2 CA-CIV 553
StatusPublished
Cited by26 cases

This text of 446 P.2d 11 (Chesin Construction Co. v. Epstein) is published on Counsel Stack Legal Research, covering Court of Appeals of Arizona primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Chesin Construction Co. v. Epstein, 446 P.2d 11, 8 Ariz. App. 312, 1968 Ariz. App. LEXIS 531 (Ark. Ct. App. 1968).

Opinion

MOLLOY, Judge.

This litigation arises out of an accident in the construction industry. It raises the question of whether a general contractor is liable for injuries to an employee of a subcontractor caused by improper work procedures practiced by the subcontractor when the only fault of the general contractor was failure to properly supervise.

The job in question was a commercial building being built under contract with the owner by the defendant Chesin Construction Company. Chesin had subcontracted substantially all of the work to various specialty contractors. Among the twelve subcontracts was a lump-sum contract for carpentry labor entered into between Chesin and Steve Demenge, who was the employer of the plaintiff Epstein.

Under the written subcontract, all work was to be performed under the “direct *313 supervision” of Chesin but the subcontractor was to “ * * * assume full responsibility for the proper location of the work and performance thereof, and shall at all times maintain adequate and competent supervision on the project.” The subcontractor was to provide his own tools and equipment, and to carry Workmen’s Compensation Insurance on all of his employees. An additional provision on safety measures reads:

“During the course of construction, Sub-Contractor shall be responsible to see that all safety measures shall be employed to guard against injury to persons or property on the premises.”

Testimony at the trial indicated that Chesin’s supervisory employees considered that they had the authority to stop the work of the subcontractors if they observed any dangerous practices being followed. A Chesin supervisory employee opined that “all superintendents look after the overall safety of a job.” The superintendent had, according to this same witness, the authority “ * * * to direct the subcontractors in the order of the performance of their work.”

The plaintiff Epstein was a journeyman •carpenter, who, together with three other ■employees of Demenge, and Demenge himself, was employed on the day of the accident in installing certain prefabricated wooden trusses which were to form the skeletal structure for the roof of the building. These trusses were designed to span the 40-foot width of the structure. Each truss was in the shape of an isosceles triangle with the base being 40-feet long and the two equilateral sides coming together in the center at three feet and nine inches above the base, thus creating the supporting structure for a two-pitched roof sloping each way from the center. These trusses were constructed of lumber with a thickness of one and five-eighths inches, and in their overall length were somewhat flexible until secured in place by appropriate bracing.

The trusses were being set, according to plans, at two-foot intervals along the length of the building and about thirty of them had been set in place when the accident occurred. As each truss was set in place, it was fastened at its base to a wood plate running along the top of the wall on each side and the tops of each truss were joined together with a “ribbon” of one-inch lumber nailed into each truss by one eight-penny nail. This was temporary construction bracing which would be removed when the permanent bracing called for by the plans was installed. The installation of this “ribbon” material was the responsibility of the plaintiff Epstein. While he was in the center of one of the trusses performing this work, one of the trusses fell over and caused a domino effect on a number of the other trusses. At least two of the trusses fell to the cement floor and six or more of the trusses inverted and were hanging upside down from the walls. Epstein was seriously injured and a substantial verdict in his favor was rendered in the lower court against Chesin, from which an appeal is here taken.

There is no evidence in the record that Chesin, through its employees, interfered in any manner with the work of the carpentry subcontractor, or, gave the subcontractor instruction how to install these braces, or that it failed in any way in its contractual obligation to provide suitable material for the carpentry work. Neither is there any showing that this accident resulted from a scheduling of work by Chesin nor by reason of any other affirmative action taken by Chesin or any of the other subcontractors under its supervision. The sole contention of liability is based upon the failure of Chesin to properly supervise and to prevent the particular method used by the carpentry subcontractor in the installation of these trusses.

There is ample evidence in the record, though it is disputed, that the method used in bracing the trusses during construction was inadequate and not in accordance with standard practices. Additionally, a journeyman carpenter who was employed by Chesin *314 at the time of this accident as its superintendent testified that he was aware of the method being used to brace these trusses during construction and that, in his opinion, the bracing was “inadequate” and “unsafe.” At the same time, however, the superintendent refused to characterize the situation as “dangerous” and expressed the opinion that though he might have done the work in a different manner, he did not consider that he had authority to order the carpentry subcontractor to install additional braces. The carpentry subcontractor testified that, if the superintendent had ordered him to use additional bracing in this installation, he would not have done so because the superintendent’s authority was limited to directing him to comply with plans and specifications. The plans did not specify what type of construction bracing would be used. The carpentry subcontractor blamed the accident on the plaintiff’s failure to nail the top “ribbon” properly.

Additionally supportive of the verdict is testimony of Chesin’s superintendent that he overheard the plaintiff request additional bracing on the trusses, which request was refused or ignored by the carpentry foreman. The plaintiff himself testified as to such a request on two occasions during the installation, which request in each case was directed to the carpentry foreman who had responded that additional bracing was not needed.

The plaintiff has not contested that the contract between Chesin and Demenge created an independent contractor status, but the contention is advanced that Chesin retained sufficient control over this work so that a jury’s verdict of liability must be upheld. The principal reliance of the plaintiff is upon the Restatement (Second) of Torts § 414:

“One who entrusts work to an independent contractor, but who retains the control of ány part of the work, is subject to liability for physical harm to others for whose safety the employer owes a. duty to exercise reasonable care, which is caused by his failure to exercise his control with reasonable care.” (Emphasis added)
Restatement (Second) of Torts § 414, at 387.

For reversal, the appellant has advanced arguments revolving around statutory provisions pertaining to the Workmen’s Compensation Act 1 and the contention that there is insufficient evidence of control over the work of the subcontractor to sustain a verdict against the general contractor. We consider the latter contention first because we consider it dispositive.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

harte/travelers v. vasquez/special fund/ramirez
Court of Appeals of Arizona, 2019
Rause v. Paperchine, Inc.
743 F. Supp. 2d 1114 (D. Arizona, 2010)
Vega v. Griffiths Construction, Inc.
833 P.2d 717 (Court of Appeals of Arizona, 1992)
Lewis v. N.J. Riebe Enterprises, Inc.
825 P.2d 5 (Arizona Supreme Court, 1992)
Swichtenberg v. Brimer
828 P.2d 1218 (Court of Appeals of Arizona, 1991)
Maders v. Estes Co.
820 P.2d 322 (Court of Appeals of Arizona, 1991)
Lewis v. N.J. Riebe Enterprises, Inc.
823 P.2d 74 (Court of Appeals of Arizona, 1990)
DeMontiney v. Desert Manor Convalescent Center, Inc.
695 P.2d 270 (Court of Appeals of Arizona, 1984)
Esther Lee Begay, Etc. v. The Kerr-Mcgee Corporation
682 F.2d 1311 (Ninth Circuit, 1982)
Hammond v. Bechtel Inc.
606 P.2d 1269 (Alaska Supreme Court, 1980)
Sullins v. Third & Catalina Construction Partnership
602 P.2d 495 (Court of Appeals of Arizona, 1979)
State v. Morris
555 P.2d 1216 (Alaska Supreme Court, 1976)
Fresquez v. Southwestern Industrial Contractors & Riggers, Inc.
554 P.2d 986 (New Mexico Court of Appeals, 1976)
Pruett v. Precision Plumbing, Inc.
554 P.2d 655 (Court of Appeals of Arizona, 1976)
Jackson v. Sergent, Hauskins & Beckwith Engineers, Inc.
512 P.2d 862 (Court of Appeals of Arizona, 1973)
Allison Steel Manufacturing Co. v. Superior Court
511 P.2d 198 (Court of Appeals of Arizona, 1973)
Hand v. RORICK CONSTRUCTION COMPANY
206 N.W.2d 835 (Nebraska Supreme Court, 1973)
Hammer v. Bell Construction Co.
491 P.2d 497 (Court of Appeals of Arizona, 1971)
Reber Ex Rel. Industrial Commission v. Chandler High School District 202
474 P.2d 852 (Court of Appeals of Arizona, 1970)
Livingston v. Citizen's Utility, Inc.
474 P.2d 453 (Court of Appeals of Arizona, 1970)

Cite This Page — Counsel Stack

Bluebook (online)
446 P.2d 11, 8 Ariz. App. 312, 1968 Ariz. App. LEXIS 531, Counsel Stack Legal Research, https://law.counselstack.com/opinion/chesin-construction-co-v-epstein-arizctapp-1968.