Board of Regents of the University of Nebraska v. Wilscam Mullins Birge, Inc.

433 N.W.2d 478, 230 Neb. 675, 1988 Neb. LEXIS 462
CourtNebraska Supreme Court
DecidedDecember 23, 1988
Docket87-370
StatusPublished
Cited by80 cases

This text of 433 N.W.2d 478 (Board of Regents of the University of Nebraska v. Wilscam Mullins Birge, Inc.) is published on Counsel Stack Legal Research, covering Nebraska Supreme Court primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Board of Regents of the University of Nebraska v. Wilscam Mullins Birge, Inc., 433 N.W.2d 478, 230 Neb. 675, 1988 Neb. LEXIS 462 (Neb. 1988).

Opinion

*676 Grant, J.

On April 13,1984, the Board of Regents of the University of Nebraska (University) filed this action against architects Wilscam Mullins Birge, Inc. (Wilscam), for damages suffered due to alleged design deficiencies and negligent supervision and inspection of construction of the college of pharmacy building at the University of Nebraska Medical Center (UNMC) in Omaha. The petition alleged Wilscam negligently designed the building by failing to allow for deflection of the floor slabs, negligently inspected the contractor’s work by failing to detect deviations from the plans and specifications during construction, negligently approved defective shop drawings and allowed the contractor to construct the floor slabs according to the erroneous shop drawings, and negligently failed to design floor slabs that would meet design loading criteria. Wilscam filed a third-party action against Walter D. Rudeen and Associates, Inc. (Rudeen), in connection with the preparation or. approval of the allegedly defective shop drawings. The district court held that Wilscam’s cause of action against Rudeen did not accrue until Wilscam’s liability to the University became fixed. No appeal has been taken on this issue.

The trial was bifurcated, pursuant to Neb. Rev. Stat. § 25-221 (Reissue 1985), to determine the issues related to Wilscam’s statute of limitations defense, and all the parties agreed that the matter should be tried to the court without a jury. The district court for Douglas County held that the action was one for professional negligence and was barred by Neb. Rev. Stat. § 25-222 (Reissue 1985).

The University timely appealed and, in this court, sets out four assignments- of error, alleging the district court erred in holding (1) that § 25-222 was the applicable statute of limitations; (2) that the statute of limitations for all causes of action began to run no later than December 1,1982; (3) that the second cause of action was barred because the brick tie, angle iron attachment, and brick placement on the support shelf problems were problems distinct from the cracking brick problem and its causes; and (4) that the third and fourth causes of action were barred by the statute of limitations because the *677 structural weight-bearing defect was separate and distinct from the cracking brick problem and its causes. We affirm.

On the same date of April 13, 1984, the University filed’a separate action against Lueder Construction Company (Lueder), general contractor for the project. That action is the subject of the succeeding opinion, Board of Regents v. Lueder Constr. Co., post p. 686, 433 N.W.2d 485 (1988). Much of the evidence in the two cases was the same or similar (indeed, the testimony in this case was incorporated in the Lueder case), but different statutes are involved and separate trials were held, so the two actions will be considered separately.

The record shows that on May 6, 1974, the University and Wilscam entered into a contract in connection with the construction of a new college of pharmacy building at UNMC. The contract required Wilscam to provide design services and, during the construction of the building, to perform periodic site inspections to determine whether the work was proceeding in accordance with the contract documents. The contract also required Wilscam to review and approve shop drawings for conformance with Wilscam’s design concept and for compliance with the contract documents. In 1975, Wilscam hired Rudeen to perform the structural engineering design work for the project. The University retained Lueder as general contractor.

The college of pharmacy building consists of east and west “pods” separated by an atrium. The structural system consists of reinforced concrete floor slabs and structural steel columns. The floor slabs are reinforced with posttension strands and support a brick masonry veneer wall. The building was substantially completed on October 11, 1976, and accepted by the University on that date.

During the year following that completion, University personnel monitored the new building for deficiencies. George Money, director of planning and construction at UNMC, prepared a “punch list” of these items thought to be deficient to be reviewed by Wilscam and Lueder. Money’s department was responsible for the building during 1977 because the building was still subject to Lueder’s 1-year construction warranty. The punch list, dated September 27,1977, refers to several instances *678 of brick cracking in the south wall, a missing mortar joint on the east wall, bricks “broken out” on the north side, and cracking of brick in the west end of the atrium. The deficiencies were set out in the punch list as follows:

24. South wall has a crack at the east end of the west window, starting at the window sill and going up about half the window height, coming up about seven blocks (about half way up).
25. The overhang at the south wall west end. There is a crack that starts in the corner third brick up and then goes to the west up to the eighth brick.
26. Another crack on the south wall west side of the attrium [sic] that is up 18 blocks above the start of square block and over six blocks. Mortar joint missing on the east wall fifth course above the dock head about two blocks west of the television camera.
28. On the north side the brick is broken out the fourth row down from the square brick course on the west end of the atrium. The west end of the atrium up five of the square brick crack starts and goes over half brick and then up the tile over the next joint. Goes on up about eight or nine courses.

Representatives of Wilscam, Lueder, and the University met on the UNMC campus to conduct a 1-year review of the building. They discussed unresolved punch list items, including those listed above. In October 1977, structural engineer Walter Rudeen and Wilscam’s field architect, Frederick Fast, reviewed the brick cracking referred to in the punch list. Rudeen determined that a horizontal crack on the north side had been caused by the deflection of an angle bracket. Neither Wilscam nor Rudeen reported to the University about the several instances of diagonal “stairstep” mortar cracking which had been drawn to Wilscam’s attention during the 1-year review meeting. Wilscam and Rudeen discovered no structural defects in 1977. Wilscam reported the results of Rudeen’s investigation to Money and recommended only that the cracks be patched or caulked to prevent further damage to the walls. Money directed Wilscam to have Lueder examine and repair the cracks.

*679 Although Lueder caulked some of the more accessible cracks (those which did not require scaffolding), it did not complete the building repairs noted in the punch list.

Ralph Yarbrough was director of plant operations from July 1977 to July 1982.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

McCaulley v. C L Enters.
309 Neb. 141 (Nebraska Supreme Court, 2021)
Walz v. Harvey
28 Neb. Ct. App. 7 (Nebraska Court of Appeals, 2020)
Wehrer v. Dynamic Life Therapy & Wellness
302 Neb. 1025 (Nebraska Supreme Court, 2019)
Wehrer v. Dynamic Life Therapy & Wellness, P.C.
302 Neb. 1025 (Nebraska Supreme Court, 2019)
Adams v. Manchester Park
291 Neb. 978 (Nebraska Supreme Court, 2015)
E3 Biofuels, LLC v. Biothane, LLC
6 F. Supp. 3d 993 (D. Nebraska, 2014)
Anonymous v. Vasconcellos
727 N.W.2d 708 (Nebraska Court of Appeals, 2007)
Cooper v. Paap
634 N.W.2d 266 (Nebraska Court of Appeals, 2001)
Gering - Fort Laramie Irrigation District v. Baker
606 N.W.2d 826 (Nebraska Court of Appeals, 2000)
Reinke Manufacturing Co. v. Hayes
590 N.W.2d 380 (Nebraska Supreme Court, 1999)
Jorgensen v. State National Bank & Trust Co.
583 N.W.2d 331 (Nebraska Supreme Court, 1998)
McGinley v. McGinley
583 N.W.2d 77 (Nebraska Court of Appeals, 1998)
Weaver v. Cheung
576 N.W.2d 773 (Nebraska Supreme Court, 1998)
Sass v. Hanson
554 N.W.2d 642 (Nebraska Court of Appeals, 1996)
Zion Wheel Baptist Church v. Herzog
543 N.W.2d 445 (Nebraska Supreme Court, 1996)
Baldwin Carpet Linoleum & Carpet, Inc. v. Builders, Inc.
523 N.W.2d 33 (Nebraska Court of Appeals, 1994)
Lindsay Manufacturing Co. v. Universal Surety Co.
519 N.W.2d 530 (Nebraska Supreme Court, 1994)
Samuel Roberts Noble Foundation, Inc. v. Vick
1992 OK 140 (Supreme Court of Oklahoma, 1992)

Cite This Page — Counsel Stack

Bluebook (online)
433 N.W.2d 478, 230 Neb. 675, 1988 Neb. LEXIS 462, Counsel Stack Legal Research, https://law.counselstack.com/opinion/board-of-regents-of-the-university-of-nebraska-v-wilscam-mullins-birge-neb-1988.