Interconnection authority
16 U.S.C. § 824i
Title16 — Conservation
ChapterSUBCHAPTER II—REGULATION OF ELECTRIC UTILITY COMPANIES ENGAGED IN INTERSTATE COMMERCE
This text of 16 U.S.C. § 824i (Interconnection authority) is published on Counsel Stack Legal Research, covering United States primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.
Bluebook
16 U.S.C. § 824i.
Text
(a)Powers of Commission; application by State regulatory authority
(1)Upon application of any electric utility, Federal power marketing agency, geothermal power producer (including a producer which is not an electric utility), qualifying cogenerator, or qualifying small power producer, the Commission may issue an order requiring—
(A)the physical connection of any cogeneration facility, any small power production facility, or the transmission facilities of any electric utility, with the facilities of such applicant,
(B)such action as may be necessary to make effective any physical connection described in subparagraph (A), which physical connection is ineffective for any reason, such as inadequate size, poor maintenance, or physical unreliability,
(C)such sale or exchange of electric en
Free access — add to your briefcase to read the full text and ask questions with AI
Related
American Paper Institute, Inc. v. American Electric Power Service Corp.
461 U.S. 402 (Supreme Court, 1983)
Greensboro Lumber Co. v. Georgia Power Co.
643 F. Supp. 1345 (N.D. Georgia, 1986)
Western Massachusetts Electric Company v. Federal Energy Regulatory Commission, Pittsfield Generating Company, L.P., and Masspower, Intervenors
165 F.3d 922 (D.C. Circuit, 1999)
Kansas City Power & Light Co. v. State Corp. Commission
715 P.2d 19 (Supreme Court of Kansas, 1986)
Pioneer Trail Wind Farm, LLC v. Federal Energy Regulatory Commission
798 F.3d 603 (Seventh Circuit, 2015)
Southern California Edison Co. v. Public Utilities Commission
18 Cal. Rptr. 3d 435 (California Court of Appeal, 2004)
American Electric Power Service Corp. v. Federal Energy Regulatory Commission
675 F.2d 1226 (D.C. Circuit, 1982)
Modesto Irrigation District v. Pacific Gas & Electric Co.
54 F. App'x 882 (Ninth Circuit, 2002)
Sunflower Electric Cooperative, Inc. v. Kansas Power & Light Co.
603 F.2d 791 (Tenth Circuit, 1979)
Sunflower Electric Cooperative, Inc. v. Kansas Power And Light Company
603 F.2d 791 (Tenth Circuit, 1979)
American Electric Power Service Corporation v. Federal Energy Regulatory Commission
675 F.2d 1226 (D.C. Circuit, 1982)
Carson Hybrid Energy Storage v. Turlock Irrigation District CA5
(California Court of Appeal, 2025)
Legal Authorities Available to the President to Respond to a Severe Energy Supply Interruption or Other Substantial Reduction in Available Petroleum Products
(Office of Legal Counsel, 1982)
Smud v. Bpa
(Ninth Circuit, 2019)
Natl Assn Regu Util v. FERC
(D.C. Circuit, 2007)
Carson Hybrid Energy Storage, LLC v. Turlock Irrigation District
(E.D. California, 2023)
Opinion No. (2004)
(Nebraska Attorney General Reports, 2004)
Source Credit
History
(June 10, 1920, ch. 285, pt. II, §210, as added Pub. L. 95–617, title II, §202, Nov. 9, 1978, 92 Stat. 3135; amended Pub. L. 96–294, title VI, §643(a)(2), June 30, 1980, 94 Stat. 770.)
Editorial Notes
Editorial Notes
Amendments
1980—Subsec. (a)(1). Pub. L. 96–294 added applicability to geothermal power producers.
Statutory Notes and Related Subsidiaries
Study and Report to Congressional Committees on Application of Provisions Relating to Cogeneration, Small Power Production, and Interconnection Authority to Hydroelectric Power Facilities
For provisions requiring the Federal Energy Regulatory Commission to conduct a study and report to Congress on whether the benefits of this section and section 824a–3 of this title should be applied to hydroelectric power facilities utilizing new dams or diversions, within the meaning of section 824a–3(k) of this title, see section 8(d) of Pub. L. 99–495, set out as a note under section 824a–3 of this title.
Amendments
1980—Subsec. (a)(1). Pub. L. 96–294 added applicability to geothermal power producers.
Statutory Notes and Related Subsidiaries
Study and Report to Congressional Committees on Application of Provisions Relating to Cogeneration, Small Power Production, and Interconnection Authority to Hydroelectric Power Facilities
For provisions requiring the Federal Energy Regulatory Commission to conduct a study and report to Congress on whether the benefits of this section and section 824a–3 of this title should be applied to hydroelectric power facilities utilizing new dams or diversions, within the meaning of section 824a–3(k) of this title, see section 8(d) of Pub. L. 99–495, set out as a note under section 824a–3 of this title.
Cite This Page — Counsel Stack
Bluebook (online)
16 U.S.C. § 824i, Counsel Stack Legal Research, https://law.counselstack.com/usc/16/824i.