Kansas Statutes
§ 24-1216 — Order and procedure as to specific projects; surveys, plans, specifications and estimates of costs; filing with secretary of board; open to inspection; transmittal of approved plans to chief engineer, when; review of general plan; revisions of plan; report by chief engineer, requirements
(a)Following the adoption of the general plan and adoption of the method of financing, the board of directors may determine the order in which specific projects contemplated by the general plan shall be undertaken and to cause accurate surveys of all work deemed necessary to be done and accurate estimates and calculations to be made by some competent engineer who shall prepare detailed construction plans and specifications therefor showing the location, amount, and character of work to be done and the estimated cost of right of way, construction, maintenance and operation, which plans, specifications, and estimates of costs shall be filed in the office of the secretary of the board and shall at all reasonable times be open to public inspection. The board shall carefully examine and consid
Free access — add to your briefcase to read the full text and ask questions with AI
Kansas § 24-1216 (Order and procedure as to specific projects; surveys, plans, specifications and estimates of costs; filing with secretary of board; open to inspection; transmittal of approved plans to chief engineer, when; review of general plan; revisions of plan; report by chief engineer, requirements) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.
Related
§ 24-1213
Kansas § 24-1213
Legislative History
L. 1953, ch. 477, § 16; L. 1955, ch. 201, § 10; L. 1958, ch. 12, § 6 (Special Session); L. 1959, ch. 172, § 11; L. 1961, ch. 193, § 14; L. 1987, ch. 122, § 5; July 1.