§ 36-9-27-48 — Construction or reconstruction of drains; relocation of public utility equipment; procedure
(a)Whenever, in the construction or
reconstruction of a regulated drain, the county surveyor determines
that:
(1)the proposed drain will cross a pipeline, cable, or similar
equipment of a public utility; and
(2)the equipment will interfere with the proper operation of the
drain;
the county surveyor shall include in the county surveyor's plans the
relocation requirements of the equipment. The county surveyor shall,
by registered mail or certified mail, send a copy of the requirements to
the public utility owning the equipment.
(b)If requested by the public utility, the county surveyor shall meet
with the public utility at a time and place to be fixed by the county
surveyor and hear objections to the requirements. After the hearing, the
county surveyor may change the requirements as just
Free access — add to your briefcase to read the full text and ask questions with AI
Indiana § 36-9-27-48 (Construction or reconstruction of drains; relocation of public utility equipment; procedure) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.
Related
Panhandle Eastern Pipe Line Co. v. Madison County Drainage Board
898 F. Supp. 1302 (S.D. Indiana, 1995)
Nearby Sections
15
§ 36-1-10-1
Application of chapter§ 36-1-10-10
Plans, specifications, and estimates for structures, systems, and
transportation projects§ 36-1-10-11
Property held in fee simple; sale procedure§ 36-1-10-12
Lease in anticipation of acquisition or construction of structure, system,
or transportation project§ 36-1-10-13
Hearing; procedure; execution of lease§ 36-1-10-17
Annual appropriation and tax levy§ 36-1-10-18
Tax exemption of leased structures, systems, and transportation
projects; taxation of rental paid lessor§ 36-1-10-19
Assignment or conveyance of lease; conveyance of structure, system,
or transportation project§ 36-1-10-2
Definitions§ 36-1-10-20
Repealed