Seeger v. U.S. Dep't of Def.

306 F. Supp. 3d 265
CourtCourt of Appeals for the D.C. Circuit
DecidedMarch 30, 2018
DocketCivil Action No. 17–639 (RMC)
StatusPublished
Cited by7 cases

This text of 306 F. Supp. 3d 265 (Seeger v. U.S. Dep't of Def.) is published on Counsel Stack Legal Research, covering Court of Appeals for the D.C. Circuit primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Seeger v. U.S. Dep't of Def., 306 F. Supp. 3d 265 (D.C. Cir. 2018).

Opinion

ROSEMARY M. COLLYER, United States District Judge

Major Matthew Seeger of the United States Army, Michael Schwartz, Cheryl Bormann, and Edwin Perry are lawyers employed by the United States Department of Defense (DoD) who represent detainees before a military commission at U.S. Naval Station Guantanamo Bay, Cuba (NSGB). They bring this action under the Administrative Procedure Act (APA), 5 U.S.C. §§ 500 et seq (2012). They allege that DoD, the U.S. Navy, and the Director of the Office of Military Commissions and Convening Authority have failed to investigate adequately environmental hazards, including airborne formaldehyde and other carcinogens, present at Camp Justice, where Plaintiffs are assigned to work and in some cases sleep while at Guantanamo Bay. They further allege that Navy's investigation *270into these alleged hazards was incomplete and flawed, rendering arbitrary and capricious DoD's conclusions that Plaintiffs can continue safely to live and work at Camp Justice. Plaintiffs ask the Court to require further investigation of the alleged hazard mitigation, as well as alternative living and working facilities until that is done, for which they seek a preliminary injunction until this litigation concludes.

Because the issuance of a Final Report, which is now public, renders Plaintiffs' complaint of unreasonable delay moot, the Court will dismiss Counts Two and Three. However, because Defendants' orders that Plaintiffs live and work in the allegedly contaminated areas are final actions subject to review under the APA, the Court will deny Defendants' Motion to Dismiss Count One. Plaintiffs' Motion for a Preliminary Injunction will be denied because Plaintiffs have not adequately demonstrated that they are likely to succeed on the merits or that they are likely to suffer irreparable harm if a preliminary injunction is not granted.

I. BACKGROUND

A. Camp Justice and Potential Environmental Hazards

Camp Justice is a complex at NSGB that was built in 2007 on the site of a former airfield. It serves as the location of the Office of Military Commissions Office of the Convening Authority (OMC). See Compl. ¶ 19 [Dkt. 1].1 Within Camp Justice is a fenced area called the Expeditionary Legal Complex (ELC) which includes a Secure Compartmented Information Facility (SCIF), at which most of the intensive work of the OMC occurs due to the classified nature of the underlying information. The ELC is comprised of several structures: a sheet metal structure (ELC-1) that contains a courtroom and office areas; three trailers (ELC-3, ELC-4, ELC-5) that function as office spaces; and three CONEX shipping containers (ELC-8, ELC-9, ELC-10). See Ex. 17, Motion for Preliminary Injunction, Indoor Air Quality Assessment Report [Dkt. 4-19] at 1-4. Camp Justice includes three additional workspaces outside the ELC: Buildings AV-29 and AV-34, which are fixed structures, and AV-32, a former hangar. See id. at 1-3. Most of Plaintiffs' work is done in the SCIF, which is inside prefabricated structures that Plaintiffs allege to be contaminated. See Tr. of Prelim. Inj. Hr'g (PI Tr.) [Dkt. 30] at 18 (testimony of Major Seeger regarding structures of ELC). Plaintiffs also have dedicated office space in AV-34, outside the ELC, but that is a less convenient space, and Plaintiffs use it less frequently than spaces within the ELC, because classified documentation cannot be taken outside the SCIF. Id.

Personnel housing units under OMC's direct control within Camp Justice are primarily located in Containerized Housing Units, also known as CHUs or "Cuzcos." Fifty of the Cuzcos provide housing; they are air-conditioned trailers, each with two single bedrooms and a shared bathroom, comprising 100 beds total. OMC can also house personnel in 360 beds in air-conditioned tents with plywood floors. Of these, 60 beds are in "improved" tents with partitions and the other 300 are cots rather *271than beds. Both the Cuzcos and the tents are located on what used to be an aircraft runway called McCalla Field, made of asphalt. OMC also rents four nearby transient-housing townhomes from the NSGB Commanding Officer, two each for prosecution and defense trial teams (predominately used during trial). Other convenient on-base housing options include 202 beds managed by Navy Gateway Inns & Suites (NGIS), as well rooms at the Navy Lodge. See Defs.' Opp'n to Pls.' Appl. for a Prelim. Inj. and Mot. to Dismiss (Mot. to Dismiss) [Dkt. 10] at 8-10 (describing the on-base housing options). While some Plaintiffs have stayed in these facilities during work trips, availability is not guaranteed and demand can sometimes outstrip capacity.

In addition, OMC can use 53 beds, to the extent they are available, in Building AV-624, a permanent structure on the opposite, or leeward, side of Guantanamo Bay, that is, the physical water inlet for which the Naval Station is named, from the ELC. Transportation to AV-624 is relatively inconvenient, because access is by ferry only and takes approximately 25 minutes. Plaintiffs argue that their ability to work would be severely hindered if they were forced to stay on the leeward side of the bay, in particular because much of their work must be done in or near the SCIF, and ferry service is limited. See PI Tr. at 32 (Plaintiffs' counsel arguing that "[i]t's not the New York Subway. So for folks who are working very long days, it cuts down on the amount of time they can work while they're there.").

OMC's Housing Policy, issued on May 19, 2011, requires "all OMC personnel" and contractors to stay in the Cuzcos or tents at Camp Justice. See Mot. to Dismiss at 9. Although the lead counsel representing detainees who are charged with capital crimes are considered contractors, they are exempt from the requirement that they stay in the Cuzcos or tents, under an exception in the policy that permits members of prosecution and defense trial teams to stay in the four townhouses. Id. Other limited exceptions have been made on a case-by-case basis and "in an ad hoc manner based upon requests," including requests from the Military Commissions Defense Organization for trial team members to stay in other NSGB housing when available. Id.2 Members of trial teams who are also enlisted military are not eligible for these exceptions. In practice, Ms. Bormann, Mr. Schwartz, and Mr. Perry have stayed in preferred "hard housing," such as the Navy Lodge, for all or most of their trips to NSGB since 2014; Major Seeger, as an Army officer, is always required to stay in the Cuzcos. PI Tr. at 44-47.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Plummer v. Gallaudet University
District of Columbia, 2026
Kingdom v. Trump
District of Columbia, 2025
Bailey v. Federal Bureau of Prisons
District of Columbia, 2025
Collier v. Kendall
District of Columbia, 2023
County of San Diego v. Nielsen
S.D. California, 2020

Cite This Page — Counsel Stack

Bluebook (online)
306 F. Supp. 3d 265, Counsel Stack Legal Research, https://law.counselstack.com/opinion/seeger-v-us-dept-of-def-cadc-2018.