FERRISS, J.

— Appeal from a judgment of the circuit court of Jackson county sustaining a demurrer to the petition filed by plaintiff charging negligence resulting in personal injuries. The petition was filed on the 15th day of July, 1905, and covers nearly thirty printed pages. The suit was filed against Kansas City and Robert J. Boyd Paving & Construction Company, but subsequently dismissed as to the Construction Company.

It appears from the petition that on the 13th day of May, 1901, Kansas City entered into a contract with the Construction Company for constructing a district sewer in said city by said company. In the course of the ensuing work plaintiff was employed by the Construction Company as a common laborer, and was engaged in drilling holes for blasting rock which was encountered in the work of excavation. The petition charges that the method of preparing the blasts was as follows: The drillers, of whom plaintiff was one, would drill a series of holes about two feet apart, after which such holes would be loaded with giant powder o.r-dynamite by one Kelleher, foreman, and one Moriarity, designated as the powder man, employees of the Construction Company, who would then shoot said holes by means of fuses; that it was usual and customary to count the number of holes in a given series before exploding same, then count the explosions to see whether they corresponded with the number of holes, and afterwards to inspect and examine the holes so exploded for missed shots; that the plaintiff and his gang had nothing to do with the loading or exploding of the holes, nor with the subsequent inspection, but that after the holes had been exploded and inspected plain[22]*22tiff and Ms gang would be ordered to drill another series of holes; that on the afternoon of Saturday, July 13, 1901, a series of holes which had been drilled by plaintiff were attempted to be exploded by the said foreman and powder man; that on the following Monday plaintiff and his gang were ordered by foreman Kelleher to go back to the place where such series of holes had been exploded to drill a new series; that one hole of the former series remained unexploded, and that while at work drilling the new series a driller who was working near plaintiff caused said unexploded shot to be exploded with such force and violence as to seriously injure the plaintiff.

The plaintiff makes the proper averments to negative any contributory negligence on Ms part.

There seems to have been no controversy as to the liability of the Construction Company for the negligence of its superintendent. The real controversy in the case is whether Kansas City is liable. The petition proceeds upon the theory that because of the power of control reserved in the contract to the city’s engineer, the Construction Company was not an independent contractor, and, hence, the city is liable. In stating below the substance of the petition, we adopt the italics as they appear in the abstract filed by plaintiff. We do not apprehend that these italics appear in the original contract, but use them because they indicate the parts of the contract on which the plaintiff particularly relies.

Plaintiff alleges that the city ordered the construction of the sewer; sets out certain ordinances of the city which provide for the appointment of a city engineer whose duty it should be “to supervise the construction of public and district sewers;” also to prepare plans, specifications and estimates of the cost of all public and district sewers ordered by the council; to report to the board of public works all violations of 'any contract; to sign all contracts on behalf of the [23]*23city for public improvements, and to superintend their execution. The petition sets out section 883 of the Revised Ordinances of Kansas City for 1898, as follows:

“Permit for Blasting: — No person shall do or cause to be done any blasting within the city limits without first obtaining from the city engineer a permit therefor, which shall be issued only on condition that the city engineer is satisfied that the applicant is in every particular 'a safe, careful and suitable person to use, and an expert in the use of, all explosives used in blasting, but no permit shall, under any circumistamces, be issued to any one until the applicant therefor has entered into a bond to Kansas City in the sum of not less than one hundred dollars or more than ten thousand dollars, as the city engineer may require, with at least two securities, to be approved by the city comptroller, conditioned that such person will carefully and prudently use such explosive, and will pay any and all damages caused any person by the use-thereof. And any person can sue on such bond in his own name for any damage caused him by the use of. such explosive.”

The petition sets out in haec verba the contract between the city and the Construction Company. This contract is extremely lengthy, is in the usual form of municipal contracts for public works, giving specifications as to the character of the work to be done, materials to be used, all under the supervision of the city engineer. The contract provides that the party of the first part (the Construction Company), having made the lowest bid, agrees to complete the work in a substantial and workmanlike manner, “in conformity with the plans of such work on file in the office of the city engineer of Kansas City, in strict obedience to the directions which may from time to time be given by said city engineer or his authorized agents, in accordance with the following specifications.” The specifica[24]*24tions provide: “The contractor shall not blast any rock or allow the same to be done on this work without taking such precautions by covering or otherwise as shall prevent damage or injury to person or property;” that streets and alleys shall be restored “to the satisfaction of the engineer ” surplus earth to be removed to such distance “as may be designated by the engineer;” the foundations of the sewer to be either of broken stone, plank, concrete or masonry, as shall be “ordered by the city engineer;” the location of manholes and catch basins to be changed, or omitted altogether, “if deemed best by the city engineer;” no broken bricks to be allowed, “except for closures, or as shall be otherwise specially directed.” Then follows a specification as to the character of cement to be used, providing certain tests to be conformed to, “except in such portions of the work as the city engineer may othenvise direct.” The character of the concrete is specified, also the manner of preparing it, “unless othenuise ordered by the city engineer;” house connections to be worked into the brick work “in-such mannér as the engineer may direct;” the masonry work to be suspended during the freezing weather, “but the city engineer shall have the right to direct that the work shall be continued under such conditions as he shall prescribe;” also that during a suspension of the work from any cause, the same shall be suitably covered and the trenches filled “if the engineer so directs;” the syphon trap used to be satisfactory “in the opinion of the city engineer.” Then follows a' specification as to maintenance; the sunken trenches to be immediately filled, and if on'a paved street, the pavement to be repaired by the contractor at his expense, “on receipt of notice from the city engineer so to do;” that if the contractor fails to comply with said

Free access — add to your briefcase to read the full text and ask questions with AI

Related

LUCAS HOLTERMAN v. LAVERNE COPELAND
Missouri Court of Appeals, 2024
Lawrence v. Bainbridge Apartments
957 S.W.2d 400 (Missouri Court of Appeals, 1997)
Gillespie v. St. Joseph Light & Power Co.
937 S.W.2d 373 (Missouri Court of Appeals, 1996)
State v. City of Baltimore
86 A.2d 618 (Court of Appeals of Maryland, 1993)
Prayson v. Kansas City Power & Light Co.
847 S.W.2d 852 (Missouri Court of Appeals, 1992)
Halmick v. SBC Corporate Services, Inc.
832 S.W.2d 925 (Missouri Court of Appeals, 1992)
Zueck v. Oppenheimer Gateway Properties, Inc.
809 S.W.2d 384 (Supreme Court of Missouri, 1991)
Mays v. Penzel Construction Co.
801 S.W.2d 350 (Missouri Court of Appeals, 1990)
White v. Chrysler Corp.
364 N.W.2d 619 (Michigan Supreme Court, 1985)
Counts v. Morrison-Knudsen, Inc.
663 S.W.2d 357 (Missouri Court of Appeals, 1983)
United States Court of Appeals, Eighth Circuit
568 F.2d 570 (Eighth Circuit, 1978)
Pritchett v. Kimberling Cove, Inc.
568 F.2d 570 (Eighth Circuit, 1977)
Coleman v. Silverberg Plumbing Co.
263 Cal. App. 2d 74 (California Court of Appeal, 1968)
Hagberg v. City of Sioux Falls
281 F. Supp. 460 (D. South Dakota, 1968)
Lipka v. United States
369 F.2d 288 (Second Circuit, 1966)
Schultz & Lindsay Construction Company v. Erickson
352 F.2d 425 (Eighth Circuit, 1965)
Schultz & Lindsay Construction Co. v. Erickson
352 F.2d 425 (Eighth Circuit, 1965)
Boulch v. John B. Gutmann Construction Company
366 S.W.2d 21 (Missouri Court of Appeals, 1963)

Cite This Page — Counsel Stack

Bluebook (online)
145 S.W. 16, 241 Mo. 14, 1912 Mo. LEXIS 271, Counsel Stack Legal Research, https://law.counselstack.com/opinion/salmon-v-kansas-city-mo-1912.