Ramirez v. Toko Kaiun K.K.

385 F. Supp. 644, 40 Cal. Comp. Cases 830, 1974 U.S. Dist. LEXIS 11933, 1975 A.M.C. 85
CourtDistrict Court, N.D. California
DecidedNovember 21, 1974
DocketC-73-2272 WHO
StatusPublished
Cited by44 cases

This text of 385 F. Supp. 644 (Ramirez v. Toko Kaiun K.K.) is published on Counsel Stack Legal Research, covering District Court, N.D. California primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Ramirez v. Toko Kaiun K.K., 385 F. Supp. 644, 40 Cal. Comp. Cases 830, 1974 U.S. Dist. LEXIS 11933, 1975 A.M.C. 85 (N.D. Cal. 1974).

Opinion

MEMORANDUM OPINION AND ORDER

ORRICK, District Judge.

This ease presents for the first time in this Circuit the effect of the 1972 Amendments 1 (which became effective November 26, 1972, and are hereinafter called the “Amendments”) to the Longshoremen’s and Harbor Workers’ Compensation Act 2 (the “Act”) upon the standard of care owed to longshoremen employed by an independent stevedore *646 contractor doing work upon a vessel owned by a third party. This Court has jurisdiction pursuant to 28 U.S.C. § 1333 and The General Maritime Law.

For the reasons hereinafter discussed, I hold that under the Amendments the defendant ship owner owes to the plaintiffs longshoremen the same standard of care that a land-based owner of a premises owes to a business invitee (See Restatement (Second) of Torts § 343A (1965)). In this instance, the ship owner must (1) exercise ordinary care to place the ship and equipment in such condition that an experienced stevedore will be able, when exercising ordinary care, to discharge the cargo in a workmanlike manner and with reasonable safety to persons and property, and (2) give the stevedore warning of any concealed or latent defects that are known by the shipowner. 3 This standard will be applied to the following facts:

I. FACTS

On May 9, 1973, the M. S. Toten Maru, a cargo ship owned by defendant, Toko Kaiun K.K., docked at the 9th Avenue Pier in Oakland, California. On that day the cargo, primarily steel pipe, was inspected by an independent cargo appraiser, and the cargo was certified to have been safely stowed. The unloading operations were turned over to Marine Terminals Corporation (“Marine Terminals”), an independent stevedore contractor who is not a party to this action. 4 Marine Terminals assumed complete control of the unloading; there is no evidence that any member of the crew or other employee of Toko Kaiun K.K. was in any way involved in the operation.

A. Method of Unloading

Stevedoring “gangs” from Marine Terminals commenced unloading the night of May 9, but on the morning of May 10 the operation was not yet completed. On that morning plaintiffs, Ramirez and Guerrero, both “A-men”, experienced longshoremen, reported for work at Marine Terminals and were assigned to the “gang” who were to work the No. 3 hatch. This gang consisted of six men, including Ramirez, Guerrero, and the two less-experienced “B-men”, to work in the hold. In addition to the “hold men”, the gang was assigned a “hoist man” who worked the crane-like boom and winches, and a “hatch tender” whose job it was to relay signals between the men in the hold and the hoist operator, as these men could not see each other. There was also a “gang boss” who supervised the work of the gang to see that they were working properly and safely. This gang boss was supervised by a “walking boss”, who, in turn, was responsible to the “cargo superintendent.” All members of the gang, as well as the gang boss, walking boss and cargo superintendent, were employed by Marine Terminals.

Before the gang began working that morning, the gang boss made a further inspection of the hold. He described the hold as large, approximately 40 feet by 30 feet, and open, allowing good illumination of the cargo all day. The cargo consisted of two large piles of pipe, some to be unloaded for the San Francisco area and some that was destined for Los Angeles that was to remain with the ship. At the time of his inspection, the pile to be unloaded in Oakland was not level due, among other things, to the fact that previous gangs had already unloaded a portion of the pile in a manner that left it uneven. The pipes were not all of the same type. Most of the pipes were loose, although some were in bundles. The evidence was not clear as to the exact size of the pipes, but it appears that there were *647 several different diameters from 1 to 8 inches mixed together, and the lengths were between 20 and 40 feet. All of the pipe was coated with oil to prevent rust, making them slippery and hard to handle. The pipe was loaded in a manner known as a “solid block stow”, that is, there were no layers separated with wooden blocks or dunnage that would make the unloading easier. The ends of the pipe were not even; the pipe was stowed so that some of the ends protruded further than others. These conditions continued unchanged throughout the unloading that day, and no new hazards were uncovered as the men worked down through the pile. The men complained to the gang boss about these conditions, and this complaint was forwarded to the walking boss and cargo superintendent. The men were told to do the best they could, and no adjustments were made, nor were any complaints made to any member of the ship’s crew.

The method chosen by Marine Terminals to unload the Toten Maru required the use of the ship’s winches, boom and main cable. This equipment functioned normally throughout the procedure. The end of the ship’s cable contained a large spherical swivel to which earlier Marine Terminals’ employees had attached the rigging, or “bridle”, used to unload the pipes. All of the bridles, cables, wire and hooks used to attach the pipes to the line of the hoist were supplied and attached by Marine Terminals. The basic arrangement consisted of four large cables each attached at one end to the swivel and at the other end to one of four hooks. This bridle was suspended from the hoist with the four hooks dangling, and was raised, lowered and moved from side to side by the hoist man in response to signals from the men in the hold.

The men in the hold were required to work on top of the pile of pipes to be unloaded. Ramirez and Guerrero had to kneel near the edge of the pipes and thread a y2 inch cable about 10 feet long, called the “pick-up wire”, under the ends of the pipes about 2 feet down the stack. The ends of this pick-up wire were then attached to two of the four hooks on the bridle. When the pick-up wire was secure, Ramirez signaled to the “hatch man” who relayed the signal to the hoist man, and the ends of the pipes were raised about three feet. The pipes then had one end suspended by the pick-up wire and the other resting on the pile. The purpose was to separate a bundle of pipes approximately three feet in diameter from the pile long enough for Ramirez and Guerrero to whip two larger cables between the pipes now raised at an angle and the rest of the pile. Ramirez and Guerrero would then hand one of these cables to the B-men to put in place as far down toward the low end as possible. After the B-men had positioned their cable, Ramirez and Guerrero would then place the other cable in a corresponding position under the high end of the pipes. When the two cables were in position, Ramirez would signal the hatch tender, and the pipes were lowered onto these cables. The pick-up wire was then removed and the main cables were attached to the four hooks of the bridle. Another signal was given and the pipes were raised up and out of the hold.

B. The Accident

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Stanley v. Western Maryland Railway Co.
482 A.2d 881 (Court of Appeals of Maryland, 1984)
Roger Johnson v. A/s Ivarans Rederi
613 F.2d 334 (First Circuit, 1980)
Prohoroff v. Kawasaki Kisen Kaisha, Ltd.
90 Cal. App. 3d 640 (California Court of Appeal, 1979)
Johnson v. Moore-McCormack Lines, Inc.
460 F. Supp. 1195 (D. Maryland, 1978)
Canizzo v. Farrell Lines, Inc.
579 F.2d 682 (Second Circuit, 1978)
Keith v. S. S. Goldstone
81 Cal. App. 3d 699 (California Court of Appeal, 1978)
Lemon v. Bank Lines, Ltd.
449 F. Supp. 1016 (S.D. Georgia, 1978)
Wright v. Adonis Compania Naviera, S.A.
376 N.E.2d 4 (Appellate Court of Illinois, 1978)
Kalogeros v. Brasileiro
446 F. Supp. 175 (S.D. New York, 1978)
Mario Lubrano v. Royal Netherlands Steamship Company
572 F.2d 364 (Second Circuit, 1978)
Espinoza v. United States Lines, Inc.
444 F. Supp. 405 (S.D. New York, 1978)
Davis v. Inca Compania Naviera S.A.
440 F. Supp. 448 (W.D. Washington, 1977)
Baysal D. Riddle v. Exxon Transportation Company
563 F.2d 1103 (Fourth Circuit, 1977)
Shepler v. Weyerhaeuser Co.
569 P.2d 1040 (Oregon Supreme Court, 1977)
Peter Ruffino v. Scindia Steam Navigation Co., Ltd.
559 F.2d 861 (Second Circuit, 1977)
Darwin v. United States
435 F. Supp. 501 (N.D. California, 1977)

Cite This Page — Counsel Stack

Bluebook (online)
385 F. Supp. 644, 40 Cal. Comp. Cases 830, 1974 U.S. Dist. LEXIS 11933, 1975 A.M.C. 85, Counsel Stack Legal Research, https://law.counselstack.com/opinion/ramirez-v-toko-kaiun-kk-cand-1974.