Pogge v. Fullerton Lumber Co.

277 N.W.2d 916, 1979 Iowa Sup. LEXIS 920
CourtSupreme Court of Iowa
DecidedApril 25, 1979
Docket60788
StatusPublished
Cited by46 cases

This text of 277 N.W.2d 916 (Pogge v. Fullerton Lumber Co.) is published on Counsel Stack Legal Research, covering Supreme Court of Iowa primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Pogge v. Fullerton Lumber Co., 277 N.W.2d 916, 1979 Iowa Sup. LEXIS 920 (iowa 1979).

Opinion

REYNOLDSON, Chief Justice.

Following jury trial, judgment for plaintiffs John and Loraine Pogge was rendered against defendant Fullerton Lumber Co. for compensatory and exemplary damages resulting from breach of a contract for construction of a house. We reverse and remand for new trial.

There was substantial evidence from which the jury could have found the following facts.

Under a written contract dated May 21, 1973, Fullerton agreed to construct a residence for Pogges, who were to pay $20,-363.24. Fullerton built the house and Pogg-es took possession in September, 1973.

The construction did not comply with the contract in several particulars. Two-by-eight floor joists were used instead of two-by-ten. The contract specified redwood exterior trim, oak doorsills, and 3Va-inch insulation. Fullerton provided pine trim and doorsills and used only 2V4-inch insulation in the sidewalls. Kitchen counters were improperly installed. The garage was improperly braced and connected to the house. Drainage beds from the septic tank were poorly constructed. Windows and doors were not watertight. Siding was improperly applied.

July 14, 1975, Pogges filed a law action for damages for breach of contract. By amendment Pogges alleged defendant “knowing and willfully violated the contract with intent to damage the Plaintiffs herein. Therefore, in addition to the actual damages already alleged, Plaintiffs are entitled to an award of exemplary damages By subsequent amendments Pogges ultimately demanded $46,900 actual damages and $75,000 exemplary damages.

The jury awarded Pogges $5400 in actual damages and $28,000 in exemplary damages.

In this appeal Fullerton raises three issues which we treat in the following divisions.

I. Did plaintiffs furnish an adequate evidentiary basis to justify submission of compensatory damages to the jury ?

Trial court’s instruction on compensatory damages relevantly provided:

[Y]ou can only allow damages, if any, as are shown by a preponderance of the evidence. You cannot allow more than the lesser of: (1) the difference between the fair and reasonable value of the premises at the time of delivery of possession in September, 1973, and its fair and reasonable value at that time had the house been constructed in accordance with the contract; or (2) the fair and reasonable cost of labor and materials required in September, 1973, to correct or repair any defects or omissions, if there were any, so that the Plaintiffs would have received a house which was constructed in accordance with the terms of the contract.
Under the evidence an award of actual damages cannot exceed $26,000 and it may be a lesser amount or none.

Fullerton objected to the instruction on the ground there was no evidence to show value of the house as actually constructed and therefore nothing on which to calculate the diminished value of the home. After carefully examining the transcript, we are convinced the objection should have been sustained.

Pogges’ expert witness on construction testified that to “gut” the house to replace the insulation and joists and make other corrections would cost $46,592 at time of trial (less of course in 1973), but that it would be cheaper to build a new house. Another expert valuation witness placed the 1973 value of the house, if constructed in compliance with the contract, at $26,000. *918 He did not place a 1973 value on the house as actually built, but volunteered that as a lending institution appraiser he would have rejected it for loan purposes. Neither Pogges nor any one else gave an opinion on the actual 1973 value of the house as constructed. Other evidence disclosed the home was carried on the tax rolls at a market value of $33,000, and Pogges did not object until the value was raised to $50,420 as of January 1, 1977.

A colloquy between counsel and the court when the above objection was under discussion discloses the court had arrived at a maximum of $26,000 in actual damages on the basis of the value of the house had it been built in conformance with the contract. Trial court remarked the expert valuation witness had testified that as actually constructed the house “in all practical purposes has no value other than salvage; and by inference, salvage would be minimal.” But the only reference the witness made to salvage was elicited by leading question and was stricken by the court upon proper objection.

In this case the parties apparently agreed to the basic formula for ascertaining damages contained in the above instruction. But there was no agreement to submit the formula even though evidence essential to its application was lacking. On use of the “reduction in value” rule vis-a-vis the “cost” rule and the effect of unreasonable economic waste in reconstruction, see Busker v. Sokolowski, 203 N.W.2d 301, 303-04 (Iowa 1972), and citations, and J. Calamari & J. Perillo, The Law of Contracts § 230, at 362-63 (1970).

Fullerton’s objection to this instruction should have been sustained. Although this error alone requires a new trial, the remaining issues Fullerton raises are treated because they may recur.

II. In this action for breach of contract should the issues of punitive damages have been submitted to the jury ?

Fullerton asserts that as a matter of law and pleading, punitive damages do not belong in this case and should not have been submitted to the jury. It argues breach of contract does not give rise to punitive damages without proof of independent tortious conduct. Fullerton also contends Pogges were required to plead malice as required by Iowa R.Civ.P. 96.

Pogges argue that
not only was there fraud in the performance of the contract, but also there was such a “high-handed disregard of duty” on the part of Fullerton that this case is a classic example of the type of contractual breach for which the additional deterrent of punitive damages is deemed necessary under the law.

Pogges rely on testimony of a former Fullerton employee that the floor joists and other substitutions of materials were made at the direction of a former yard manager and such substitutions had occurred in other projects.

Trial court submitted punitive damages to the jury. Instruction 18 provided in part:

You are instructed that the law of this State permits but does not require a jury to allow exemplary damages in certain cases if it is found by the jury that the act of the Defendant causing the injury complained of is intentional or is wanton and reckless. By wanton and reckless, as these terms are used in this case, is meant something more than negligence, but is meant that an act is done in such a manner and under such circumstances as to show heedlessness and an utter disregard and abandon as to what result may flow from the doing of an act or from the manner in which it is done.

Fullerton objected to this instruction on the ground that the evidence disclosed only a breach of contract, which “is always an intentional act by nature, and does not give rise to punitive damages.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Feller v. Hartford Life & Accident Insurance
817 F. Supp. 2d 1097 (S.D. Iowa, 2010)
NCMIC Finance Corporation v. Artino
638 F. Supp. 2d 1042 (S.D. Iowa, 2009)
Varboncoeur v. State Farm Fire & Casualty Co.
356 F. Supp. 2d 935 (S.D. Iowa, 2005)
Asa-Brandt, Inc. v. ADM Investor Services, Inc.
344 F.3d 738 (Eighth Circuit, 2003)
BBSERCO v. Green Bay Dressed
Eighth Circuit, 2003
Grynberg v. Citation Oil & Gas Corp.
1997 SD 121 (South Dakota Supreme Court, 1997)
Hockenberg Equip. v. HOCKENBERG'S E. & S.
510 N.W.2d 153 (Supreme Court of Iowa, 1993)
Maugh v. Chrysler Corp.
818 S.W.2d 658 (Missouri Court of Appeals, 1991)
Peterson v. Continental Boiler Works, Inc.
783 S.W.2d 896 (Supreme Court of Missouri, 1990)
Woods v. Schmitt
439 N.W.2d 855 (Supreme Court of Iowa, 1989)

Cite This Page — Counsel Stack

Bluebook (online)
277 N.W.2d 916, 1979 Iowa Sup. LEXIS 920, Counsel Stack Legal Research, https://law.counselstack.com/opinion/pogge-v-fullerton-lumber-co-iowa-1979.