Onsen v. Commonwealth Edison Co.

634 N.E.2d 1113, 261 Ill. App. 3d 271, 199 Ill. Dec. 759
CourtAppellate Court of Illinois
DecidedMay 24, 1994
Docket3-93-0490
StatusPublished
Cited by5 cases

This text of 634 N.E.2d 1113 (Onsen v. Commonwealth Edison Co.) is published on Counsel Stack Legal Research, covering Appellate Court of Illinois primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Onsen v. Commonwealth Edison Co., 634 N.E.2d 1113, 261 Ill. App. 3d 271, 199 Ill. Dec. 759 (Ill. Ct. App. 1994).

Opinion

JUSTICE LYTTON

delivered the opinion of the court:

This appeal presents the issue of whether an employer’s failure to provide a hoist for the purpose of removing materials from a work site can provide the basis for a claim under the Structural Work Act (Act) (740 ILCS 150/0.01 et seq. (West 1992)). For reasons stated below, we find that it does and reverse the trial court’s entry of summary judgment dismissing plaintiffs complaint and remand for further proceedings.

Plaintiff, David Onsen, was employed as a laborer for Morrison Construction Company. On March 26, 1988, Onsen was working on the renovation of the unit two nuclear reactor at the La Salle Nuclear Power Station of defendant, Commonwealth Edison. Onsen was engaged in the removal of snubbers, which are large pipes, 12 feet long, containing coil springs and weighing approximately 300 pounds. Onsen was familiar with the procedure for removing the snubbers, as he had removed around 30 of them at the site prior to this occurrence.

The snubber at issue was situated about two feet off the ground. Onsen and a co-worker unbolted the mountings located on the ends of the snubber and lowered it to the ground. Onsen intended to move the snubber to another location in the facility with the assistance of his co-worker. Because of congestion caused by pipes and other items in the work area, Onsen asked the foreman if the items could be moved out of the way so that they could get a hoist in to move the snubber. The foreman consulted one of defendant’s employees who responded that the items would not be removed. The foreman instructed Onsen to go ahead and move the snubber as best they could. Onsen and his co-worker intended to attach nylon straps to the snubber to transport it out of the drywell area. As Onsen picked up one end of the snubber in order to slip the nylon strap around it, he felt a "pop” in his back, which was later diagnosed as a "central herniated lumbar intervertebral disc” injury.

Onsen filed a one-count complaint against defendant based on the Act. The trial court granted defendant’s motion for summary judgment (735 ILCS 5/2—1005(c) (West 1992)) and Onsen appeals.

Onsen argues that the trial court erred in granting defendant’s motion for summary judgment because the Act was designed to provide a cause of action for workers injured when engaged in an ultrahazardous activity where the party in charge of and in control of the work failed to provide a device enumerated in the Act. Onsen was working in a nuclear power plant and was required to wear protective clothing; he was engaged in an ultrahazardous activity under the control of defendant. He alleges that he was injured as a result of defendant’s failure to provide a hoist, an enumerated device under the Act.

Defendant responds that Onsen’s activity was not covered under the Act, that the mere lifting of an object has no connection to the hazards posed by the device.

In order for a trial court to grant a motion for summary judgment, the pleadings, depositions and affidavits must show that there is no genuine issue of material fact. (735 ILCS 5/2—1005(c) (West 1992).) Summary judgment is proper when the parties agree upon the facts, but dispute the correct construction of the Act and whether the facts sustain a cause of action. (American National Bank & Trust Co. v. National Advertisement Co. (1992), 149 Ill. 2d 14, 22, 594 N.E.2d 313.) Whether the Act covers the plaintiff’s injuries is a matter of statutory construction and therefore a question of law for the court. (American National Bank, 149 Ill. 2d at 22.) When an appeal is taken from a summary judgment order, our standard of review is de novo. Myers v. Health Specialists, S.C. (1992), 225 Ill. App. 3d 68, 72, 587 N.E.2d 494, appeal denied (1992), 145 Ill. 2d 635.

The Structural Work Act provides, in relevant part, as follows:

“All *** hoists *** erected or constructed by any person, firm or corporation in this State for the use in *** repairing *** of any *** building *** or other structure, shall be erected and constructed, in a safe, suitable and proper manner, and shall be so erected and constructed, placed and operated as to give proper and adequate protection to the life and limb of any person or persons ***.” (740 ILCS 150/1 (West 1992).)

In addition, section 9 of the Act provides that any person injured as a result of a wilful violation of the Act is given a right of action for damages. 740 ILCS 150/9 (West 1992).

It is well established that the failure to provide an enumerated device under the Act is actionable and that the Act is to be liberally construed. (Louis v. Barenfanger (1968), 39 Ill. 2d 445, 236 N.E.2d 724; Urman v. Walter (1981), 101 Ill. App. 3d 1085, 428 N.E.2d 1051.) The failure to provide a hoist in conjunction with certain construction activities may be a violation of the Act. McNellis v. Combustion Engineering, Inc. (1973), 13 Ill. App. 3d 733, 301 N.E.2d 91, aff’d (1974), 58 Ill. 2d 146, 317 N.E.2d 573.

In McNellis, plaintiff sustained fatal injuries while unloading component parts of a steam generator from a railroad car. The parts weighed over 20,000 pounds and were attached to the railroad car by tie rods as well as scrap steel welded to the parts and the car. Two cranes were at the work site and were available for use in the project, but the workers and the foreman decided not to use them. While plaintiff and a co-worker were engaged in cutting loose supports of the parts, one of the parts fell, pinning plaintiff to the side of the car. The workers used one of the cranes to lift the part and remove plaintiff, who later died from his injuries.

Plaintiff alleged, in part, that defendants’ failure to utilize the cranes at the work site was a violation of the Structural Work Act (Ill. Rev. Stat. 1969, ch. 48, par. 60 et seq.). The trial court found that the activity at issue was covered by the Act, and the appellate court agreed.

The Illinois Supreme Court affirmed. (McNellis, 58 Ill. 2d 146.) The court noted that there was testimony that a crane should have been used to hold the parts in place while the workers cut the tie rods and scrap steel supports. The court found that the unloading of the parts was an integral part of the erection operation.

In light of McNellis, we believe that Onsen’s activity is covered under the Act. Here, Onsen was engaged in the removal of a 300-pound snubber for the renovation of one of defendant’s nuclear power plants. Onsen asked that defendant remove materials from the work area in order that a hoist could be used to remove the snubber.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Concrete Structures/Sachi, J.V. v. Clark/Bulley/OVC/Power
2024 IL App (1st) 240082 (Appellate Court of Illinois, 2024)
Concrete Structures v. Clark
2023 IL App (1st) 230015-U (Appellate Court of Illinois, 2023)
People ex rel. Weber v. Commonwealth Edison Co.
Appellate Court of Illinois, 1997
Hesselink v. R.L. Perlow Corp.
637 N.E.2d 575 (Appellate Court of Illinois, 1994)

Cite This Page — Counsel Stack

Bluebook (online)
634 N.E.2d 1113, 261 Ill. App. 3d 271, 199 Ill. Dec. 759, Counsel Stack Legal Research, https://law.counselstack.com/opinion/onsen-v-commonwealth-edison-co-illappct-1994.