OPINION BY ADMINISTRATIVE JUDGE CLARKE PURSUANT TO BOARD RULE 12.2

This is a Rule 12.2 1 expedited appeal. Military Aircraft Parts (MAP) appeals the termination for default of its contract with the Defense Logistics Agency (DLA) for certain aircraft ducts based on DLA's disapproval ofMAP's first articles. We have jurisdiction pursuant to the Contract Disputes Act of 1978 (CDA), 41 U.S.C. §§ 7101-7109. We sustain the appeal.

FINDINGS OF FACT

1. MAP was awarded Contract No. SPM4A7-l 1-M-T291on11August2011 in the amount of $25,565. The contract required MAP to manufacture one first article (FA) and seven production welded aluminum air duct assemblies part No. 16Y226-1. (R4, tab 1at1, 3, 8, 9) The contract included FAR 52.209-4, FIRST ARTICLEAPPROVAL- GOVERNMENT TESTING (SEP 1989); and FAR 52.249-8, DEFAULT (FIXED-PRICE SUPPLY AND SERVICE (APR 1984) (R4, tab 1at14, 16). FAR 52.209-4(h) provides that a first article may be approved, conditionally approved or disapproved. It also states, "Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of

1 The Contract Disputes Act, implemented by Board Rule 12.2, provides that this decision shall have no value as precedent, and in the absence of fraud, shall be final and conclusive and may not be appealed or set aside. the Contractor." FAR 52.249-8 allowed the government to terminate the contract for default if the contractor failed to deliver the supplies within the time specified and if later determined that the contractor was not in default or its default was excusable, the termination is converted to one for the government's convenience.

2. The assembly drawing for this part is 16Y226, "DUCT, MANIFOLD-CABIN AIR" (app. supp. R4, tab 102). Relevant drawing notes are:

1. WELD PER Ml05. INSPECT WELDS PER FPS-1097, CLASS III.

2. MANUFACTURING PROCESS TEST, PROOF TEST -1 ASSY TO 25 PSIG AT ROOM TEMPERATURE. NOLEAKAGEORPERMANENT DEFORMATION ALLOWED.

(Id.) Drawing l 6Y226 also specifies dimensions that the duct assembly must meet with general tolerances of".XX +/- .03, .XXX +/- .010, .X +/- .l" (id.). These were referred to as "default tolerances" that were to be used on dimensions shown on the drawings (tr. 11134, 271-72, 2/69). FPS-1097, CLASS III, requires that weld inspection shall be conducted in accordance with paragraph 3.2.3 (app. supp. R4, tab 103 at 28) that requires visual inspection to be performed in a "well-lit area with light intensity of 75 ft-candle or higher and at a magnification not higher than 1OX" (id. at 20).

3. Drawing l 6Y226 calls out a total of four couplings identified on the drawing as C755 l-3-16, C755 l-3-40 (two places), and C755 l-3-48 (app. supp. R4, tab 102). The drawing for the parts, drawing C755 l, "COUPLING, FLEXIBLE, FIXED CAVITY," identifies dimensions for these couplings in Table 3 as follows:

LM NOM CDIA DMIN KDIA XDIA AERO TUBE OD MAX MAX +/- .002 SIZE (REF) DASH NOb -16 1.000 .935 .684 1.273 1.263 -40 2.500 2.435 .709 2.813 2.806 -48 3.000 2.935 .709 3.313 3.306

(R4, tab 30, sheet 5) The "K DIA MAX" does not have a+/- tolerance because it is a maximum dimension (tr. 11218).

4. MAP submitted an FA 31May2013 that was disapproved on 20 June 2013 (R4, tab 10 at 2 of3). The disapproval was based on a list of six discrepancies

2 summarized as follows: the 1.32-inch dimension on assembly drawing 16Y226 was out-of-tolerance; three dimensions on coupling drawing C755 l were out-of-tolerance after welding; weld penetration at Joint 23 was too thick; and there was no pressure test certification (R4, tab 10 at 4). In forwarding the FA test results to DLA, Mr. Lewis, FA program manager, Hill Air Force Base (AFB), Utah, wrote, "A resubmittal will be required" (id. at 3). This FA inspection was performed by Mr. Hamblin, dimensional technician2 (app. supp. R4, tab 110 at 6). The government did not present Mr. Hamblin at the hearing. Mr. Schabacker, lead engineer, F-16 program office, Hill AFB, testified that flange distortion on the C755 l coupling after welding is a known condition and should be addressed in the Technical Data Package (TDP) (tr. 11136, 143). The 16Y226 TDP in MAP's contract did not contain any information as to the acceptable change in C755 l flange dimensions (distortion) due to welding (tr. 11143, 2/43, 47). Mr. Schabacker testified that they had the option of doing a "fit test" to see if an FA can actually be installed in an F-16, but that it is rarely done (tr. 11147). The record, however, includes an example of where Mr. Schabacker requested a fit test for the same part from another manufacturer with out-of-round condition (app. supp. R4, tab 113 at 10). The response was, "after looking at the install of this duct and talking with a technician the install of this duct will require loosening of other attaching ducts where slight adjustments can accommodate these discrepancies. Conditional approve." (Id. at 9)

5. On 14 August 2013 MAP responded to the six discrepancies (R4, tab 11). It said it "re-measured with a CMM[31 and the 1.32" +/- .03" dimension was verified to be 1.3222" that met the specification. A copy of the result was attached and MAP offered to repeat the measurement with the Defense Contract Management Agency (DCMA) present. Mr. Valenzuela is an inspector at MAP with thirty years of experience (tr. 2/60). He has twenty years of experience using a CMM (tr. 2/63). He performed the CMM measurements on the disapproved first FA returned from Hill AFB (id.). He testified that he got good dimensions (id.). He inspected the welds on both disapproved FAs and thought they were acceptable (tr. 2/65). If it was a "little too thick" it could be repaired (tr. 2/65-66). The three C755 l flange dimensions are required prior to welding and the drawings have no dimension requirement for these parts after welding (tr. 2/67-68). Mr. Marin testified that the drawings listed on pages 5 to 8of16 of the contract apply to the duct, but that only drawings with an entry next to "TYPE NUMBER" are applicable to final inspection (tr. 2/207; R4, tab 1 at 5-8of16). The only drawing with an entry next to the "TYPE NUMBER" is drawing l 6Y226, all the other drawings have no entry next to type number (R4, tab 1 at 5of16). The omission of a type number on the drawing C755 l means that it is not applicable to the final assembly (tr. 2/207; R4, tab 1 at 6of16). The

2 The second FA was inspected by Mr. Madison, also a dimensional technician, who testified that he was not trained to inspect welds (tr. 1116-17, 22-24 ). There is no evidence in the record that Mr. Hamblin is a trained weld inspector. 3 Coordinate Measuring Machine (tr. 1117).

3 government did not rebut this testimony. Also, Mr. Marin testified that the government could have included notice that the +/- .002 tolerance would be applied after welding in the "exceptions" section of the contract, and if they had, MAP would not have bid on the contract (tr. 2/208-09; R4, tab 1 at 3of16). Mr. Marin and Mr. Valenzuela testified that the default tolerances on the 16Y226 drawing only apply to dimensions actually shown on the drawing (tr. 2/69, 209). Mr. Valenzuela testified "there was no way to conceivably stop" flange distortion during welding (tr. 2/68).

Free access — add to your briefcase to read the full text and ask questions with AI

Military Aircraft Parts, (asbca 2015).

Military Aircraft Parts (Military Aircraft Parts) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

States Roofing Corporation v. Winter
587 F.3d 1364 (Federal Circuit, 2009)
Astro Science Corp. v. United States
471 F.2d 624 (Court of Claims, 1973)