Marta Arredondo v. Techserv Consulting and Training, Ltd., T&D Solutions, LLC, and AEP Texas Central Company

567 S.W.3d 383
Court of Appeals of Texas·Decided September 26, 2018·No. 04-17-00609-CV·Published·Cited by 16 cases

Opinion

Fourth Court of Appeals

San Antonio, Texas

OPINION

No. 04-17-00609-CV

Marta ARREDONDO,

Appellant

v.

TECHSERV CONSULTING AND TRAINING, LTD., T&D Solutions, LLC, and AEP Texas Central Company,

Appellees

From the 79th Judicial District Court, Brooks County, Texas Trial Court No. 15-08-16922-CV Honorable Richard C. Terrell, Judge Presiding

Opinion by: Irene Rios, Justice

Sitting: Sandee Bryan Marion, Chief Justice Karen Angelini, Justice

Irene Rios, Justice

Delivered and Filed: September 26, 2018 AFFIRMED IN PART, REVERSED AND REMANDED IN PART Marta Arredondo appeals the trial court’s orders granting Techserv Consulting and Training Ltd. (“Techserv”), T&D Solutions, LLC (“T&D”), and AEP Texas Central Company’s (“AEP”) traditional and no-evidence motions for summary judgment. As to T&D, we affirm the trial court’s order as to Arredondo’s claims for negligence per se and gross negligence, reverse the trial court’s order as to Arredondo’s negligence claim, and remand the cause for further proceedings. As to AEP, we reverse the trial court’s order granting AEP’s motions for traditional and no-evidence summary judgment with regard to Arredondo’s claims for negligence, negligence

per se, and gross negligence and remand the cause for further proceedings. As to Techserv, we affirm the trial court’s order.

BACKGROUND

AEP, an electric utility company, entered into a contract with T&D whereby T&D agreed to provide “all supervision, labor, equipment and specified materials necessary to perform underground distribution line construction and/or maintenance services (“Construction Services”), underground distribution line construction and/or maintenance bid projects (“Project Services”) and storm restoration services (“Storm Services”) to [AEP] on an as needed basis in AEP Texas service areas.” These services included “deteriorated pole replacements” and “overhead system maintenance and switching.” AEP also entered into a contract with Techserv whereby Techserv agreed to provide “all supervision, labor, and specified equipment and materials necessary to perform joint use engineering services to assess pole attachment construction proposal requests to attach equipment, wires, or other materials to [AEP’s] poles submitted to [AEP] by third parties.” Techserv’s role was to inspect work performed by T&D to ensure the work was completed according to AEP’s specifications.

In 2013, AEP prepared and issued a work order to T&D that included the removal of a utility pole 1 located on a municipal right of way easement 2 on Arredondo’s property, just outside Arredondo’s fence. T&D removed the pole, and T&D marked the work order as completed on

1 The utility pole at issue in this case was a “stub pole.” A stub pole is a utility pole from which the top portion has been cut off after the electric wires have been removed and transferred to a new pole but to which other wires, such as telephone or cable, remain attached on the lower portion. A stub pole is not removed until all wires attached to it have been relocated to another pole. 2 A right of way is a type of easement. See Grimes v. Corpus Christi Transmission Co., 829 S.W.2d 335, 337 (Tex. App.—Corpus Christi 1992, writ denied) (“Right-of-way easements may be used generally for travel, transportation of persons and property, and communication.”); see also Marcus Cable Assocs., L.P. v. Krohn, 90 S.W.3d 697, 700 (Tex. 2002) (“an easement is a nonpossessory interest that authorizes its holder to use the property for only particular purposes”).

December 2, 2013. After T&D employees removed the pole, they laid it on the ground alongside the fence. On July 30, 2014, approximately two weeks after the utility pole that had been removed by T&D was picked up from the edge of Arredondo’s property, Arredondo stepped into a hole where the utility pole had been located while mowing her lawn, causing her to fall and injure her knee and back.

After she fell into the hole, Arredondo called AEP and informed it of the hole on her property where the utility pole had been located. AEP responded to the call by sending a service technician to investigate and take pictures of the hole, which was the size and diameter of a hole caused by the removal of a utility pole. Shortly after arriving at the property, the AEP service technician filled the hole with dirt.

Arredondo sued AEP, T&D, and Techserv, alleging they possessed the easement and created a defect on the easement when they removed the pole and failed to fill the hole or otherwise warn of its existence. Arredondo alleged AEP, T&D, and Techserv were negligent, negligent per se, and grossly negligent. AEP, T&D, and Techserv each filed motions for traditional and no- evidence summary judgment, which the trial court granted in separate orders.

This appeal followed.

STANDARD OF REVIEW

We review a summary judgment de novo. Travelers Ins. Co. v. Joachim, 315 S.W.3d 860, 862 (Tex. 2010). “When reviewing a summary judgment, we take as true all evidence favorable to the nonmovant and we indulge every reasonable inference and resolve any doubts in the nonmovant’s favor.” Exxon Mobil Corp. v. Rincones, 520 S.W.3d 572, 579 (Tex. 2017).

“After adequate time for discovery, a party without presenting summary judgment evidence may move for summary judgment on the ground that there is no evidence of one or more essential elements of a claim or defense on which an adverse party would have the burden of proof

at trial.” TEX. R. CIV. P. 166a(i). If the nonmovant brings forward more than a scintilla of probative evidence raising a genuine issue of material fact, then a no-evidence summary judgment is not proper. Smith v. O’Donnell, 288 S.W.3d 417, 424 (Tex. 2009); see TEX. R. CIV. P. 166a(i). “A genuine issue of material fact exists if more than a scintilla of evidence establishing the existence of the challenged element is produced.” Ford Motor Co. v. Ridgway, 135 S.W.3d 598, 600 (Tex. 2004). “[M]ore than a scintilla of evidence exists if the evidence ‘rises to a level that would enable reasonable and fair-minded people to differ in their conclusions.’” Id. at 601 (quoting Merrell Dow Pharm., Inc. v. Havner, 953 S.W.2d 706, 711 (Tex. 1997)).

“A party moving for traditional summary judgment has the burden to prove that there is no genuine issue of material fact and that it is entitled to judgment as a matter of law.” Cantey Hanger, LLP v. Byrd, 467 S.W.3d 477, 481 (Tex. 2015); see also TEX. R. CIV. P. 166a(c). A movant who conclusively negates at least one of the essential elements of a cause of action is entitled to summary judgment. Frost Nat. Bank v. Fernandez, 315 S.W.3d 494, 508 (Tex. 2010). “Once the movant establishes its right to summary judgment as a matter of law, the burden shifts to the nonmovant to present evidence raising a fact issue to defeat the motion for summary judgment.” Briggs v. Toyota Mfg. of Texas, 337 S.W.3d 275, 282 (Tex. App.—San Antonio 2010, no pet.).

Free access — add to your briefcase to read the full text and ask questions with AI

Marta Arredondo v. Techserv Consulting and Training, Ltd., T&D Solutions, LLC, and AEP Texas Central Company, 567 S.W.3d 383 (Tex. Ct. App. 2018).

567 S.W.3d 383 (Marta Arredondo v. Techserv Consulting and Training, Ltd., T&D Solutions, LLC, and AEP Texas Central Company) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Untitled Case
S.D. Texas, 2026
Marvella Loya v. Hickory Trail Hospital, L.P.
Court of Appeals of Texas, 2022
in Re: Eagleridge Operating, LLC
Court of Appeals of Texas, 2020