Lochrane Engineering, Inc. v. Willingham Realgrowth Inv. Fund, Ltd.

552 So. 2d 228, 14 Fla. L. Weekly 2424, 1989 Fla. App. LEXIS 5617, 1989 WL 119077
CourtDistrict Court of Appeal of Florida
DecidedOctober 12, 1989
Docket88-1501 and 88-1502
StatusPublished
Cited by22 cases

This text of 552 So. 2d 228 (Lochrane Engineering, Inc. v. Willingham Realgrowth Inv. Fund, Ltd.) is published on Counsel Stack Legal Research, covering District Court of Appeal of Florida primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Lochrane Engineering, Inc. v. Willingham Realgrowth Inv. Fund, Ltd., 552 So. 2d 228, 14 Fla. L. Weekly 2424, 1989 Fla. App. LEXIS 5617, 1989 WL 119077 (Fla. Ct. App. 1989).

Opinion

552 So.2d 228 (1989)

LOCHRANE ENGINEERING, INC. and Frank N. Anderson, Appellants,
v.
WILLINGHAM REALGROWTH INVESTMENT FUND, LTD., et al., Appellees.

Nos. 88-1501 and 88-1502.

District Court of Appeal of Florida, Fifth District.

October 12, 1989.
Rehearing Denied November 21, 1989.

*229 James C. Mize, Jr., of Bull & Mize, Orlando, for appellant Lochrane Engineering, Inc.

John H. Bill of Allen, Brown & Builder, P.A., Winter Park, for appellant Frank N. Anderson.

Marvin E. Rooks of Rooks & Willingham, Maitland, for appellees Willingham Realgrowth Investment Fund, Ltd., et al.

COWART, Judge.

This case involves the proper measure of damages for breach of implied warranty by the seller of new residential units where *230 the septic tank sewage disposal system was inadequate. This case also involves the liability of, and the proper measure of damages against, a design engineer who negligently designed the inadequate but repairable septic tank system.

A landowner-developer-seller (Anderson), constructing certain residential units for sale, had plans prepared by Walmsley and hired a general contractor (Nubar), a civil engineer (Lochrane) and a septic tank subcontractor (Seagrave-Brownie) to install a septic tank sewage disposal system. The buyer (Willingham) from the developer-seller found the sewage system inadequate and sued all who were involved (except Walmsley) on various theories. The developer-seller cross-claimed against the engineer and the septic tank contractor.

At trial, two experts suggested three possible remedies for the insufficient septic tank and drain field sewage disposal system. The expert (Carson) for the plaintiff-buyers was of the opinion that the best possible solution was to connect the units to a City of Orlando central sewage system and he estimated the engineering cost to study the feasibility of that alternative at $17,300 and, if it were found feasible, estimated the actual cost of such connection at $94,820. The expert (Barnes) for the septic tank contractor (Brownie) was of the opinion that the problem was that the drain fields were too small to handle the quantity and quality of the effluent from the septic tanks but that the septic tank system was repairable on-site in either of two ways: (1) by adding a secondary tank and enlarging the drain fields at an estimated cost of $800 per system or a total of $8,000, or (2) by installing an aerobic system to aerate and improve the quality of the effluent from each tank at an estimated cost of $2,500 per system or a total of $25,000.

The buyer testified that the buyer had paid $3,000 to pump the septic tanks out. The trial court entered a judgment for $45,000 against the developer-seller, the septic tank contractor[1] and the engineer. The developer-seller and the engineer appeal.

The trial court found the developer-seller liable to the buyer on theories of negligence and implied warranty. The seller's legal duties to the buyer were ex contractu and not ex delicto. This means that the seller's obligations and liabilities to the buyer were founded not in the breach of the general public duty, imposed by law, to use due care, the breach of which is the tort of negligence, but in contract, either from express promises or promises implied by law from the factual relationship of the parties. The proper theory of recovery was not for the tort of negligence but the breach of a warranty implied by law by consumer protection minded courts in the sales of real estate as an exception to the late common law rule of caveat emptor, specifically, the breach of an implied warranty of fitness for habitation.[2] Of course the defects in the sewage disposal system were latent.

Although the buyer bought five residential duplex units (ten dwelling units) as an investment for rental, we apply Gable v. Silver, 258 So.2d 11 (Fla. 4th DCA 1972), cert. dismissed, decision adopted, 264 So.2d 418 (Fla. 1972) and not the narrow exception for investment-related improvement of vacant land made in Conklin v. Hurley, 428 So.2d 654 (Fla. 1983). We therefore affirm the judgment finding the seller of the new residential units impliedly warranted to the buyer that the units' sewage disposal systems were adequate to serve the normal needs of such units.

The $45,000 damage award against the developer-seller was composed of $3,000 for maintenance (meaning the cost of pumping out the septic tanks to make the inadequate system temporarily functionable), $25,000 for installation of an aerobic system and $17,000 for an engineering study to determine the feasibility of connecting these residential units to a municipal *231 central sewer system. In announcing its decision, the trial court expressly relied on the expert Barnes, whose opinion was that the septic tank system while inadequate, was repairable. The testimony of that witness would have supported a trial court decision that, as a practical matter, a satisfactory on-site repair to the sewer system as originally designed could have been accomplished by the expenditure of $8,000 for more drain field area and a second septic tank rather than the more expensive installation of an aerobic system which was not part of the original design. While we seriously considered reducing the damage award to $8,000 we finally decided to defer to the trial court's discretion on this point.[3]

If defective construction can be repaired, the proper measure of the owner's damages is the cost to repair which substantially gives the owner that to which he is entitled either under an express or implied contract.[4] In this case, the buyer entered into a purchase contract with the developer-seller before the units in question were constructed based on plans and specifications for the proposed construction; therefore, the relationship between the developer-seller and the buyer in this case was essentially the same in law as that between a construction contractor and an owner[5] and here the plans did not call for the residential units to be connected to a municipal central sewer system (nor for the septic tank to have an aerobic system) but only for a standard septic tank-drain field sewage disposal system. The buyer (owner) was not entitled to damages relating to either the cost of an engineering feasibility study to connect to a central sewer system or the cost of making such connection and was certainly not entitled to both the $25,000 cost of repairs by adding the aerobic system and the $17,000 cost of studying the feasibility of connecting to the municipal sewer system and that $17,000 item of damages is hereby reversed and stricken.

As stated above, the developer-seller cross-claimed against the engineer (Lochrane), who allegedly designed the septic tank system as installed, and against the septic tank contractor, who installed the system. These cross-claims, for indemnity and contribution, were to the effect that if the developer-seller was found liable to the plaintiff-buyer because of defects in design or construction of the septic tank system, then, for the same reasons, the developer-seller was entitled to recover from the engineer or the septic tank installer, or both.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Lopez ex rel. Lopez v. Andie's, Inc.
137 So. 3d 528 (District Court of Appeal of Florida, 2014)
School Board of Broward County v. Pierce Goodwin Alexander & Linville
137 So. 3d 1059 (District Court of Appeal of Florida, 2014)
Alderman v. BCI Engineers & Scientists, Inc.
68 So. 3d 396 (District Court of Appeal of Florida, 2011)
Trikon Sunrise Associates, LLC v. Brice Building Co.
41 So. 3d 315 (District Court of Appeal of Florida, 2010)
Indemnity Insurance Company v. American Aviation
399 F.3d 1275 (Eleventh Circuit, 2003)
Post, Buckley, Schuh & Jernigan, Inc. v. Monroe County
851 So. 2d 908 (District Court of Appeal of Florida, 2003)
Moransais v. Heathman
744 So. 2d 973 (Supreme Court of Florida, 1999)
Lonnie D. Adams Building Contractor, Inc. v. O'Connor
714 So. 2d 1178 (District Court of Appeal of Florida, 1998)
CH2M HILL v. Pinellas County
698 So. 2d 1238 (District Court of Appeal of Florida, 1997)
ELIZABETH N. v. Riverside Group, Inc.
585 So. 2d 376 (District Court of Appeal of Florida, 1991)
Pinellas County v. Interpace
41 Fla. Supp. 2d 65 (Florida Circuit Courts, 1990)
Lochrane Engineering, Inc. v. Willingham Realgrowth Inv. Fund, Ltd.
563 So. 2d 719 (District Court of Appeal of Florida, 1990)

Cite This Page — Counsel Stack

Bluebook (online)
552 So. 2d 228, 14 Fla. L. Weekly 2424, 1989 Fla. App. LEXIS 5617, 1989 WL 119077, Counsel Stack Legal Research, https://law.counselstack.com/opinion/lochrane-engineering-inc-v-willingham-realgrowth-inv-fund-ltd-fladistctapp-1989.