Kyburz v. State

108 N.W.2d 645, 79 S.D. 114, 1961 S.D. LEXIS 23
South Dakota Supreme Court·Decided April 19, 1961·No. File 9821·Published·Cited by 10 cases

Opinion

ROBERTS, J.

This is an original action in this court instituted under the provisions of SDC 1960 Supp. 33.0604 to enforce payment of a claim against the State. The action arises out of a building contract for the construction of a dormitory at Northern State Teachers College, Aberdeen. The contract price was $181,800. The State Engineer claiming that plaintiffs failed to furnish 150 bedsprings specifically called for under the contract directed the deduction of $1,687.50 from the contract price. The claim for that amount which plaintiffs now seek to enforce was rejected by the State Auditor. The cause was referred to a referee, Honorable Philo Hall, who after hearing the evi *115 dence found that plaintiffs are entitled to .judgment.

Plaintiffs assert that there is no provision in the contract requiring them to furnish bedsprings and that furnishings are not a part of the building constructed. Counsel for defendant insist that these furnishings are shown in the plans; that under the terms of the contract it was within the authority of the State Engineer to determine the meaning and intent of any portion of the plans and specifications or drawings when in dispute; and that his determination of the controversy in favor of the State is binding and conclusive.

The contract executed on August 24, 1957, by the parties recited that the advertisement for bids, proposal and plans and specifications were made a part of the contract by reference. The advertisement called for bids “for the labor and materials to construct a Girls Dormitory Building.” Other material parts of the contract are as follows:

“The Contractor shall perform everything required to be performed and shall provide and furnish all of the labor,, materials, necessary tools, expendable equipment, and all utility and transportation services required to perform and complete in a workmanlike manner all the work required for the General Contract in connection with the construction of the Girls’ Dormitory Project of the Owner, all in strict accordance with the Plans and Specifications including any and all addenda, prepared by The Architect under the general charge and supervision of the State Engineer, acting, and in these contract documents referred to, as the State Engineer, which plans and specifications are made a part of this contract, and in strict compliance with the Contractor’s proposal and the other contract documents herein mentioned which are a part of this contract; and the contractor shall do every thing required by this contract and the other documents constituting a part hereof.”

*116 The specifications made a part of the contract contain, among other things, the following provisions:

“The Contractor shall and will, in good workmanlike manner, do and perform all work and furnish all supplies and materials, machinery, equipment, facilities and means, exc'ept as herein otherwise expressly specified, necessary or proper to perform and complete all the work required by this contract, within the time herein specified,, in accordance with the provisions of this contract and said specifications and in accordance with the plans and drawings of the work covered by this contract and any and all supplemental plans and drawings, and in accordance with the directions of the (Architect) (Engineer) as given from time to time during the progress of the work. * *
“The State Engineer shall give all orders and directions contemplated under this contract and specifications relative to the execution of the work. The State Engineer shall determine the amount, quality, acceptability, and fitness of the several kinds of work and materials which are to be paid for under this contract and shall decide all questions which may arise in relation to said work and the construction thereof. The State Engineer estimates and decisions shall be final and conclusive, except as herein otherwise expressly provided. In case any question shall arise between the parties hereto relative to said contract or specification, the determination or decision of the State Engineer shall be a condition precedent to the right of the Contractor to receive any money or pay- ■ ment for work under this contract affected in any manner or to any extent by such question. The State Engineer shall decide the meaning and intent of any portion of the specifications and of *117 any plans or drawings where the same may ■ be found obscure or be in dispute.”

The Attorney General excepted to the findings and conclusions of the referee. The challenged findings read as follows:

“16. That said contract does not have any provision relating to furniture or bedsprings except that on Page 15 of the plans, (Exhibit No. 4) there is a drawing of a spring and mattress on the bunk, and notations as follows: ‘Simmons L-320, springs, size 3/3; 6’ 4” spring size,’ and ‘Simmons L-320, spring size 3/3,’ and said drawing did not have such items circled in red at the time of execution of the contract. 1 That the same blueprint or plan, (Exhibit No. 4, Page 15) had other items shown thereon which defendant does not contend plaintiffs were required to furnish, such items being shown to designate size or location, including lighting fixtures, a laundry sink, and radiation, and such items were furnished by other contractors.
“17. That there is no provision, specification or requirement for the plaintiffs to- furnish the springs in question at any place in said contract; that the springs are not a part of the structure constructed under said contract, and are removable.”

Free access — add to your briefcase to read the full text and ask questions with AI

Kyburz v. State, 108 N.W.2d 645, 79 S.D. 114, 1961 S.D. LEXIS 23 (S.D. 1961).

108 N.W.2d 645 (Kyburz v. State) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Elrod v. General Casualty Co. of Wisconsin
1997 SD 90 (South Dakota Supreme Court, 1997)
Azcon Construction Co. v. Golden Hills Resort, Inc.
498 N.W.2d 630 (South Dakota Supreme Court, 1993)
Subsurfco, Inc. v. B-Y Water District
337 N.W.2d 448 (South Dakota Supreme Court, 1983)
Brezina Construction Co. v. South Dakota Department of Transportation
297 N.W.2d 168 (South Dakota Supreme Court, 1980)
G. H. Lindekugel & Sons, Inc. v. S. D. State Highway Commission
202 N.W.2d 125 (South Dakota Supreme Court, 1972)
Hartford Accident and Indemnity Co. v. State
187 N.W.2d 663 (South Dakota Supreme Court, 1971)
Eickhof Construction Company v. City of Grafton
123 N.W.2d 580 (North Dakota Supreme Court, 1963)