*3 ROSSMAN, J.

The defendant’s plant, in which it conducted the business of selling and repairing motor trucks, occupied a two-story building 200 by 200 feet in dimensions. The plaintiff had been employed in the service department of that plant for six years as an expert in the repair of that portion of automobile trucks known as the transmission. Referring to this part of trucks he testified upon direct examination: “I was assigned as a specialist to do this particular kind of work,” and added that during his six years’ employment with the defendant he had repaired about 5,000 transmissions. November 15, 1929, the plaintiff, upon reaching the plant at 8 o’clock in the morning, was assigned to the task of discovering what, if anything, was wrong with the transmission of a disabled truck which had just entered the plant. He was told to hurry as much as possible because the owner wanted the return of his truck at 11 o’clock a. m. After disengaging the transmission from the chassis the plaintiff lifted the transmission from its place in the truck to *4 Ms bench by the use of a crane. He then disassembled the transmission and took the part which he suspected was in need of repair to a vat wMch contained a chemical compound which, when heated, removed grease from metal. However, the employee in charge of the vat had not yet heated the solution and, therefore, the plaintiff returned to his bench and cleaned the grease from the transmission to his satisfaction with a cloth and some hot water. The grease having been thus removed the plaintiff discovered some breaks in the cleaned part and called them to the attention of his foreman, one Charles Beck. A delay of half an hour ensued before Beck could communicate with the owner and acquaint him with the extent of the needed repairs. In this half hour’s time the plaintiff removed further grease and inspected another part of the transmission. He then voluntarily abandoned work upon this job and did not return to it until 2:30 in the afternoon; the consent of the owner having been obtained in the meantime that the suggested repairs be made. At 3:30 p. m., after the plaintiff had completed the repair of the broken parts and was reassembling the transmission, he found it necessary to strike the end of the shaft with a hammer so as to adjust it into position. The shaft was made of hard steel. The plaintiff struck the blow, which he described as a tap, with a ball peen hammer made of steel and weighing half a pound or less. The hammer belonged to himself and had been provided in obedience to a custom wMch required all mechanics to supply their own hand tools. The first tap loosened a fine particle of steel from the shaft which flew into the plaintiff’s right eye.

The complaint alleged that the defendant was negligent: (1) in having “failed to furnish for plaintiff’s use a hammer made of soft material”; (2) in having *5 “failed to furnish light for plaintiff to work by”; (3) in having “failed to furnish any adequate cleaning device for the removal of grease and dirt from the used parts”; and (4) in having “failed to arrange for adequate time in which to do the work but required the plaintiff to hurry as much as possible so that the work would be finished and ready for delivery at the time fixed by the defendant.”

The first assignment of error challenges the ruling of the circuit court which denied the defendant’s motion for a directed verdict. We shall now consider this exception.

While the plaintiff testified that he was told “to hurry it and get it out by 11 o’clock” it will be observed from the testimony reviewed above that the plan to complete the job by 11 o’clock was abandoned when the foreman of the service department was unable to obtain the owner’s consent to proceed with the repairs before half past 2 in the afternoon. Plaintiff’s injury did not occur until 3:30 p. m. The above quoted words constitute practically the sole basis of the plaintiff’s contention that he was told to hurry. When work was again resumed no instructions to hurry were given. So much time elapsed from the dissembling of the transmission until 2:30 in the afternoon, when work upon the truck was resumed, that the plaintiff upon his own volition abandoned work upon this job and proceeded with other work. We conclude that this specification of negligence is unsupported by proof.

The charge that the defendant ‘ ‘ faded to furnish any adequate cleaning device for the removal of grease” we believe is likewise unsupported by proof. The plaintiff did not testify that the vat with its con *6 tents of grease-removing, chemicals was any more effective as a grease-remover than the method which he employed upon discovery that the solution was cold, but testified that it'was capable of accomplishing its result quicker. The defendant was not required to provide any specific kind of a grease-removing method. Its duty to exercise due care for the safety of its employees was discharged when it had provided a reasonably suitable appliance, material or method: Blust v. Pacific Telephone Company, 48 Or. 34 (84 P. 847). But even if we should grant that the defendant owed to the plaintiff a duty of providing a vat with a hot solution capable of removing the grease from the transmission, yet the plaintiff did not testify that in the afternoon when he proceeded with his work the solution was cold and incapable of removing the grease. It is true that he had testified that the contents were cold in the morning and that the employee in charge of the vat had told him he “could not do any washing for me that morning” but the plaintiff made no mention of the condition of the vat in the afternoon. Further, it will be observed from the testimony reviewed above that ample time had been available to the plaintiff to remove the grease from the transmission before he resumed work on this truck at 2:30 in the afternoon. A complete removal of the grease apparently was unnecessary. The use of the cloth with which the plaintiff wiped away the oil was so effective that after the accident he was able to discover a minute defect in the steel by rubbing the spot once more with his piece of cloth. We conclude that this charge of negligence could avail the plaintiff nothing.

We come now to the specification of negligence which alleges that the defendant “failed to furnish sufficient light for plaintiff to work by. ’ ’ The plaintiff *7 testified that the day of his injury was foggy. The service room in which he was employed was 90 by 200 feet in size. Both of its ends consisted largely of glass. Natural light was admitted to the central part of this room by a large light well. The plaintiff testified that tight which ordinarily would have reached his work bench from the tight well was partially obstructed that day. He testified that artificial tight was available from series of electric tights. We quote from his testimony thus: “There is a series of lights of six tights running parallel north and south.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Kennedy v. Wheeler
341 P.3d 728 (Oregon Supreme Court, 2014)
Congdon v. Berg
299 P.3d 588 (Court of Appeals of Oregon, 2013)
Sandford v. Chevrolet Division of General Motors
629 P.2d 407 (Court of Appeals of Oregon, 1981)
Eisele v. Rood
551 P.2d 441 (Oregon Supreme Court, 1976)
Concannon v. Oregon Portland Cement Co.
447 P.2d 290 (Oregon Supreme Court, 1968)
Munger v. State Industrial Accident Commission
414 P.2d 328 (Oregon Supreme Court, 1966)
Cox v. Al Peirce Lumber Co.
398 P.2d 746 (Oregon Supreme Court, 1965)
Skeeters v. Skeeters
391 P.2d 386 (Oregon Supreme Court, 1964)
Shultz v. Monterey
375 P.2d 829 (Oregon Supreme Court, 1962)
Powell v. Moore
364 P.2d 1094 (Oregon Supreme Court, 1961)
Brooks v. Gladden
358 P.2d 1055 (Oregon Supreme Court, 1961)
Clark v. STRAIN
319 P.2d 940 (Oregon Supreme Court, 1958)
Rodgers Insurance Agency v. Andersen MacHinery
316 P.2d 497 (Oregon Supreme Court, 1957)
Baldassarre v. West Oregon Lumber Co.
239 P.2d 839 (Oregon Supreme Court, 1952)
Wells v. Nibler
221 P.2d 582 (Oregon Supreme Court, 1950)
Williams v. Clemen's Forest Products, Inc.
217 P.2d 252 (Oregon Supreme Court, 1950)
Hale v. Electric Steel Foundry Co.
192 P.2d 257 (Oregon Supreme Court, 1948)
Kelley v. Oregon Shipbuilding Corp.
189 P.2d 105 (Oregon Supreme Court, 1948)
Barker v. Portland Traction Co.
178 P.2d 706 (Oregon Supreme Court, 1946)
Smith v. Shevlin-Hixon Co.
157 F.2d 51 (Ninth Circuit, 1946)

Cite This Page — Counsel Stack

Bluebook (online)
7 P.2d 796, 139 Or. 1, 1932 Ore. LEXIS 125, Counsel Stack Legal Research, https://law.counselstack.com/opinion/freeman-v-wentworth-irwin-inc-or-1932.