Eleanore Higginbotham Aretz v. United States of America, Thomas F. Aretz v. United States

604 F.2d 417, 1979 U.S. App. LEXIS 11192
CourtCourt of Appeals for the Fifth Circuit
DecidedOctober 15, 1979
Docket78-3615
StatusPublished
Cited by55 cases

This text of 604 F.2d 417 (Eleanore Higginbotham Aretz v. United States of America, Thomas F. Aretz v. United States) is published on Counsel Stack Legal Research, covering Court of Appeals for the Fifth Circuit primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Eleanore Higginbotham Aretz v. United States of America, Thomas F. Aretz v. United States, 604 F.2d 417, 1979 U.S. App. LEXIS 11192 (5th Cir. 1979).

Opinions

TUTTLE, Circuit Judge:

On February 3, 1971, fire broke out in Building M-132 of the Thiokol Chemical Corporation’s Woodbine, Georgia, plant, where Thiokol was manufacturing flares used for nighttime illumination in the Vietnam War. The fire spread quickly and reached a room where loose, intensely flammable, material used in the 'flares was stored. Building M-132 exploded. Fifty employees were injured, twenty-nine were killed.

Thiokol was manufacturing the flares under a contract with the United States Army according to Army specifications and certain Army manufacturing standards. These included a system for classifying materials produced in arms manufacture according to their hazardousness. The illuminant material which caused the explosion was classified only as a fire hazard, not as an explosive. Deciding that this classification inadequately reflected the danger of an explosion, the Army raised the classification of illuminant from fire hazard to explosive three months before the explosion at Woodbine. Inexplicably, this change was never communicated to the Army procurement officials who supervised the Thiokol contract or to Thiokol. Instead, the directive ordering the change appears to have remained in a desk drawer until after the accident.

This case was brought by one of those injured and his wife. It is the test case of twenty-five brought against the United States 1 under the Federal Tort Claims Act2 alleging that the negligence of Army procurement employees proximately caused the catastrophe at Woodbine and seeking aggregate damages of $717,526,391. The consolidated trial was bifurcated; the district court first heard evidence on liability alone in all twenty-five cases. The court found that the illuminant used in the manufacture of trip flares at Woodbine was wrongly classified and that employees of the Army were negligent in failing to communicate the Army’s change in classification to Thiokol. This negligence, the district court held, was a proximate cause of the explosion. The present case then proceeded on the issue of damages and the court granted final judgment for the plaintiffs.

The United States appeals. We have expedited the appeal and granted leave to the plaintiffs in the cases still pending to intervene as appellees. We are presented with the government’s contentions that there is no theory of negligence in this case which is Consistent with limitations which the Tort Claims Act places on the United States’ consent to suit for the torts of government employees, and that the district court was clearly erroneous in finding that the acts or omissions of government employees were a proximate cause of the explosion.

I.

A

The fire which caused the explosion at Woodbine traveled along the flare assembly [421]*421line and fed on several materials used in the flares. Since causation is one issue before us, an understanding of the flare manufacturing process is relevant.

Both production of the materials used in the flares and assembly of the flares took place in Building M-132. The illuminant composition, a compound of sodium nitrate and brilliant-burning magnesium with a binder, was the principal ingredient of the flare. It was mixed in 500 pound batches, then twice granulated, spread on trays, and placed in the “cure room” for curing at 110° Fahrenheit. After the second curing, the illuminant was pressed into pellets. Also prepared in Building M-132 was the “first fire” material, a highly inflammable pyrotechnic compound used in the flares to ignite the illuminant. This material was prepared in small quantities by a similar process of screening, grinding and curing.

The flares were assembled in two stages. The first stage was the preparation of ignition pellets. On an assembly line conveyer, metal dies first were filled with illuminant. Then they proceeded on the conveyer belt to the “first fire addition station;” there one worker would remove a die from the belt and place it on a plywood board; another would pour first fire material into the die from a volumetric plastic scoop. The dies then returned to the belt and the materials were pressed into ignition pellets in the dies and ejected. The second step, the assembly of the ignition pellets and other compounds into flares, took place on another assembly line. At the head of the line were placed illuminant cases. Into these three illuminant pellets and an ignition pellet were placed. These candles were then covered to complete the flare.

B

The day of the catastrophe at Building M-132 is remembered as “Black Wednesday” at Woodbine. Shortly before 11:00 a. m., a fire broke out at the first fire addition station. The precise reason for the fire is unknown. It appears, however, to have been caused by friction or impact in the handling of the dies. The operator who poured first fire material into the dies on the plywood board said that fire seemed to come “right from the board itself.” Fires are considered a normal hazard in pyrotechnic production, and there had been small fires on the ignition pellet assembly line at Woodbine during the preceding two months.

This time, the fire spread in a flash chain reaction. The fire traveled along the first fire assembly conveyer from die to die, then spread to an accumulation of ignition pellets at the end of the line. From there it traveled along a corridor, igniting an accumulation of 100 ignition pellets, then a rack of trayed illuminant, then several cans of illuminant pellets. Finally, the fire reached the door of the cure room.3 Inside were 50 pounds of first fire material, 50 pounds of an • intermediate mix, 1400 pounds of ignition pellets, and 8,000 pounds of - trayed illuminant. The illuminant deflagrated,4 [422]*422and almost instantaneously exploded. Building M-132 was destroyed.

Three to four minutes elapsed from the time fire first broke out at the first fire addition station to the time of the explosion. All the employees evacuated the building. Thomas Aretz, one of the plaintiffs in this case, made a brief, futile attempt to fight the fire. The employees observed a series of two small explosions and then a massive explosion and a large fireball. The explosion scattered debris as far as 4200 feet. Thomas Aretz was thrown 175 feet. Some employees were killed or injured by the blast, others by the fireball.

A thorough report by a Thiokol investigating team identified three causes of the accident. First, the hazard classification of the illuminant underestimated the danger of an explosion. Second, the materials within Building M-132 were too close together, and operated as a fuse from the first fire addition station to the cure room. And third, the fire protection system in the building was unable to contain the initial fire. An investigation by the Bureau of Alcohol, Tobacco, and Firearms reached similar conclusions.

C

The manufacture of the flares in Building M-132 was taking place under a contract which Thiokol, as a privately owned, privately operated manufacturer, concluded with the Army on December 12, 1969. It called for the manufacture of 754,000 M49 A1 surface trip mines, subject to Army specifications and procurement regulations.

Pursuant to 32 C.F.R § 7-104.79, the contract required that Thiokol comply with Department of Defense Contractor’s Safety Manual for Ammunition, Explosives and Related Dangerous Materials, DOD 4145.-26M.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Bass v. United States
W.D. Missouri, 2019
Estate of Williams By and Through Williams v. Brennan
371 F. Supp. 3d 343 (N.D. Mississippi, 2019)
Connelly v. Veterans Administration Hospital
23 F. Supp. 3d 648 (E.D. Louisiana, 2014)
Banks v. City of New Orleans
628 F. Supp. 2d 686 (E.D. Louisiana, 2009)
Banks v. New Orleans City
620 F. Supp. 2d 741 (E.D. Louisiana, 2009)
Snyder v. United States
504 F. Supp. 2d 136 (S.D. Mississippi, 2007)
Robbins v. Computer Sciences Corp.
486 F. Supp. 2d 581 (S.D. Mississippi, 2007)
United States v. Byron Leonel Portillo
363 F.3d 1161 (Eleventh Circuit, 2004)
Conner ex rel. Conner v. United States
967 F. Supp. 894 (M.D. Louisiana, 1997)
Anderson v. Litzenberg
694 A.2d 150 (Court of Special Appeals of Maryland, 1997)
Childs v. United States
923 F. Supp. 1570 (S.D. Georgia, 1996)
Knight Ex Rel. Brown v. Wal-Mart Stores, Inc.
889 F. Supp. 1532 (S.D. Georgia, 1995)
Johnson v. Sawyer
760 F. Supp. 1216 (S.D. Texas, 1991)
Schneider v. United States
734 F. Supp. 239 (E.D. Louisiana, 1990)
Dube v. Pittsburgh Corning
870 F.2d 790 (First Circuit, 1989)
Thompson v. Dilger
696 F. Supp. 1071 (E.D. Virginia, 1988)

Cite This Page — Counsel Stack

Bluebook (online)
604 F.2d 417, 1979 U.S. App. LEXIS 11192, Counsel Stack Legal Research, https://law.counselstack.com/opinion/eleanore-higginbotham-aretz-v-united-states-of-america-thomas-f-aretz-v-ca5-1979.