Department of Transportation v. Dalton Paving & Construction, Inc.

489 S.E.2d 329, 227 Ga. App. 207, 97 Fulton County D. Rep. 2369, 1997 Ga. App. LEXIS 795
CourtCourt of Appeals of Georgia
DecidedJune 17, 1997
DocketA97A1222
StatusPublished
Cited by36 cases

This text of 489 S.E.2d 329 (Department of Transportation v. Dalton Paving & Construction, Inc.) is published on Counsel Stack Legal Research, covering Court of Appeals of Georgia primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Department of Transportation v. Dalton Paving & Construction, Inc., 489 S.E.2d 329, 227 Ga. App. 207, 97 Fulton County D. Rep. 2369, 1997 Ga. App. LEXIS 795 (Ga. Ct. App. 1997).

Opinion

Eldridge, Judge.

Appellant, the Georgia Department of Transportation (“DOT”), challenges a jury verdict for appellee, Dalton Paving & Construction (“Dalton Paving”), in a highway construction contract dispute. In asserting 27 enumerations of error, DOT attempted to have this Court reexamine every aspect of this case, from the admissibility of evidence and the failure to give certain jury charges to the weight of evidence presented and the credibility of witnesses. Although this Court refuses to invade the province of the trial court and the jury by retrying the case in its entirety, we must, in an effort to fairly and effectively resolye the issues on appeal, review the sequence of events leading to the jury verdict for appellee.

The facts, viewed in a light most favorable to the jury’s verdict, Dept. of Transp. v. Blair, 220 Ga. App. 342, 343 (469 SE2d 446) (1996), are as follows: in 1989, appellee Dalton Paving contracted with appellant DOT for the reconstruction of a state road (SR 146) as it passed under Interstate 75 in Catoosa County.

DOT began planning for the construction prior to 1987, and a Field Plan Review Inspection was conducted on March 6, 1987. The inspection report refers to potential problems with the grade change at Ramps B and C, in that the project required a four and one-half foot drop or “cut” in the grading, thereby impeding access to the ramps during construction, and that the bridge embankments did not allow sufficient width for an additional temporary lane to provide for traffic flow during the project. The DOT transportation engineer who prepared the inspection report presented three alternatives for *208 dealing with the problems, including (1) temporarily closing the interchange, (2) keeping a single lane open to two-way traffic and utilizing flagmen or traffic signals to direct traffic, or (3) staging construction so that two-way traffic is re-routed onto one side of the interchange while work is conducted on the other side, then switching sides. The engineer opined that the third alternative “would be the most hazardous of the alternatives . . . and the least recommended of the three alternates.” Further, the inspection report recommended that “the contractor be provided an opportunity for a separate alternate at the Preconstruction Conference that would have to be approved by DOT from a variation of one of the above listed alternates.” (Emphasis supplied.)

On August 1, 1989, DOT engineers recognized that the construction plan was still incomplete and that DOT “should clarify the staging of the construction of Ramps B, C, and D.” Shortly thereafter, DOT solicited bids for the project, even though DOT had not provided the necessary clarification of the construction plan. Appellee acquired bid documents for the project, visited the site, and submitted a bid in the amount of $915,285.22, which was 95.8 percent of DOT’s cost estimate of $955,207.50. DOT accepted appellee’s bid on September 1, 1989.

A preconstruction conference was held on October 18, 1989 “for the purpose of discussing and familiarizing [all parties] with the various construction details” of the project. At the meeting, Tommy Patterson of Dalton Paving asked for clarification concerning the construction on Ramp B and the resultant grade changes, saying that “I have not found out any provisions for the ramps, as far as what to do with traffic.” Mike Long, a DOT engineer, responded that Ramp B was the “only problem ramp we have on 146,” and that Dalton Paving would have to do the construction “[i]n phases, you will have to maintain traffic there.” When more questions were asked by Patterson, DOT turned off the tape recorder, so the discussion between the parties intentionally was unrecorded by DOT. However, when recorded discussion resumed, John Rakestraw, another DOT engineer, said that “the project has three phases of construction and the phases should be set up to handle it, if there should be some problems arise [sic] on the construction, then it will have to be handled out there on construction to keep the traffic flowing, is that pretty well what we said?” (Emphasis supplied.) Patterson responded, “Sounds wonderful,” and the meeting was adjourned. Thus ended the preconstruction conference, wherein the contractor was supposed to have an “opportunity” to discuss a separate alternative.

On May 29, 1990, the Federal Highway Administration (“FHWA”) conducted an intermediate inspection of the project and found the quality of the work to be “satisfactory.” The inspection *209 report noted, however, that the “stage construction plans do not provide staging requirements for construction of the ramp terminals. The grades of all of the ramp terminals are being lowered when the grade for SR146 is lowered. A section of the ramp must be used to maintain traffic during each stage of construction. There is not enough informotion on the traffic control plans to detail the sequence of operations to maintain traffic on the ramps and construct the ramps to the new grades. The contractor will he required to provide a traffic control plan that will detail the sequence of operations he will perform to complete the construction of the ramps .” (Emphasis supplied.)

On June 4, 1990, appellee notified DOT that it would be “impossible” to construct the interchange around Ramp B according to the original DOT traffic control plan contained in the bid documents and upon which appellee had relied in submitting its bid. DOT responded that any changes to the original plan would be appellee’s responsibility and asserted that appellee requested the revision to the traffic control plan due to appellee’s error in construction of temporary pavement, asserting that appellee did not widen the pavement enough to accommodate the existing traffic control plans. DOT’s position is further clarified in a July 26, 1990 FHWA inspection report, which states that DOT “informed the contractor that since the change is required due to an error on the part of the contractor that he is responsible for developing an acceptable traffic control plan and that he will be responsible for all the additional expense for the new traffic sequence.”

Pursuant to these instructions, appellee submitted an alternate traffic control plan for DOT’s approval on August 2, 1990. In this letter, appellee also notified DOT that, because of the “erroneous Georgia DOT traffic control plan,” they had sustained “additional direct job expenses,” and asked DOT to extend the time for completion of the project so that a “workable” traffic plan could be approved.

DOT considered appellee’s proposed plan and, in an August 6, 1990 memo between DOT engineers, DOT noted that the “main problem to be addressed is Westbound traffic wanting to go South on 1-75. The difference in grade (3'+) makes it difficult for [westbound lane] traffic to turn left.” No mention was made of any purported mistake on the part of appellee in its alleged failure to pave the road to the appropriate width.

On August 10, 1990, appellee sent a letter to DOT, asserting that any alleged paving problem “can be easily corrected,” and noting that DOT had previously inspected and accepted the paving.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Georgia Department of Labor v. Rtt Associates, Inc.
786 S.E.2d 840 (Supreme Court of Georgia, 2016)
Western Surety Co. v. Department of Transportation
757 S.E.2d 272 (Court of Appeals of Georgia, 2014)
Velma Veasley v. Monitronics International, Inc.
Court of Appeals of Georgia, 2013
Monitronics International, Inc. v. Veasley
746 S.E.2d 793 (Court of Appeals of Georgia, 2013)
Georgia Transmission Corp. v. Worley
720 S.E.2d 305 (Court of Appeals of Georgia, 2011)
Stubbs v. DUBOIS
702 S.E.2d 32 (Court of Appeals of Georgia, 2010)
Royalston v. Middlebrooks
696 S.E.2d 66 (Court of Appeals of Georgia, 2010)
RHL PROPERTIES, LLC v. Neese
668 S.E.2d 828 (Court of Appeals of Georgia, 2008)
Hathaway Development Co. v. Advantage Fire Sprinkler Co.
659 S.E.2d 778 (Court of Appeals of Georgia, 2008)
Tensar Earth Technologies, Inc. v. City of Atlanta
598 S.E.2d 815 (Court of Appeals of Georgia, 2004)
Rice v. Lost Mountain Homeowners Assoc.
604 S.E.2d 215 (Court of Appeals of Georgia, 2004)
Commercial & Military Systems Co. v. Sudimat, C.A.
599 S.E.2d 7 (Court of Appeals of Georgia, 2004)
Patton v. Turnage
580 S.E.2d 604 (Court of Appeals of Georgia, 2003)
Barranco v. Welcome Years, Inc.
579 S.E.2d 866 (Court of Appeals of Georgia, 2003)
Advance Tufting, Inc. v. Daneshyar
577 S.E.2d 90 (Court of Appeals of Georgia, 2003)
Wolf Camera, Inc. v. Royter
558 S.E.2d 797 (Court of Appeals of Georgia, 2002)
Rapid Group, Inc. v. Yellow Cab of Columbus, Inc.
557 S.E.2d 420 (Court of Appeals of Georgia, 2001)
Wingate Land & Development, LLC v. Robert C. Walker, Inc.
558 S.E.2d 13 (Court of Appeals of Georgia, 2001)

Cite This Page — Counsel Stack

Bluebook (online)
489 S.E.2d 329, 227 Ga. App. 207, 97 Fulton County D. Rep. 2369, 1997 Ga. App. LEXIS 795, Counsel Stack Legal Research, https://law.counselstack.com/opinion/department-of-transportation-v-dalton-paving-construction-inc-gactapp-1997.