David McKean v. Yates Engineering Corporation

200 So. 3d 431, 2016 Miss. LEXIS 385, 2016 WL 4919802
CourtMississippi Supreme Court
DecidedSeptember 15, 2016
DocketNO. 2013-CT-01807-SCT
StatusPublished
Cited by3 cases

This text of 200 So. 3d 431 (David McKean v. Yates Engineering Corporation) is published on Counsel Stack Legal Research, covering Mississippi Supreme Court primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
David McKean v. Yates Engineering Corporation, 200 So. 3d 431, 2016 Miss. LEXIS 385, 2016 WL 4919802 (Mich. 2016).

Opinion

ON WRIT OF CERTIORARI

KING, JUSTICE,

FOR THE COURT:

¶ 1. During the construction of Jeff Anderson Regional Medical Center’s (“ARMC”) “Medical Towers III” expansion in Meridian, scaffolding built by W.G. Yates & Sons Construction Company (“Yates Construction”) collapsed, injuring David McKean, Francesco Medina, Donald Arrington, and Wayne Robertson (collectively, the “plaintiffs”). The trial court granted summary judgment and dismissed the plaintiffs’ claims against all defendants. The Court of Appeals affirmed the decisions of the trial court. Athough we agree with the Court of Appeals’ decision to affirm the trial court, we now grant certiora-ri to clarify two issues: (1) whether this Court has adopted the seven-factor test used in Hanna v. Huer, Johns Neel, Rivers, & Webb, 233 Kan. 206, 662 P.2d 243 (1983) swperceded by statute, as recognized in Edwards v. Anderson Engineering, Inc., 284 Kan. 892, 166 P.3d 1047 (2007), to determine whether an architect’s supervisory powers go beyond the provisions of the contract; and (2) to clarify this Court’s position on the effect of an “undocumented *433 immigrant” status on recovery for workplace injuries.

FACTS AND PROCEDURAL HISTORY

¶2. ARMC planned the “Medical Towers III” expansion to be a multi-story building located in Meridian. ARMC hired Foil Wyatt Architects and Planners PLLC (Foil Wyatt) to design the expansion and hired Yates Construction to act as the general contractor for the project. Yates Construction then hired Spectrum II as the subcontractor for concrete services. The plaintiffs were employed by Spectrum II. Construction on the expansion began in 2008. In order to complete the second floor of the building, Yates Construction asked Yates Engineering Corporation (“YEC”) to provide design drawings for a temporary scaffolding used to support the second floor concrete slab during construction.

¶ 3. The Court of Appeals stated:

As of September 2008, the first-story reinforced concrete slab had been poured, and Yates Construction was preparing to pour the concrete walls and columns that would help support the elevated second-story reinforced concrete slab. Yates Engineering became involved in the construction project when Dan Perry, Yates Construction’s general superintendent, asked engineer Ted Pope to prepare design drawings of the scaffolding and second-story form-work. During late September 2008, Pope visited the construction site and -met with Mike Clark, a construction supervisor for Yates Construction. Pope noticed some formwork for the first-story concrete columns and walls, but he did not see any scaffolding for the second-story formwork.
During Pope’s visit, he and Clark discussed some of the necessary features of the scaffolding, such as the need for wooden 4"x4" posts and stringers, and 2"x4" joists. Pope prepared his prelimi-riary design drawings, and submitted them for comments to Yates .Construction on October ■ 3, 2008. Meanwhile, Yates Construction had begun building the scaffolding before receiving Pope’s design drawings.
It is undisputed that Pope’s plan was fundamentally flawed in one significant way-it contemplated using twenty-four-foot posts. However, wooden 4"x4" posts are not available in that length. Consequently, the posts would have to be “tiered” by stacking them end to end and “spliced” for stability. Despite the fact that Pope’s plan was effectively impossible to' follow, Yates Construction had no comments about Pope’s design. ■ Yates Construction asked Pope to send a.final version of his design drawings. Pope complied on October 6, 20[08]. However, Yates Construction ignored essential features of Pope’s scaffolding design.

McKean v. Yates Engr. Corp., No. 2013-CA-01807-COA, — So.3d —, —, 2015 WL 5118062, at *1 (Miss.Ct.App. Sept. 1, 2015), reh’g denied (Mar. 1, 2016). On November 17, 2008, the plaintiffs were attempting to pour an elevated concrete slab' for the second floor. As the concrete was being poured, the wooden scaffolding collapsed and caused injury to the plaintiffs. It is undisputed that the scaffolding caused the collapse and not the formwork.

¶ 4. The plaintiffs filed suit against Yates Construction on September 1, 2010, claiming that Yates Construction negligently failed to construct the scaffolding and related structures in accordance with plans and specifications. - In February 2011, the plaintiffs amended their complaint to add Yates Engineering and Foil Wyatt as defendants. The plaintiffs alleged that Yates Engineering and Foil Wyatt negligently failed to formulate plans and specifications *434 for the scaffolding, negligently failed to inspect the scaffolding, and failed to correct known deficiencies in the scaffolding.

¶ 5. American Resources Insurance Company Inc. filed a declaratory-judgment action in the United States District Court for the Southern District of Mississippi. In March 2012, the district court held that Yates Construction was Spectrum II’s statutory employer. Because Yates Construction had secured workers’ compensation insurance coverage for the plaintiffs, the circuit court dismissed the plaintiffs’ suit against Yates Construction pursuant to- the exclusive remedy provision of the Mississippi Workers’ Compensation Act. In June 2012, the plaintiffs filed a second amended complaint, adding ARMC as a defendant and claiming that ARMC negligently failed to require a written contract with Yates Construction, negligently failed to supervise and inspect Yates Construction’s work, and failed to maintain the premises in a reasonably safe condition and warn the plaintiffs of dangers.

¶ 6. Yates Engineering, joined by ARMC, filed a motion for summary judgment against plaintiff Medina, claiming that because Medina allegedly was not an American citizen and was therefore not lawfully employed, his claims should be dismissed due to his activity at the time of the accident. On February 20, 2013, the trial court dismissed Francesco Medina’s claims. The circuit court then granted summary judgment in favor of Foil Wyatt, finding that Foil Wyatt had no duty to inspect the scaffolding. The Court of Appeals stated:

In August 2013, the circuit , court granted summary judgment in favor of Yates Engineering. The circuit court’s decision was based on its conclusion that “[a]t no point in time did Yates Engineering assume the duty [to] inspect or supervise the construction and implementation of its design drawings either by contract or conduct.” The circuit court later granted ARMC’s motion for summary judgment. According to the circuit court, “no genuine issue of material fact remains with respect to ' Plaintiffs’ claims against [ARMC], and therefore, [ARMC] is entitled to summary judgment on Plaintiffs’ claims against it.” The circuit court also entered a final judgment on that date.

McKean, No. 2013-CA-01807-COA, — So.3d at -, 2015 WL 5118062, at *3.

¶7. The plaintiffs appealed and argued that the trial court erred in granting summary judgment to Foil Wyatt, Yates Engineering, and ARMC.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Cite This Page — Counsel Stack

Bluebook (online)
200 So. 3d 431, 2016 Miss. LEXIS 385, 2016 WL 4919802, Counsel Stack Legal Research, https://law.counselstack.com/opinion/david-mckean-v-yates-engineering-corporation-miss-2016.