Corp. of Presiding Bishop of Church of Jesus Christ of Latterday Saints v. Cavanaugh

217 Cal. App. 2d 492, 32 Cal. Rptr. 144, 1963 Cal. App. LEXIS 1929
CourtCalifornia Court of Appeal
DecidedJune 24, 1963
DocketCiv. 25485
StatusPublished
Cited by20 cases

This text of 217 Cal. App. 2d 492 (Corp. of Presiding Bishop of Church of Jesus Christ of Latterday Saints v. Cavanaugh) is published on Counsel Stack Legal Research, covering California Court of Appeal primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.

Bluebook
Corp. of Presiding Bishop of Church of Jesus Christ of Latterday Saints v. Cavanaugh, 217 Cal. App. 2d 492, 32 Cal. Rptr. 144, 1963 Cal. App. LEXIS 1929 (Cal. Ct. App. 1963).

Opinion

FORD, J.

The defendants Cavanaugh and Plastic Process Company have appealed from a judgment 1 in an action arising out of the failure of a radiant heating system which was installed in the plaintiff’s church, to function properly. Cavanaugh was the contractor who made the installation. *497 The plastic tubing or pipe which proved to be inefficient for the particular use was manufactured by Plastic Process Company.

The findings of fact of the trial court were in part as follows: 1. On July 9, 1953, the plaintiff and Cavanaugh entered into a written contract for the installation of a radiant heating system “per plans and specifications by William Craig.” It was provided therein that Cavanaugh “shall guarantee all materials and workmanship for a period of one year from completion date.” 2. The plaintiff performed all of the terms of the contract except the payment of the sum of $1,319.44. 3. Cavanaugh installed the heating system “in good and workmanlike manner and in accordance with the plans and specifications except that it did not and could not be made to pass the pressure tests provided for in the specifications and the system did not and could not be made to maintain any steady pressure for any appreciable length of time and it did not and could not be made to heat the building. That the reason that the system would not pass the pressure test or hold any pressure or heat the building was because the materials used and which had been purchased by the defendant Cavanaugh from the defendant Plastic Process were unsuited for radiant heating when embodied in concrete. The materials, therefore, were defective.” 4. The reasonable and actual cost to the plaintiff for the replacement of the defective plastic pipe with copper tubing and for rebuilding the floor was $15,100. If copper tubing had been used initially, the cost would have been $800 more than the amount set forth in the plaintiff’s contract with Cavanaugh and, “therefore, plaintiff was damaged by reason of the defective material in the amount of $14,300.00.” 5. Cavanaugh represented and warranted to the plaintiff that “the materials to be used in said heating system were capable of and would perform the same functions and with the same efficiency as copper tubing and that they were in all respects sound, adequate and free from defects.” 6. The plaintiff was “ignorant of the falsity of such representations and warranties and was unable and did not have access to the truth concerning them and relied on such representations and warranties in permitting the use of plastic tubing in lieu and in place of copper tubing.” 7. The plaintiff “did not discover or have any knowledge of the defective condition of said tubing and of the fact that it was inadequate until on or about April 20, 1956.” 8. The defendant Plastic Process Company sup *498 plied the tubing described as Plastipipe No. 110 which was used by Cavanaugh in installing the heating system. 9. Prior to the execution of the contract between the plaintiff and Cavanaugh and prior to the time when the tubing was sold by Plastic Process Company to Cavanaugh and installed in the plaintiff’s, building, Plastic Process Company represented to the plaintiff and its agents and to Cavanaugh that the plastic tubing manufactured and supplied by Plastic Process Company could be used in lieu of and in place of copper tubing in a radiant heating system embedded in concrete and would be suitable for the purpose and free from defects. Plastic Process Company “represented and warranted that the plastic tubing would be satisfactory and adequate in every respect for the purpose for which it was intended to be used, namely as tubing embedded in concrete in a radiant heating system.” The plaintiff relied upon those representations and was unable to investigate the truth or falsity thereof. 10. In reliance upon the representations and warranties, “the plaintiff through its architect and duly authorized agents, specified plastic tubing and other materials manufactured by” Plastic Process Company and had Cavanaugh “install same in the church as part of the heating system.” 11. The warranties and representations made by Plastic Process Company “were made to the public generally and to the .trade including architects, engineers and heating contractors with the hope, expectation and intention that members of the trade would specify their use and would relay the warranties and representations made by said defendant to the ultimate consumer such as plaintiff. That in reliance upon these representations and warranties, plaintiff through its architect Thomas and through the engineer Craig employed by its architect who designed and engineered the heating system, relied upon said warranties and representations and did so design the heating system as to call for the use of the products of defendant Plastic Process Co.” Those warranties “were made in printed advertising material put out to the trade and the public generally and to the persons in the position of plaintiff.” 1-2. By reason of the specification by the plaintiff “through its architect and engineer, through its heating contractor, D. C. Cavanaugh, plaintiff purchased from defendant Plastic Process Co., the materials which were used in the heating system.” 13. The plastic tubing “was defective and unsatisfactory for the purpose for which it was used and for which it had been sold and did not perform as represented and *499 warranted by defendants, in that among other things, it tended ’ to' split' ór crack by reason of shrinkage when embedded in concrete especially at bends and at points where its fittings would not permit it to move with the concrete”; it was, therefore, “unsatisfactory and unsuitable for the purpose for which it was sold.” 14. These defects “were latent and unknown to plaintiff and plaintiff had no way., of knowing of them and of the unsuitable and unsatisfactory condition of-said plastic tubing when embedded in.concrete until- on or about April 20, 1956 when it learned that, the plastic tubing was not suitable, but that it was not until much later that plaintiff learned the reason for its unsuitability.” 15. “ [IImmediately upon discovery of said defect, plaintiff gave timely notice to defendants.”

Judgment was rendered in favor of the' plaintiff against Cavanaugh for the sum of $12,980.56 and against Plastic Process Company for $14,300.

With respect to the cross-complaint filed by Cavanaugh against Plastic Process Company, the findings of fact were in part as follows: 1. In the contract between Cavanaugh and the plaintiff church, it was provided that the installation of the radiant heating system was to be in accordance with plans and specifications prepared for the plaintiff church by its architect. Those plans and specifications “provided and required that the radiant heating panels so installed be of % inch ‘ #110 Plastipipe, ’ a trade named article manufactured exclusively by Cross-Defendant Plastic Process Company.” 2. By the terms of that contract Cavanaugh “agreed and guaranteed that the materials used be of standard grade unless otherwise specified, and that the said materials used would be those specifically required by the specifications of the church.” 3. Cavanaugh made the installation “in a good and workmanlike manner.” The “material furnished and installed was of standard grade, free from visible defects and in accordance with the specifications.” 4.

Free access — add to your briefcase to read the full text and ask questions with AI

Related

Ballesteros v. Ford Motor Co.
California Court of Appeal, 2025
Davis v. Nissan North America, Inc.
California Court of Appeal, 2024
Scriber v. Ford Motor Company
S.D. California, 2023
Yeh v. Super. Ct.
California Court of Appeal, 2023
Ford Motor Warranty Cases
California Court of Appeal, 2023
Kim Ngo v. Bmw of North America, LLC
23 F.4th 942 (Ninth Circuit, 2022)
Keegan v. American Honda Motor Co.
838 F. Supp. 2d 929 (C.D. California, 2012)
Fieldstone Co. v. Briggs Plumbing Products, Inc.
54 Cal. App. 4th 357 (California Court of Appeal, 1997)
St. Joseph Hospital v. Corbetta Construction Co.
316 N.E.2d 51 (Appellate Court of Illinois, 1974)
Sunbeam Construction Co. v. Fisci
2 Cal. App. 3d 181 (California Court of Appeal, 1969)
Grinnell v. Charles Pfizer & Co.
274 Cal. App. 2d 424 (California Court of Appeal, 1969)
Nomellini Construction Co. v. Harris
272 Cal. App. 2d 352 (California Court of Appeal, 1969)
Harris v. Belton
258 Cal. App. 2d 595 (California Court of Appeal, 1968)
McCormack v. Hankscraft Company
154 N.W.2d 488 (Supreme Court of Minnesota, 1967)
Holmes Packaging MacH. Corp. v. Bingham
252 Cal. App. 2d 862 (California Court of Appeal, 1967)
Kurland v. United Pacific Insurance
251 Cal. App. 2d 112 (California Court of Appeal, 1967)
Leininger v. Stearns-Roger Manufacturing Company
404 P.2d 33 (Utah Supreme Court, 1965)
MacK v. Hugh W. Comstock Associates, Inc.
225 Cal. App. 2d 583 (California Court of Appeal, 1964)

Cite This Page — Counsel Stack

Bluebook (online)
217 Cal. App. 2d 492, 32 Cal. Rptr. 144, 1963 Cal. App. LEXIS 1929, Counsel Stack Legal Research, https://law.counselstack.com/opinion/corp-of-presiding-bishop-of-church-of-jesus-christ-of-latterday-saints-v-calctapp-1963.