City of Greeley v. Foster

32 Colo. 292
Supreme Court of Colorado·Decided January 15, 1904·No. No. 4412·Published·Cited by 14 cases

Opinion

Mr. Justice Campbell

delivered the opinion of the court.

Action to recover damages for personal injuries due to the negligence of the defendant. Judgment for plaintiff. Defendant appeals. A tile drain, which had been laid in one of the streets of the defendant city, proving inadequate for the purpose for which it was constructed, the city determined to take it up and put in a. larger one. This made it necessary to dig in the street above the old drain a ditch three feet wide and six feet deep. The work was done in the late winter and early spring by the city itself, under the immediate supervision of H. P. Heath, one of the members of the city council. The ground was thoroughly saturated with water, and a steam engine was used to pump this water out of the ditch and the manholes as the work was carried on. The old tile were also filled with water, which was poured into the trench as they were taken up, and the water, warmed somewhat by the escaping steam, was constantly flowing through the ditch, which caused the edges of the ditch at the bottom to be loosened, and thus withdrew support from the overhanging soil. In digging the trench to prevent caving of its sides which, for the reasons mentioned, occurred at dif[295] ferent points of the work,, from the beginning to the end, the sides were shored or sheeted. This sheeting consisted of boards or pilings placed, upright against both sides of the trench and driven into the soil at the bottom, along which, horizontally, 1.6-foot stringers were laid, which in turn were held in place by cross-braces. The city at all times furnished, in close proximity to the ditch, suitable and abundant material for properly curbing it.

The plaintiff, as the complaint alleges, was employed as a day laborer in all the work of excavating the trench and relaying the drain tile, and for such other work in that connection as was ordinarily required. At the trial, plaintiff testified that he was employed to do whatever work was necessary to be done in and about the digging of the trench, the removing of the tile, leveling the bottom thereof for the reception of the new tile, sheeting or curbing the trench, relaying the new tile, and filling in the trench when the same was laid. The plaintiff had been doing this kind of work for a period of‘about thirty days, and although he had never been engaged in similar work before, was entirely familiar with the nature of the soil in which the trench was dug, was aware that in digging the same its banks or sides had fallen in or exhibited that tendency, and that material had been furnished by the city for safeguarding it, knew what the sheeting was put in for, had assisted in putting it in, and, as different sections were completed, in taking it out. In short, he had, in all respects, as much knowledge of the nature and character of the work and the dangers incident thereto as the foreman himself.

The work was done in sections, and as fast as one section was completed and new tile laid, the ditch was filled in with earth and a new section begun. When the accident which resulted in plaintiff’s injury [296] occurred, the trench had been completed and filled in with the exception of about thirty feet at one end, and the only work left to be done was the laying of tile, or connecting that already laid with a manhole. About half an hour before the injury was received, plaintiff was working at a manhole at the extreme end of the ditch, and was then called from this place by the foreman to go to the unfinished section of the trench to do whatever was necessary in completing it. For nearly thirty minutes he ‘was engaged in wheeling dirt from or near the manhole, about thirty feet distant, and dumping it into the unfinished trench, and in doing so necessarily saw its condition. By the order of the foreman, given some time in the morning of this day, the stringers, cross-braces, and the uprights on the south side had been removed, so that the workmen could dump the dirt into the trench, instead of shoveling it over the piling that extended several' feet above the natural surface. The north side gave evidence of caving, which was called to the attention of the foreman, and he determined to replace the curbing, in order to make the place safe for the workmen to finish the work of laying or connecting the tile. About five minutes before the injury occurred, when some one on top called out that caving had begun, plaintiff and others stopped the work they were then doing, and the foreman directed plaintiff to go down into the trench and assist a fellow-laborer named Thomas, who was already therein, in replacing the cross-braces. In obedience to the order, plaintiff got down into the trench, and was holding one end of a stringer, the other end of which was held by Thomas, and, while they were attempting to put in the cross-braces, the earth from the north bank caved in and fell against plaintiff, pinning him against the south wall, and thus caused the injuries complained of.

[297] No evidence was introduced by the defendant, and the case was submitted to the jury upon that of the plaintiff and Ms witnesses. In bis examination in chief, plaintiff was of the impression that he was ordered into the trench for the purpose of removing a plank, so as to make level the bottom of the trench on which the plank was to be laid for the reception of the tile; but, by his cross-examination and the testimony of Ms own witnesses, it is clearly established that he was ordered by the foreman to go into the trench, and knew that he was sent into it, for the express purpose of making it a safe place. If this -were not so, plaintiff learned that such was the work he was to do at once after getting into the ditch, and in ample time to get out of it to escape the danger which he necessarily saw was threatened.

Free access — add to your briefcase to read the full text and ask questions with AI

City of Greeley v. Foster, 32 Colo. 292 (Colo. 1904).

32 Colo. 292 (City of Greeley v. Foster) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Related

Colorado Milling & Elevator Co. v. Bright
231 P. 1111 (Supreme Court of Colorado, 1924)
Denver & Rio Grande Railroad v. Thompson
65 Colo. 4 (Supreme Court of Colorado, 1917)
Creede United Mines Co. v. Hawman
23 Colo. App. 125 (Colorado Court of Appeals, 1912)
Acme Cement Plaster Co. v. Westman
122 P. 89 (Wyoming Supreme Court, 1912)
Jackson v. Yak Mining, Milling & Tunnel Co.
51 Colo. 551 (Supreme Court of Colorado, 1911)
Garnet Ditch & Reservoir Co. v. Sampson
110 P. 79 (Supreme Court of Colorado, 1910)
Portland Gold Mining Co. v. O'Hara
45 Colo. 416 (Supreme Court of Colorado, 1909)
Maloney v. Florence & Cripple Creek Railroad
39 Colo. 384 (Supreme Court of Colorado, 1907)
Caughlin v. Campbell-Sell Baking Co.
39 Colo. 148 (Supreme Court of Colorado, 1907)
Cripple Creek Sampling & Ore Co. v. Souza
37 Colo. 393 (Supreme Court of Colorado, 1906)
Cripple Creek Mining Co. v. Brabant
37 Colo. 423 (Supreme Court of Colorado, 1906)
City of Denver v. Spencer
34 Colo. 270 (Supreme Court of Colorado, 1905)
Poorman Silver Mines of Colorado, Ltd. v. Devling
34 Colo. 37 (Supreme Court of Colorado, 1905)