Alliance for the Wild Rockies v. Cottrell

622 F.3d 1045, 2010 WL 3665149
Court of Appeals for the Ninth Circuit·Decided July 28, 2010·No. No. 09-35756·Published·Cited by 61 cases

Opinions

Opinion by Judge WILLIAM A. FLETCHER; Concurrence by Judge MOSMAN.

ORDER

The opinion filed July 28, 2010, and published at 613 F.3d 960 (9th Cir.2010), is amended as follows:

On 613 F.3d at 968, immediately below line 21, before section heading “B. Preliminary Injunction,” add new paragraph:

To the extent prior cases applying the “serious questions” test have held that a preliminary injunction may issue where the plaintiff shows only that serious questions going to the merits were raised and the balance of hardships tips sharply in the plaintiffs favor, without satisfying the other two prongs, they are superseded by Winter, which requires the plaintiff to make a showing on all four prongs. See Miller v. Gammie, 335 F.3d 889, 900 (9th Cir.2003) (en banc). For the reasons that follow, however, we hold that the “serious questions” approach survives Winter when applied as part of the four-element Winter test. Therefore, “serious questions going to the merits” and a hardship balance that tips sharply towards the plaintiff can support issuance of an injunction, so long as the plaintiff also shows a likelihood of irreparable injury and that the injunction is in the public interest.

OPINION

W. FLETCHER, Circuit Judge:

Alliance for the Wild Rockies (“AWR”) appeals the district court’s denial of its motion for a preliminary injunction. AWR seeks to enjoin a timber salvage sale proposed by the United States Forest Service. Citing Winter v. Natural Resources Defense Council, — U.S. -, 129 S.Ct. 365, 172 L.Ed.2d 249 (2008), the district court held that AWR had not shown the [1047]*1047requisite likelihood of irreparable injury and success on the merits. After hearing oral argument, we issued an order reversing the district court and directing it to issue the preliminary injunction. Alliance for Wild Rockies v. Cottrell, 385 Fed.Appx. 683 (9th Cir.2010). In this opinion, we now set forth the reasons for our reversal, and we take this opportunity to clarify an aspect of the post-Wmier standard for a preliminary injunction.

I. Background

In August and September of 2007, the Rat Creek Wildfire burned about 27,000 acres in the Beaverhead-Deerlodge National Forest in Montana. On July 1, 2009, almost two years later, the Chief Forester of the Forest Service made an Emergency Situation Determination for the Rat Creek Salvage Project (“the Project”). The Emergency Situation Determination permitted the immediate commencement of the Project’s logging without any of the delays that might have resulted from the Forest Service’s administrative appeals process.

The Project permits salvage logging of trees on approximately 1,652 of the 27,000 acres that were burned. The logging will take place (and to some degree has already taken place) on thirty-five units of land ranging from 3 to 320 acres in size. The Forest Service describes the purpose of the Project as follows:

... to recover and utilize timber from trees that are dead or dying as a result of the Rat Creek Wildfire or forest insects and disease and reforest the harvested units with healthy trees appropriate for the site. The trees would supply wood to the forest products industry.

A further purpose is to cut trees infested with dwarf mistletoe to prevent transmission to new trees.

Trees to be cut are those from 4 to 15 inches in diameter at breast height (“dbh”) that have died or are likely to die as a direct result of fire or insect attack. The Forest Service has provided species-specific guidelines for determining likelihood of mortality. For example, Douglas-fir trees from 4 to 15 inches dbh are to be logged if less than 40% of the pre-fire live crown remains. Other conifers are to be logged if less than 80% of the pre-fire live crown remains. The severity of insect attacks is to be determined by examining trees for signs such as pitch tubes or boring dust.

Trees that survived the fire but are infected with dwarf mistletoe are to be cut, regardless of size, unless doing so would reduce the number of live trees below the Forest Service’s wildlife habitat standard. Uninfested live trees, including those with a dbh larger than 15 inches, are to be cut only if required by safety concerns.

The Project requires construction of 7 miles of temporary roads and reconditioning of about 3 miles of existing roads. After completion of the Project, the temporary roads will be obliterated, and the existing roads will be returned to their current uses, if any.

In April 2009, the Forest Service released an Environmental Assessment (“EA”) of the Project for public comment.

On June 15, 2009, the Acting Forest Supervisor for the Beaverhead-Deerlodge National Forest wrote to the Regional Forester requesting that the Chief Forester make an Emergency Situation Determination (“ESD”) in connection with the Rat Creek Project. The ESD request stated that the emergency resulted from “rapid deterioration and decay of trees proposed for salvage harvest,” noting that “[tjrees that have died or are dying from secondary fire effects are rapidly losing then-value and merchantable volume.” The request stated that immediate commencement of logging would “prevent substantial economic loss to the Federal Government.” [1048]*1048The sites to be logged are typically accessible to loggers for only four to five months out of the year due to heavy snowfalls. The request stated that the logging needed to commence immediately so that it could be completed before winter arrived.

The request stated further:

An objective for recovering the value of the fire-killed trees is to respond to local, regional, and national needs for commercial timber products. Local economies in Southwest Montana have developed with natural resource utilization as the foundation. This economic structure continues today and is becoming stressed and increasingly unstable due to higher energy prices, and reduced supply of timber from National Forest System lands. As markets decline and harvest activities on private lands decrease, the timber industry in Montana increasingly depends on National Forest System timber supply as an essential element to keep their mills operational.

On June 22, 2009, the Regional Forester forwarded the request for an ESD to the Chief Forester, noting that a “delay in implementation of activities included in the request would result in substantial loss of economic value to the Federal Government.” On July 1, 2009, the Chief Forester granted the request for an ESD. She wrote:

[A] delay to implementing the project until after any administrative appeals have been reviewed and answered will result in a substantial loss of economic value to the government. Such a delay would push the award of timber sale contracts for the hazard tree and other salvage back to late October 2009, with winter access limitations delaying most operations until summer of 2010. By that time further deterioration of the affected trees will have resulted in a projected loss of receipts to the government of as much as $16,000 and significantly increased the likelihood of receiving no bids. An absence of bids would push the potential loss to the government to $70,000 and eliminate an opportunity to accomplish Douglas-fir planting and dwarf mistletoe control objectives.

Free access — add to your briefcase to read the full text and ask questions with AI

Alliance for the Wild Rockies v. Cottrell, 622 F.3d 1045, 2010 WL 3665149 (9th Cir. 2010).

622 F.3d 1045 (Alliance for the Wild Rockies v. Cottrell) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.