Abbell v. United States
Opinion
Fahy, Circuit Judge,
sitting by designation, delivered the opinion of the court:
This is an action against the United States for damages for alleged breach of a lease agreement entered into between plaintiffs and the United States through the General Serv[557] ices Administration. The factual situation may be summarized as follows. In 1952 the United States Government, acting through the General Services Administration, advertised for bids for the lease of property in New York City. Among those received was one from the plaintiffs offering the Paramount Hotel Building, then being used as a hotel, on an “as is” basis. The defendant could not lease the building “as is” because of appropriation problems that made it impossible for the Government to defray the cost of alterations necessary to convert the building to the use desired. In a note appended to their bid, however, plaintiffs stated that they were willing to negotiate a lease containing a provision for plaintiffs at their expense to make the changes required.
The bids were opened in October 1952. Thereafter representatives of the plaintiffs and of the defendant engaged in negotiations which culminated in the execution in September 1953 of an agreement denominated a “lease.” This instrument provided that “the Lessor hereby leases to the Government” a major portion of the Paramount Hotel, occupancy to be for five years, with two options for renewals of five years each, “following completion of repairs and alterations and renovations as itemized in Paragraphs 17 and 20.” These paragraphs read in pertinent part:
17 (a) * * * Preliminary floor plans and specifications will be furnished by the Government. Upon Lessor’s receipt of the preliminary plans and specifications and executed copy of this lease, the Lessor shall immediately employ, subject to approval of the Government, an architect * * *, to prepare the necessary detailed plans and specifications for the remodeling of the premises as required by the Government and obtain all required permits for the remodeling and certificate of occupancy as an office building * * *. Before Lessor proceeds with the work of remodeling the premises, the architect’s detailed plans and specifications shall be submitted to the Government for review and final approval.
17 (b) All costs, obligations or expenses (hereinafter called “construction costs”) which are attributable to proper prosecution of the remodeling referred to in Paragraph 17 (a) hereof (regardless of whether or not such “construction costs” are pursuant to a written contract) shall be paid by the Government to the Lessors as [558] herein provided. By way of illustration, such, “construction costs” shall include specifically but not exclusively, labor, material, insurance premiums, permits, taxes, * * * contractors’ and sub-contractors’ overhead and profits, architectural and engineering fees, interest upon monies borrowed to finance the cost of the alterations and renovations required under Paragraph 17 (a) above, and all other of the alterations and renovations * * *. Prior to incurring any “construction costs”, exclusive of architect’s fee, and after receipt of the architectural plans and specifications, _ Lessor shall * * * obtain from a minimum of four bidders a total bid on all the work to be accomplished under the architectural plans and specifications, with the Government reserving the right to name at least two of the bidders * * *. Upon receipt of the bids * * * Lessor shall submit same to the Government for approval * * *. If it shall appear that the “construction costs” will exceed Six Hundred Thousand Dollars ($600,000), then the Government, by mutual agreement with the Lessor, may modify all or such part of the plans and specifications as shall be necessary or desirable to reduce the total “construction costs”; provided, however, that nothing contained herein shall be construed to limit the total “construction costs” to Six Hundred Thousand Dollars ($600,000) if the Government, in the manner provided herein, does not elect to limit such costs to Six Hundred Thousand Dollars ($600,000), in which event, any such increase shall be made only with the consent of the Lessor, which consent shall not be unreasonably withheld * * *.
* * * * *
17 (d) At such time as the “construction costs” are ascertained and the building is ready for occupancy, * * * this lease shall be modified by Supplemental Agreement No. 1 in the form attached hereto as “Exhibit A”, which agreement shall provide for payment of the “construction costs” to the Lessor in one hundred and twenty (120) equal monthly installments * * *.
17 (e) In the event this lease shall be terminated for any reason whatsoever at any time during the term of this lease or any renewal thereof, the Government’s obligation to repay the “construction costs” shall not be modified, diminished, or in any other way altered or affected.
[559]*55920. During the continuance of this lease and at no expense to the Government the Lessor shall * * * comply with all applicable municipal ordinances, regulations and statutes relating to buildings and their equipment, and to make or have made such changes as may be required to bring such structure or equipment into conformity with existing codes * * *.
In addition paragraph 14 is material:
14. In performing any work herein required to be done by Lessor, the Lessor agrees to comply with all applicable State, Municipal and Local Laws and the rules, regulations and requirements of any departments and bureaus, and all local ordinances and regulations.
In accordance with paragraph IT (a), the defendant furnished preliminary floor plans and specifications. Plaintiffs employed architects who prepared the detailed plans and specifications. These, however, contained three items not included in the preliminary plans prepared by the defendant,, namely, a truck bay and fire alarm and sprinkler systems* required by New York City zoning ordinances. The truck bay called for extensive and expensive renovation to the superstructure of the building. In all the cost of the renovation as detailed in the architects’ plans would push the cost far above the $600,000 figure. The Government refused to approve the inclusion of the truck bay, fire alarm, and sprinkler items in the detailed plans. A controversy ensued as to who had the responsibility for these costly items. Plaintiffs contend that as these items were necessary to the úse of the building for office purposes the defendant must bear their cost as part of “construction costs”; the defendant contends that the September 1953 agreement contemplated that the defendant pay only for those changes it requested and that the plaintiffs, under paragraphs 14 and 20, were to pay for changes required by city ordinances but not requested for defendant’s use.
Free access — add to your briefcase to read the full text and ask questions with AI
Fahy, Circuit Judge,
sitting by designation, delivered the opinion of the court:
This is an action against the United States for damages for alleged breach of a lease agreement entered into between plaintiffs and the United States through the General Serv[557] ices Administration. The factual situation may be summarized as follows. In 1952 the United States Government, acting through the General Services Administration, advertised for bids for the lease of property in New York City. Among those received was one from the plaintiffs offering the Paramount Hotel Building, then being used as a hotel, on an “as is” basis. The defendant could not lease the building “as is” because of appropriation problems that made it impossible for the Government to defray the cost of alterations necessary to convert the building to the use desired. In a note appended to their bid, however, plaintiffs stated that they were willing to negotiate a lease containing a provision for plaintiffs at their expense to make the changes required.
The bids were opened in October 1952. Thereafter representatives of the plaintiffs and of the defendant engaged in negotiations which culminated in the execution in September 1953 of an agreement denominated a “lease.” This instrument provided that “the Lessor hereby leases to the Government” a major portion of the Paramount Hotel, occupancy to be for five years, with two options for renewals of five years each, “following completion of repairs and alterations and renovations as itemized in Paragraphs 17 and 20.” These paragraphs read in pertinent part:
17 (a) * * * Preliminary floor plans and specifications will be furnished by the Government. Upon Lessor’s receipt of the preliminary plans and specifications and executed copy of this lease, the Lessor shall immediately employ, subject to approval of the Government, an architect * * *, to prepare the necessary detailed plans and specifications for the remodeling of the premises as required by the Government and obtain all required permits for the remodeling and certificate of occupancy as an office building * * *. Before Lessor proceeds with the work of remodeling the premises, the architect’s detailed plans and specifications shall be submitted to the Government for review and final approval.
17 (b) All costs, obligations or expenses (hereinafter called “construction costs”) which are attributable to proper prosecution of the remodeling referred to in Paragraph 17 (a) hereof (regardless of whether or not such “construction costs” are pursuant to a written contract) shall be paid by the Government to the Lessors as [558] herein provided. By way of illustration, such, “construction costs” shall include specifically but not exclusively, labor, material, insurance premiums, permits, taxes, * * * contractors’ and sub-contractors’ overhead and profits, architectural and engineering fees, interest upon monies borrowed to finance the cost of the alterations and renovations required under Paragraph 17 (a) above, and all other of the alterations and renovations * * *. Prior to incurring any “construction costs”, exclusive of architect’s fee, and after receipt of the architectural plans and specifications, _ Lessor shall * * * obtain from a minimum of four bidders a total bid on all the work to be accomplished under the architectural plans and specifications, with the Government reserving the right to name at least two of the bidders * * *. Upon receipt of the bids * * * Lessor shall submit same to the Government for approval * * *. If it shall appear that the “construction costs” will exceed Six Hundred Thousand Dollars ($600,000), then the Government, by mutual agreement with the Lessor, may modify all or such part of the plans and specifications as shall be necessary or desirable to reduce the total “construction costs”; provided, however, that nothing contained herein shall be construed to limit the total “construction costs” to Six Hundred Thousand Dollars ($600,000) if the Government, in the manner provided herein, does not elect to limit such costs to Six Hundred Thousand Dollars ($600,000), in which event, any such increase shall be made only with the consent of the Lessor, which consent shall not be unreasonably withheld * * *.
* * * * *
17 (d) At such time as the “construction costs” are ascertained and the building is ready for occupancy, * * * this lease shall be modified by Supplemental Agreement No. 1 in the form attached hereto as “Exhibit A”, which agreement shall provide for payment of the “construction costs” to the Lessor in one hundred and twenty (120) equal monthly installments * * *.
17 (e) In the event this lease shall be terminated for any reason whatsoever at any time during the term of this lease or any renewal thereof, the Government’s obligation to repay the “construction costs” shall not be modified, diminished, or in any other way altered or affected.
[559]*55920. During the continuance of this lease and at no expense to the Government the Lessor shall * * * comply with all applicable municipal ordinances, regulations and statutes relating to buildings and their equipment, and to make or have made such changes as may be required to bring such structure or equipment into conformity with existing codes * * *.
In addition paragraph 14 is material:
14. In performing any work herein required to be done by Lessor, the Lessor agrees to comply with all applicable State, Municipal and Local Laws and the rules, regulations and requirements of any departments and bureaus, and all local ordinances and regulations.
In accordance with paragraph IT (a), the defendant furnished preliminary floor plans and specifications. Plaintiffs employed architects who prepared the detailed plans and specifications. These, however, contained three items not included in the preliminary plans prepared by the defendant,, namely, a truck bay and fire alarm and sprinkler systems* required by New York City zoning ordinances. The truck bay called for extensive and expensive renovation to the superstructure of the building. In all the cost of the renovation as detailed in the architects’ plans would push the cost far above the $600,000 figure. The Government refused to approve the inclusion of the truck bay, fire alarm, and sprinkler items in the detailed plans. A controversy ensued as to who had the responsibility for these costly items. Plaintiffs contend that as these items were necessary to the úse of the building for office purposes the defendant must bear their cost as part of “construction costs”; the defendant contends that the September 1953 agreement contemplated that the defendant pay only for those changes it requested and that the plaintiffs, under paragraphs 14 and 20, were to pay for changes required by city ordinances but not requested for defendant’s use.
This controversy was unresolved by the parties and demonstrates the difficulty we find with the plaintiffs’ position. Their position is that the September 1953 agreement was a, completed, legally operative lease which called for performance by defendant, failing in which they are entitled to damages for its breach. Yet there were the above-mentioned [560] items of major importance unsettled by the agreement of September 1953. While it is true that in November 1952 defendant had furnished to plaintiffs an outline description of the alterations it would require, until these could be embodied in specific plans it could not be known what alterations were actually to be made and paid for by defendant. Neither party had investigated zoning requirements, which intervened to lift the costs very substantially. To the extent agreement had been reached it contemplated a cost ceiling far less than was possible under the architect’s detailed plans and specifications, which were never approved.
To find defendant responsible for breach of agreement in refusing to go forward when so much remained unsettled would require the court itself to write a major portion of the agreement. This it should not do. See Fremon v. W. A. Sheaffer Pen Co., 209 F. 2d 627 (8th Cir.); National Bank v. Louisville Trust Co., 67 F. 2d 97, 102 (6th Cir.); Bonk v. Vozajian, 128 Cal. App. 2d 155, 274 P. 2d 948; 1 Williston, Contracts § 45 (3d ed. 1957). Though denominated a lease, with words of demise,1 the September 1953 agreement, in the situation we have explained, was not a final, enforceable lease or other agreement evidencing a meeting of the minds of the parties. Kerr Glass Mfg. Corp. v. Elizabeth Arden Sales Corp., 61 Cal. App. 2d 55, 141 P. 2d 938; See Mid-Continent Pet. Corp. v. Russell, 173 F. 2d 620 (10th Cir.); American Merchant Marine Ins. Co. v. Letton, 9 F. 2d 799 (2d Cir.).
Plaintiffs contend that defendant’s failure to approve the plans drawn by the architects or to propose modifications that would lower the costs to its satisfaction constituted breach of contract, relying upon Stevens v. Howard D. Johnson Co., 181 F. 2d 390 (4th Cir.). But here the parties neither had arrived at a final agreement as to the alterations to be made nor upon terms under which the law fixed responsibility upon defendant to prevent damages to plaintiff due to the failure of the parties to resolve the disagreement which arose. Moreover, defendant did make a proposal for modifying the alterations so as to bring the costs down to [561] $600,000. This was rejected by plaintiffs. In addition, it is not simply that the parties were nnable to agree as to who was obligated to pay for the truck bay and fire alarm and sprinkler systems, but we find no legal basis for holding that such an obligation had been placed by contract upon defendant. For defendant to refuse to go forward when the situation as it developed left so much unresolved by the negotiations was not so unreasonable as to constitute a breach of agreement on its part.
We have considered plaintiffs’ contention that they are entitled to recover on the theory that the United States through its representatives anticipatorily breached the lease on the ground that it was illegal and ultra vires in certain of its provisions, thus relieving plaintiffs of responsibility for further performance and entitling them to sue for breach of agreement. They cite Roehm v. Horst, 178 U. S. 1, and In re Mullings Clothing Corp., 238 Fed. 58 (2d Cir.), as well as other cases. We do not think this contention furnishes a basis for a decision favorable to plaintiffs; for though it be true that the representatives of the United States did at a certain point characterize provisions of the lease as illegal and ultra vires — a position not persisted in during the litigation — it is also true that the negotiations between the parties actually collapsed for other reasons and in the manner we have described.
Since there was no breach by defendant of an enforceable agreement plaintiffs must bear the costs which they expended in the process of trying to reach such an agreement. Defendant was also at considerable expense which it has not sought to recover.
The petition will be dismissed.
It is so ordered.
FINDINGS OF FACT
The court, having considered the evidence, the report of Commissioner William E. Day, and the briefs and argument of counsel, makes findings of fact as follows:
[562]*5621. Plaintiffs, Maxwell Abbell and Joseph J. Abbell, who are citizens of the United States and residents of the State of Illinois, are the owners of the premises known as the Paramount Hotel Building, 235 West 46th Street, New York, New York.
2. This action was brought to recover damages for the alleged breach of a lease covering the Paramount Hotel Building. In its answer the defendant has denied that a valid or binding lease agreement existed and that it breached any agreement. By stipulation approved by the commissioner of this court to whom the case was assigned, a hearing was held to determine the issue of liability, leaving for later determination the issue of damages in the event the defendant is found liable.
3. The Paramount Hotel is a 19-story brick and steel building of fireproof construction.
4. Early in the summer of 1952, the Internal Revenue Service of the Department of the Treasury, hereafter referred to as IRS, requested the General Services Administration, referred to hereafter as GSA, to obtain suitable office space in midtown Manhattan for the proposed consolidation of IRS activities. In July of that year GSA conducted a survey to ascertain whether suitable space was available. Before GSA had taken any other action to procure space, however, Messrs. William T. Carrigan, Jr., then a valuation engineer stationed in the New York office of IRS, and Louis Y. DeSantis, then Assistant. Chief of the Buildings and Surveys Division, Department of the Treasury, Washington, D. C., met in New York City and discussed with Mr. Bernard Greenbaum, a Chicago real estate broker, the fact that IRS was seeking office space in New York. After receiving that information, Mr. Greenbaum proposed to representatives of GSA in New York the availability of the Paramount Hotel Building. Greenbaum was informed that his suggestion would be considered but that GSA was not in a position to discuss the matter in detail. Thereafter, on August 12, 1952, a conference was held in the office of the Regional Director, GSA, in New York. That conference was attended by a number of representatives of GSA, IRS and the Department of the Treasury. At the con[563] ference, the requirements of IES were outlined and it was decided to advertise for space to fulfill IES needs. An invitation for bids was prepared and circulated by GSA to 741 real estate brokers and building owners. The advertisement for bids invited three alternative proposals, described as Bids A, B and C. The advertisement for Bid A invited proposals for a building large enough to provide offices for both the Eegional Commissioner and the District Director of IES. The advertisement for Bid B invited proposals for space required by the office of the Eegional Commissioner and his staff, and the advertisement for Bid C invited proposals for space required by the office of the District Director and his staff.
5. The invitation for bids recited:
The Federal Government desires to acquire by lease, space for office, storage and related uses, as indicated below, in buildings already constructed, or to be constructed, for a term of five (5) years commencing at the earliest practicable date, with options to renew for separate additional five-year terms thereafter upon ninety (90) days’ written notice to the Lessor, .to be indicated by bidder in the respective bids.
* * * * *
The instructions to bidders and general provisions which accompanied the invitation recited, among other things:
$ ‡ ‡ ‡
(5) (b) The Government reserves the right to'reject any or all bids and to waive any informality in bids received when such waiver is in the interest of the Government ; or to enter into negotiations with individual bidders ; or to solicit or consider other properties whether or not submitted in response to this advertisement or at the announced date of opening, as determined to be in the best interest of the Government.
*****
8 (b) If existing building(s) are offered, the Bidder shall so state in his Bid, and if not presently in compliance with the specifications herein set forth, the Bidder shall specify whether his annual Eent Bid includes the necessary alterations. Details of such alterations included in his Eent Bid shall be submitted for the Government’s approval before proceeding with the letting of contracts and execution of the alterations.
*****
[564]*56413. CONDITIONED BlPS: PROPOSALS CONTAINING CONDITIONS Other Than Those Imposed by the Government Contained Herein "Will Not Be Considered. Without limiting the generality of the foregoing, bidders’ attention is specifically invited to the fact that bids which contain proposals conditioned upon financing, accelerated amortization for tax purposes, or any conditions inimical to the best interests of the Government will not be considered.
*****
19. Laws, Taxes, Etc.: The proponent at his own expense must comply with all State, local laws, ordinances, building codes, rules and regulations, and statutes relating to office buildings, their occupancy and equipment requirements, and shall make or cause to be made such changes as may be required to bring such structures and/or their equipment into conformity with all State, local laws, ordinances, building codes, rules and regulations, and statutes; and shall pay all taxes, duties, or other charges levied or to be levied on the said premises, except gas, electric current and fuel.
$ * $ ‡ *
6. The bids were opened October 31, 1952. GSA received only 12 bids, one of which was submitted by the plaintiffs. No offer of space was made under Bid A by the plaintiffs, who under Bid B offered 19 floors of the hotel (exclusive of basement and subbasement) with a net usable space of 180, 405 sq. ft. at $1.74 per sq. ft., subject to certain conditions which provided that the rental quoted was based upon the Government’s performing at its own expense its own tenant changes, alterations and remodeling; and, provided that the changes made would not be in violation of local, state, and Federal rules, laws and ordinances. This bid also contained the following proviso:
# jN ❖ * *
The Government shall not be required to restore the premises at the expiration of its occupancy except as hereinafter stated. The Government shall have the right to effect tenant changes, alterations and remodeling without the prior consent of the Lessor; however, the Government shall not make any structural changes without the prior consent of Lessor and The Government shall file with the Lessor plans and specifications indicating such structural changes. In addition there[565] of, if the Lessor grants approval for structural changes, the Government shall upon making such changes, not do or perform any work which shall be in violation of any building codes or ordinances, local, County or State, regarding such structural changes. If any structural changes shall be made, the Government shall at the expiration of its occupancy restore the premises to the condition existing prior to said structural changes.
:B H* ❖ H* ❖
A note at the end thereof stated:
Note:
Bidder is willing to enter into negotiations for the lease of the space described in the foregoing Bid “B” upon conditions under which bidder will at its expense make the changes, alterations and remodeling required by the Government.
The plaintiff also submitted a proposal to rent a lesser amount of space under Bid C with substantially the same attached conditions.
7. Mr. Harvey F. Gibson was, during all times material herein, Chief, Beal Property Acquisition & Utilization Division, Public Buildings Service, General Services Administration, in the New York Regional office of that agency. He was a contracting officer. The above described bids were solicited by his office and returned to him. His assistant was Mr. Anthony Boemi, whose title was Chief of the Leasing Branch of Mr. Gibson’s division.
8. Shortly after the opening of bids, Mr. Greenbaum came to the New York office of GSA and was told that it would not be possible for GSA to lease the building “as is” because appropriation difficulties precluded GSA from making at Government expense the necessary alterations to render the hotel suitable for office use. Greenbaum was told that he should obtain and present to Mr. Gibson’s office a power of attorney if the owners desired to negotiate further in connection with the rental of the hotel. Greenbaum did obtain a power of attorney authorizing him to negotiate on behalf of the owners with GSA “* * * in regard to the leasing, remodeling, reconstruction and alteration of * * * HOTEL PARAMOUNT ; * * *” The power of attorney was signed by the plaintiffs, and dated November 6, 1952.
[566]*5669. On November 20, 1952, Mr. Greenbaum again came to New York and a conference was held in the GSA office between him and Mr. Gibson and Mr. Boemi of GSA, and Mr. DeSantis and Mr. Carrigan of Treasury. Mr. Greenbaum presented the power of. attorney referred to above. Mr. Carrigan brought to the conference an outline description of alterations of the Paramount Hotel required for occupancy by the District Commissioner’s office, Bureau of Internal Revenue. Mr. Carrigan and Mr. Greenbaum, each of whom had had substantial experience regarding construction and alteration costs, considered the cost of accomplishing the alterations. Greenbaum arrived at a figure of about $450,000 and Carrigan arrived at a figure of about $600,000 as the approximate cost of accomplishing the alterations covered by the outline description of alterations. Greenbaum stated at that meeting that any deal negotiated would have to return $1.74 per sq. ft. to the owners plus amortization and interest cost on any amount which the owners would be required to spend to accomplish the alterations required.
10. After the conference referred to in the preceding finding, a tabulation of all bids received was prepared by Mr. Boemi in which a basic proposed rental of 162,240 sq. ft. of space in the Paramount Hotel was shown at $1.74 per sq. ft., an estimated operating cost at $1.31 per sq. ft. was shown, as well as the cost of 46 cents per sq. ft. representing the cost of alterations, which were estimated at $600,000 to be amortized over 10 years at 41/2 percent interest. Under remarks on this tabulation the notation “Recommended for Commissioner’s Office” is shown.
11. On November 26, 1952, Mr. Gibson prepared and sent to the office of the District Commissioner, Internal Revenue Service, New York, over the signature of Gibson’s superior, Mr. Walter F. Downey, GSA Regional Director, a letter recommending acceptance of offers as to two buildings, one for the District Director’s office and that concerning the Paramount Hotel for the District Commissioner’s office. That letter transmitted the tabulation of bids received and reads in pertinent part as follows:
It is, therefore, the recommendation of this office that we accept the offers made to us on two existing buildings [567] as listed below. This recommendation was arrived at after a thorough study of the properties as far as location, accessibility to public transportation, layout of the space, date of occupancy and the overall cost to the Government.
The location recommended for the District Commissioner’s office is the Paramount Hotel situated at 235 West 46th Street between Seventh and Eighth Avenues. The owner can make available within approximately six months the entire building above the second floor (17 floors) containing a net rentable area of 162,240 square feet of space at an annual rental of $1.74 per square foot. GSA has estimated that it will cost $1.31 per square foot to operate and maintain this space. However, the owner has indicated his willingness to operate the building on a cost basis with such cost to be adjusted at the end of each year based on his actual expenditures. The owner has also agreed to perform all alterations provided the Government repays such cost which will be amortized over a period of 10 years at 4y2 percent interest, or in the event the space is vacated at the end of the first 5 years of the lease, the Government will then be required to pay any balance of the cost in a lump sum. Initial estimates of the alteration cost was placed at $600,000.00, however, Mr. Carrigan of the Bureau of Internal Keve-nue has indicated that a revision of his plans for this space should reduce the cost to approximately $400,000.00 by virtue of the fact that relocation of corridors on approximately 8 floors will not be necessary. The owner has also agreed to place individual air-conditioning units in all windows at an additional rental of 6‡ per square foot. Present Government regulations require adequate justification before air-conditioning can be installed in general-purpose space.
12. On November 28,1952, Mr. Gibson wrote a letter to the plaintiff in the following terms:
Under the terms of the Bid which you submitted in response to our recent advertisement you indicated that the Bid must be accepted within 30 calendar days from the date of the Bid opening (October 31, 1952).
In view of the fact that it is taking considerable length of time to make a thorough investigation of the properties in response to our advertisement, we hereby request that you grant us an additional 30 days for acceptance of your offer, or as many days as you are in a position to extend your proposal.
[568] Let us have your reply in duplicate so that we can attach it to the copies of the Bid which are on file in this office.
13. On December 5,1952, Bernard Greenbaum sent a letter to Mr. Gibson and this was enclosed as an attachment to a letter signed by the plaintiffs, bearing the same date, addressed to Mr. Gibson.
Greenbaum’s letter reads as follows:
Pursuant to my phone conversation with Mr. Boemi yesterday, enclosed find Extension Agreement, signed by Maxwell Abbell and Joseph J. Abbell. It is to be understood that if you accept the bid pursuant to the terms of the enclosed Extension, the bid you are accepting. is the original bid, modified by the understandings which we will have reached as a result of the various discussions that have taken place in the presence of Messrs. Gibson, et al. These discussions contemplated remodeling of the premises to be leased. Our negotiations concerning remodeling are, of course, subject to the lessor’s obtaining financing. At present I anticipate no difficulty, based on my preliminary investigation of the problem. By making the extension subject to the conditions contained in this letter, I am aware that all that has been done is to leave the matter open for further negotiations. The Messrs. Abbell understand that their original bid can no longer be accepted because of the conditions contained in this memorandum. However, this extension is being delivered with the understanding-that it merely constitutes authority to continue our negotiations and that no acceptance can be or is to be made until our negotiations have been crystallized in a formal written lease or contract to be executed by the Messrs. Abbell or their authorized agent.
The plaintiffs’ letter reads as follows:
In response to your letter to the undersigned dated November 28, 1952 requesting an extension of the bid which we submitted relative to the above mentioned property, this is to inform you that we do hereby grant an additional twenty (20) days from the date of this letter within which you may accept our bid, provided, however, that any such acceptance shall be subject to the conditions expressed in the memorandum of our agent, Bernard Greenbaum, attached hereto.
14. There were many discussions and conferences had between representatives of GSA, Treasury and Mr. Green-[569] baum between the date of the bid opening, October 31,1952 and the early part of 1953. It is clear that during these conferences both parties understood that the Government wanted to rent all floors above the first floor, and that the Government was not in a position to do the work of alterations. The discussions centered around the manner in which such alterations would be accomplished by the plaintiffs with reimbursement to the plaintiffs over the period of the Government’s tenancy on a five-year lease with an option by the Government to extend for two periods of five years each, a maximum of fifteen years, and if the Government should vacate earlier than the extended period, the unreimbursed cost of performing the alterations would be paid to the plaintiffs. In all discussions regarding the cost of such alterations, the figure of $600,000 was used.
15. In January 1953, Leonard Schanfield, a law partner of the plaintiffs (who had prepared the bid submitted by the plaintiffs), entered the discussions and presented a power of attorney to Mr. Gibson. Greenbaum’s power of attorney was never withdrawn, however. Schanfield’s power of attorney is dated December 8, 1952, and reads as follows:
KNOW All Men by These Presents, that
WheReas, we, Maxwell Abbell and Joseph J. Ab-bell, of the City of Chicago, County of Cook and State of Illinois, are the owners in fee simple of the property located at 235 West 46th Street, New York, New York, commonly known at HOTEL PARAMOUNT: and
Whereas, we, said Maxwell Abbell and Joseph J. Abbell desire to grant to our attorney, Leonard Schan-field, of the City of Chicago, County of Cook and State of Illinois, full power and authority to represent us and transact any and all business with respect to the above mentioned real estate;
Now, Therefore, we, the said Maxwell Abbell and Joseph J. Abbell, do hereby make, constitute and appoint Leonard Schanfield, our true and lawful attorney and agent, for us and in our name, to negotiate on our behalf with the United States Government or any department or agency thereof, or federal corporation, in regard to the leasing, remodeling, reconstruction and alteration of the aforementioned property, and in addition, to lease, contract or otherwise deal with said property, and to enter into, sign, execute and deliver any contracts, deeds, leases or other instruments whatsoever, [570] and to draw, accept, make, endorse or otherwise deal with any bills of exchange, checks, promissory notes or other commercial instruments relating to the leasing or such other contractual arrangements as he shall deem necessary or expedient to consummate and effectuate all negotiations and dealings which he shall have had or be advised of concerning the leasing of said property by the United States Government or any department or agency thereof, or federal corporation.
Ana further giving and granting unto our said attorney full power and authority to do and perform all and every act and thing whatsoever requisite and necessary to be done in and about the premises and related thereto, as fully to all intents and purposes as we might or could do if personally present at the doing thereof, with full power of substitution and revocation; hereby ratifying and confirming all that our said attorney, or his substitute, shall lawfully do or cause to be done by virtue hereof.
IN WitNess Whereof, we have hereunto set our hands and seals, this 8th day of December, 1952.
16. The plaintiffs, who are lawyers, and Mr. Schanfield knew that the authority to contract for the rental of space was in GSA. The Treasury representatives, since Internal Revenue was to be the tenant in the leased premises, took an active part in many of the discussions however.
17. The Treasury Department approved of leasing the •space in the Paramount Hotel, and through its Director of Administrative Services requested the Commissioner of Public Buildings to authorize the New York Regional office ■of GSA to proceed to acquire such space. This was contained in a letter of December 19,1952, by which the Treasury Department agreed to reimburse GSA for rent and related costs in connection with the acquisition of space in the Paramount Hotel. This letter contained no limitation as to the amount of such costs.
18. On December 22, 1952, the Commissioner of Public Buildings in a letter to the New York Regional Director, GSA, approved of the acquisition of space in the Paramount Hotel by lease. The letter also discussed space in another building and reads in part as follows:
Based upon your recommendation, each of these proposed lease transactions is hereby approved pursuant to Section 6c (1) of PBS Order No. 4, Revised, subject to [571] the following limitations. This approval is applicable only to the excess of the term of each proposed lease over and above three years and to the excess of costs to be incurred over and above $250,000 per annum. A further condition of this approval is that each lease shall be submitted here for review prior to execution by the Government, although the terms and provisions of the leases remain for Regional Office determination.
In the latter connection, we suggest that, to the extent applicable in either or both of these cases, pertinent provisions patterned after the suggestions we made May 1, 1951 in the Sheraton Hotel case at Philadelphia be included in the proposed leases. This matter was discussed between our Mr. Raskin and your Mr. Gibson by telephone on December 15 and 22,1952.
19. On December 24, 1952, Mr. Gibson sent the following letter to the plaintiffs:
This will confirm telephone conversation of December 22,1952 with Mr. Anthony Boemi of this office, in which we advised that our Central Office in Washington, D. 0. has authorized us to accept your proposal dated October 29, 1952 for rental to the Government approximately 162,240 square feet of space contained in the building located at 235 West 46th Street, New York City, as submitted under Bid B of the above-mentioned Invitation.
You may consider this letter as an acceptance of your Bid subject to a mutual agreement covering the alterations which will be necessary to prepare the building for Government occupancy. Upon the conclusion of such an agreement a lease will be prepared in the office on standard form prescribed for Government use and submitted to you for execution.
20. On December 24,1952, Mr. Gibson’s superior, the New York Regional Director, sent a letter to the Commissioner of Public Buildings requesting that a “Certificate of Determination” concerning a limitation imposed by Section 322 of the Economy Act (Act of June 30, 1932 (47 Stat. 412)) be executed. That letter reads as follows:
Further reference is made to proposed lease covering the acquisition, by the Government of approximately 162,240 square feet of rentable area in building now known as the Paramount Hotel, located at 235 West 46th Street, New York, New York. This space is to be occupied by the District Commissioner’s Office of the In-[572] temal Revenue Bureau of the New York City District.
A full report has been submitted to your Chief, RPA&IT Branch, by memorandum dated November 28, 1952, with attachments thereto, prepared by Mr. Gibson of this office. It was reported that the bid submitted for the subject property is at a unit rental of $1.74 per square foot on an “as is” basis. In order to make the building suitable for the Internal Revenue Bureau, alterations are required, the cost of which has been estimated at a figure not to exceed $600,000. The Lessor has agreed to contract for such alterations as we request and will make direct payments from his own funds for all such work, provided he receives reimbursement from the Government. As Internal Revenue Bureau does not have sufficient funds available to make immediate reimbursement, Lessor agreed to amortize this expenditure plus 4%% interest over a 10-year period and will accept equal monthly payments until the full obligation for this alteration work is liquidated. In the event the Government fails to renew the lease after expiration of the first five-year firm term, the Government will be obligated to pay the balance of its unpaid obligation. 'The maximum that can be spent for permanent improvements under Section 322 of the Economy Act of June 30, 1932, as amended, will approximate $70,000. In order that we may proceed with the alterations, this office recommends execution of attached “Certificate of Determination”, waiving requirements of said Section •322 of the Economy Act of June 30, 1932, as amended, pursuant to Section 210 (a) (8) of Public Law 152, as amended.
This recommendation is based on the following:
1. The lease will be for a firm term of five years with renewal options to the Government for two additional terms of five years each.
2. The rental of $1.74 per sq. ft. plus cost of operation and, further, plus cost of alterations, amortized on expectant life of the lease to extend beyond five years, is the most economic space that can be secured in this particular locality. Average rental in this area is $4.00 per sq. ft.
3. The location is such that were Internal Revenue to vacate the premises, no difficulties would be encountered in relocating other Government agencies housed in more costly rented buildings.
4. Building is centrally located, easily accessible from all parts of Manhattan, Brooklyn, Queens and Long Island.
[573] It is the opinion of this office that to repair, improve and alter the Paramount Building at Government expense, is advantageous to the Government in terms of economy and efficiency.
Enclosure
Certificate of Determination
21. Numerous conferences were held between representatives of GSA and Mr. Schanfield on behalf of the plaintiffs ■concerning proposed drafts of a lease. Such conferences as well as many letters exchanging proposed drafts of a lease ■extended over a period of six or seven months. In the meantime, on March 25, 1953, Mr. Greenbaum and Mr. William A. Boyd, Assistant Chief of Construction and Bepair Division of the New York Kegional office, GSA, each made a detailed estimate of the cost of accomplishing alterations covered by the outline description of alterations referred to in finding 9. The preparation of such detailed estimate required four or five hours by each. Greenbaum’s estimate was $573,000 and Boyd’s was $752,000. Greenbaum and Boyd discussed each item of work together and the estimate of each was written down on a paper with nine sheets of supporting data. The first page reads in part as follows:
Ghreenbaum W. A. Boyé
Wrecking_ $50,000 $72, 000
Partitions Plaster on 4 or C. B- 31,200 52, 000
Plaster Patch_ 15, 000 15, 000
Ceramic tile Wall & Floors & Toilets- 27,000 27, 000
Asphalt Tile_ 23, 000 43,000
Painting_ 40,000 45, 000
Doors_ 21, 000 21,000
Plumbing_ 45,000 48, 500
Lighting_ 83, 000 97,000
Air C_ 78,000 90, 000
Steel & Glass Partitions_ 15,000 25, 000
Acoustic tile Ceiling_ 500 500
New Lobby & Ent & 1st fl change_ 20,000 30, 000
Structural inc. Windows & Glazing_ 8, 000 13, 000
Architects Fees_ 50, 000 50, 000
Interest_ 6,000 6, 000
Insurance_ 1, 000 1,000
Overhead Profit_ 60,000 20% 116,000
4
$573, 000 752,000
Bookshelves. 3, 500 3,500
$755,500
B. Greenbaum WA Boyd
[574] Upon completion of the estimate above, Mr. Greenbaum and Mr. Boyd brought it to a conference attended by Gibson, Schanfield and others. It was discussed by those named.
22. The letter quoted below was sent to Mr. Gibson on April 7,1953, by Mr. Schanfield:
At our last meeting which was held on March 24, 1953 in your office, at which there were in attendance the following persons: Messrs. Boemi, Cirrillo, Wolfe, Raskin and yourself, of General Services Administration, Messrs. Nowack [sic], Davis and Carrigan, of the Treasury Department, and Bernard Greenbaum and myself, on behalf of the owners of the Paramount Hotel, I set forth the position of the owners of the Paramount Hotel with respect to leasing of that property to the United States Government. You will recall that it is our position that our bid to lease space in the Paramount Hotel Building to the United States Government for use by the Treasury Department, has been accepted by the Government. You have submitted proposed plans for remodeling the space in accordance with the desires and needs of the Treasury Department, and we have informed you that you are free to make the remodeling alterations you desire. In view of the foregoing, we are now prepared to evidence the lease by entering into-a standard form lease agreement as required by the bid and your acceptance thereof.
Because of problems which the Government will encounter with respect to the matters of budget, time and similar problems peculiar to Goverment functions, you have indicated that it would be of great aid to the Government if a modification of our present agreement could be achieved whereby the Lessors would undertake to make remodeling changes on behalf of the Government. Pursuant to this expression of desire on the part of the Government, and solely for the purpose of determining whether it was feasible to give additional aid to the Government, we have, for the past few months carried on discussions concerning a proposed lease which would modify and supplant the lease called for by the terms of the bid and acceptance. To date various drafts of such an agreement have been considered. In our last discussion it appeared that the burden of responsibility which would be placed upon the Lessors under the proposed new agreement would be much greater than they would be inclined to undertake and certainly would be without any added compensation. Under our present arrangement the space to be taken by the Government [575] is on an “as is” basis and none of the risks and responsibilities of directing the remodeling fall upon the Lessors. Although we would like to aid the Government, we cannot do so at the cost of abandoning an equitable agreement for an onerous one.
I do not know whether any further discussions on this matter can be fruitful of an understanding, but in the interest of the time already spent, I am enclosing herewith my suggestions to you with respect to the form of an agreement covering the situation. These suggestions are not to be construed as an offer on the part of Messrs. Abbell to enter into a lease containing such provisions, but are only my suggestions to you as to the form in which you should make your proposed offer of a lease to supplant the standard form lease to which we we are entitled as of today.
In the event the parties do not agree to modify the Lease required by the bid and acceptance referred to hereinabove, this is to inform you that we shall expect rental payments to commence May 1,1958, or upon such sooner date as you take possession of the premises in accordance with the laws of the State of New York.
23. Other letters were exchanged concerning proposed lease provisions, and on April 23, 1953, Gibson sent the following letter to the plaintiffs to the attention of Mr. Schanfield:
This will acknowledge receipt of your letter of April 17th in reply to my letter of April 14th concerning revisions in the proposed lease for the Paramount Hotel Building, New York City.
The lease has been redrafted in accordance with the conclusion reached as a result of the above referred to correspondence and we are inclosing herewith three copies for your review.
We have also delivered a copy by hand to our Washington office and trust that their approval of the latest revision of this lease will be received promptly.
_ Unless you have any further suggestions toward additional revision of the lease it is requested that you retain the attached copies in your possession until you have been notified of the final approval by our Washington office which will permit the execution of the documents.
24. On April 23, 1953, Gibson also wrote to the Commissioner of Public Buildings, GSA, in Washington, advising that official of his negotiations as to the terms of the proposed lease with Schanfield concerning certain questions [576] raised by the Washington office about an earlier draft. He advised that he was sending Mr. Boemi of his office to personally deliver a proposed lease for approval of its terms.
25. On May 11,1953, the Acting Commissioner of Public Buildings wrote to the Regional Director, G8A, in part as follows:
‡ * * * *
The proposed lease submitted with the April 23 memorandum has been reviewed and no objection is interposed to the terms and provisions thereof. However, paragraph 22 might be strengthened by adding at the end the words “as determined by the Government.” We are retaining the copy of the lease for our records, and would appreciate being advised who executed it so we may conform the copy.
On April 24,1953, during a visit here by Mr. Anthony Boemi, of your office, the proposed lease was approved by the Office of the General Counsel as to the legal sufficiency, subject to (1) compliance with Section 322 of the Economy Act of June 30, 1932, as amended (of which the Lessor is considered to be on notice), and (2) our obtaining exemption from the 25 percent limitation thereof if necessary. There are attached the original and one conformed copy of the Certificate of Determination approved by the Administrator on May 8,1953, determining that the repair, alteration and improvement of these premises, at an estimated cost of $600,000 is advantageous to the Government in terms of economy and efficiency pursuant to Section 210 (a) (8) of the Federal Property and Administrative Services Act of 1949, as amended.
26. On May 12, 1953, Gibson sent the following telegram to the plaintiffs:
HAVE RECEIVED WASHINGTON APPROVAL POR PARAMOUNT HOTEL LEASE WITH PROVISO THAT FOLLOWING WORDS BE ADDED AT END OE PARAGRAPH 22 ££AS DETERMINED BT THE GOVERNMENT”. IF TOU CONCUR, PLEASE ADD SUGGESTED LANGUAGE AND INITIAL SAME. ALL COPIES OP LEASE IN TOUR POSSESSION SHOULD BE SIGNED AND RETURNED TO THIS OPPICE POR EXECUTION BT THE GOVERNMENT APTER WHICH COPT WILL BE PROVIDED POR TOUR FILES.
SUGGEST TOU IMMEDIATELT NOTIFT ARCHITECT APTER LEASE HAS BEEN SIGNED SO THAT THET CAN PROCEED WITH DETAILED PLANS AND SPECIFICATIONS. WE HAVE TODAT FURNISHED THEM PRELIMINART PLANS AND SPECIFICATIONS.
[577]*57727. In the meantime, Schanfield had had discussions with Mr. Arthur Malsin, a partner in the firm of architects which was later engaged by the plaintiffs to perform architectural services as required by the terms of the lease finally signed by the parties. Malsin was introduced to Schanfield through Mr. Greenbaum. On May 12, 1953, a copy of outline plans and specifications of the changes in the Paramount Hotel desired by the Government was handed to Mr. Malsin and Mr. Eeiman, one of his partners. This was done at a meeting attended by Harvey Gibson and others.
28. From the middle of May until the middle of July the plaintiffs were endeavoring to obtain financial commitments to enable them to perform the necessary alterations to the hotel. They were unsuccessful until assistance in this regard was given by representatives of the United States Treasury Department in Washington. Changes in the form of the proposed lease were suggested as a result of the commitment finally obtained by the plaintiffs of a $600,000 loan at 4% percent interest “in connection with the alterations and remodeling operations of the said premises to be undertaken by you under the terms and provisions of a lease of said premises you proposed to enter into with the United States of America”.
29. Further drafts of the terms of a proposed lease were exchanged along with letters from both sides, each contending for the inclusion of particular language. On August 17, 1953, Schanfield sent the following telegram to Harvey Gibson and Anthony Boemi:
PLEASE CONSIDER THIS AS NOTIFICATION OF TERMINATION OF NEGOTIATIONS FOR LEASE ON PARAMONT HOTEL IN ACCORDANCE WITH LAST CONVERSATIONS AND NEGOTIATIONS, UNLESS PROPOSED FINAL DRAFT OF LEASE IS IN OUR HANDS BEFORE END OF THIS WEEK
In all, at least seven drafts of a proposed lease were exchanged so that the lease finally executed became the language of both parties and no presumptions as to authorship will be considered.
30. The lease was finally entered into as of August 26,1953, between the plaintiffs (signed by each of them) and the defendant, acting through the GSA Public Buildings Service [578] by Harvey F. Gibson, Chief, Real Estate Division. It reads in pertinent part as follows:
* * * * *
2. The Lessor hereby leases to the Government the following-described premises, in the building situated at 235 West 46th Street, New York City, New. York, commonly known as the “Paramount Hotel”, viz:
Entire floors, beginning with the second (2nd) floor up to the eighteenth (18th) floor, both inclusive, contain a total of approximately one hundred sixty-eight thousand, six hundred and fifty-nine (168,659) square feet, and in addition the lobby entrance, foyer and new service entrance on the ground floor, which ground floor area contains approximately three thousand, five hundred and twenty-six (3,526) square feet and is reserved to service exclusively the demised premises to be used exclusively for the following purposes:
Office quarters and uses incidental thereto.
The square foot areas indicated above are approximate computations, established for budget purposes only.Footnotes