(a) Authorization is granted for the Level III
rehabilitation construction projects identified in this section,
subject to the general conditions specified in W.S. 99-3-104.
Source notes for subsection (a): (Laws 2001, Ch. 2, § 1.)
(b) Project – Baggs Water Supply Rehabilitation Project:
(i) Project sponsor: Town of Baggs;
(ii) Project purpose: Municipal and domestic water
supply;
(iii) Project description: Diversion and intake
facilities and other miscellaneous appurtenances necessary to
make the project function in the manner intended;
(iv) Total project budget: Two hundred forty thousand
dollars ($240,000.00);
(v) Project grant: The state of Wyoming shall grant
to the sponsor from water development account II through the
commission for the design, permit procurement, project land
procurement, construction engineering, and construction of the
project an amount not to exceed one hundred twenty thousand
dollars ($120,000.00) or fifty percent (50%) of the actual
development costs, whichever is less;
(vi) Appropriation: There is appropriated from water
development account II to the commission one hundred twenty
thousand dollars ($120,000.00) or as much thereof as is
necessary to carry out the purpose of this subsection.
Unexpended funds appropriated under this subsection shall revert
to water development account II on July 1, 2005; and
(vii) Special conditions:
(A) The sponsor is responsible for acquiring
fifty percent (50%) of the total project budget from other
sources;
(B) The sponsor may be reimbursed for project
expenditures, which occurred prior to April 1, 2003.
Source notes for subsection (b): (Laws 2001, Ch. 2, § 1; 2003,
Ch. 69, § 8.)
(c) Project – Bridger Valley Intake Structure
Rehabilitation Project:
(i) Project sponsor: Bridger Valley Joint Powers
Board;
(ii) Project purpose: Municipal and domestic water
supply;
(iii) Project description: Rehabilitation of the
intake and raw water diversion facility, construction of a water
storage tank, and transmission pipeline and appurtenances
necessary to make the project function in the manner intended;
(iv) Total project budget: One million ten thousand
dollars ($1,010,000.00);
(v) Project grant: The state of Wyoming shall grant
to the sponsor from water development account II through the
commission for the design, permit procurement, project land
procurement, construction engineering, and construction of the
project an amount not to exceed five hundred five thousand
dollars ($505,000.00) or fifty percent (50%) of the actual
development costs, whichever is less;
(vi) Appropriation: There is appropriated from water
development account II to the commission five hundred five
thousand dollars ($505,000.00) or as much thereof as is
necessary to carry out the purpose of this subsection.
Unexpended funds appropriated under this subsection shall revert
to water development account II on July 1, 2005; and
(vii) Special condition: The sponsor is responsible
for acquiring fifty percent (50%) of the total project budget
from other sources.
Source notes for subsection (c): (Laws 2001, Ch. 2, § 1; 2002,
Ch. 88, § 9.)
(d) Project – Cheyenne South Crow Dam Water Supply
Rehabilitation Project:
(i) Project sponsor: City of Cheyenne;
(ii) Project purpose: Municipal and domestic water
supply;
(iii) Project description: Final design services,
plans and specifications, for rehabilitating the South Crow Dam,
for adding a supervisory control and data acquisition control
system, for pipelines needed to connect to the city's treatment
and conveyance system, rehabilitation of the dam, installation
of the pipeline, installation of telemetry, construction of a
valve house and appurtenances necessary to make the project
function in the manner intended;
(iv) Total project budget: One million five hundred
thousand dollars ($1,500,000.00);
(v) Repealed by Laws 2002, Ch. 88, §16.
(vi) Project Grant: The state of Wyoming shall grant
to the sponsor from water development account II through the
commission for the final design, plans and specifications for
the project, construction engineering, project land procurement,
permit procurement, and construction of the project an amount
not to exceed seven hundred fifty thousand dollars ($750,000.00)
or fifty percent (50%) of the actual development costs,
whichever is less; and
(vii) Appropriation: There is appropriated from water
development account II to the commission seven hundred fifty
thousand dollars ($750,000.00) or as much thereof as is
necessary to carry out the purpose of this subsection.
Unexpended funds appropriated under this subsection shall revert
to water development account II on July 1, 2007;
(viii) Special condition: The sponsor is responsible
for acquiring fifty percent (50%) of the total project budget
from other sources.
Source notes for subsection (d): (Laws 2001, Ch. 2, § 1; 2002,
Ch. 88, § 10.)
(e) Project – Dayton Water Supply Rehabilitation Project:
(i) Project sponsor: Town of Dayton;
(ii) Project purpose: Municipal and rural domestic
water supply;
(iii) Project description: Replacement of an existing
transite pipeline, installation of a new booster station,
installation of pipeline to an existing booster station and
appurtenances necessary to make the project function in the
manner intended;
(iv) Total project budget: One million thirty-two
thousand dollars ($1,032,000.00);
(v) Project grant: The state of Wyoming shall grant
to the sponsor from water development account II through the
commission for the design, permit procurement, project land
procurement, construction engineering, and construction of the
project an amount not to exceed six hundred nineteen thousand
two hundred dollars ($619,200.00) or sixty percent (60%) of the
actual development costs, whichever is less;
(vi) Appropriation: There is appropriated from water
development account II to the commission six hundred nineteen
thousand two hundred dollars ($619,200.00) or as much thereof as
is necessary to carry out the purpose of this subsection.
Unexpended funds appropriated under this subsection shall revert
to water development account II on July 1, 2005; and
(vii) Special condition: The sponsor is responsible
for securing forty percent (40%) of the project budget from
other sources.
Source notes for subsection (e): (Laws 2001, Ch. 2, § 1; 2002,
Ch. 88, § 11.)
(f) Project – Encampment Raw Water Line Rehabilitation
Project:
(i) Project sponsor: Town of Encampment;
(ii) Project purpose: Municipal and domestic water
supply;
(iii) Project description: Final design services,
plans and specifications, for the replacement of the remaining
nonpiped portion of the raw water conveyance system extending
from the North Fork of the Encampment River to the town's water
system, installation of the pipeline and for appurtenances
necessary to make the project function in the manner intended;
(iv) Total project budget: Eight hundred thousand
dollars ($800,000.00);
(v) Repealed By Laws 2002, Ch. 88, § 16.
(vi) Project grant: The state of Wyoming shall grant
to the sponsor from water development account II through the
commission for the final design, plans, and specifications,
project land procurement, construction engineering and
construction of the project an amount not to exceed four hundred
thousand dollars ($400,000.00) or fifty percent (50%) of the
actual development costs, whichever is less; and
(vii) Appropriation: There is appropriated from water
development account II to the commission four hundred thousand
dollars ($400,000.00) or as much thereof as is necessary to
carry out the purpose of this subsection. Unexpended funds
appropriated under this subsection shall revert to water
development account II on July 1, 2006;
(viii) Special condition: The sponsor is responsible
for acquiring fifty percent (50%) of the total project budget
from other sources.
Source notes for subsection (f): (Laws 2001, Ch. 2, § 1; 2002,
Ch. 88, § 12.)
(g) Project – Gillette Central Pressure Zone Isolation
Rehabilitation Project:
(i) Project sponsor: City of Gillette;
(ii) Project purpose: Municipal and domestic water
supply;
(iii) Project description: Final design services,
plans and specifications, for improving fire flows, meeting Safe
Drinking Water Act minimum pressure and disinfection
requirements, installation of transmission lines and
appurtenances necessary to make the project function in the
manner intended;
(iv) Total project budget: One million five hundred
nineteen thousand dollars ($1,519,000.00);
(v) Project grant: The state of Wyoming shall grant
to the sponsor from water development account II through the
commission for the final design, plans and specifications,
project land procurement, construction engineering and
construction of the project an amount not to exceed seven
hundred fifty-nine thousand five hundred dollars ($759,500.00)
or fifty percent (50%) of the actual development costs,
whichever is less;
(vi) Appropriation: There is appropriated from water
development account II to the commission seven hundred fifty-
nine thousand five hundred dollars ($759,500.00) or as much
thereof as is necessary to carry out the purpose of this
subsection. Unexpended funds appropriated under this subsection
shall revert to water development account II on July 1, 2006;
and
(vii) Special condition: The sponsor is responsible
for acquiring fifty percent (50%) of the total project budget
from other sources.
Source notes for subsection (g): (Laws 2001, Ch. 2, § 1; 2002,
Ch. 88, § 13.)
(h) Project – Hugus-Mullison Ditch Rehabilitation Project:
(i) Project sponsor: Hugus Watershed Improvement
District;
(ii) Project purpose: Irrigation, seepage and flood
control;
(iii) Project description: Canal lining, replacement
of culverts at street crossings to increase the capacity of the
ditch and appurtenances necessary to make the project function
in the manner intended;
(iv) Total project budget: Six hundred fifty thousand
dollars ($650,000.00);
(v) Project grant: The state of Wyoming shall grant
to the sponsor from water development account II through the
commission for the design, permit procurement, project land
procurement, construction engineering, and construction of the
project an amount not to exceed three hundred twenty-five
thousand dollars ($325,000.00) or fifty percent (50%) of the
actual development costs, whichever is less;
(vi) Appropriation: There is appropriated from water
development account II to the commission three hundred twenty-
five thousand dollars ($325,000.00) or as much thereof as is
necessary to carry out the purpose of this subsection.
Unexpended funds appropriated under this subsection shall revert
to water development account II on July 1, 2005; and
(vii) Special condition: The sponsor is responsible
for acquiring fifty percent (50%) of the total project budget
from other sources.
Source notes for subsection (h): (Laws 2001, Ch. 2, § 1.)
(j) Project – Laramie North Side Water Supply
Rehabilitation Project:
(i) Project sponsor: City of Laramie;
(ii) Project purpose: Municipal;
(iii) Project description: Permit procurement, right-
of-way acquisition, final design services, plans and
specifications required to rehabilitate an existing twenty (20)
inch diameter pipeline, to add additional storage facilities in
east Laramie, to connect the east side storage to the Laramie
water system, the rehabilitation of a twenty (20) inch and
twenty-four (24) inch diameter transmission pipeline, the
replacement of a portion of the twenty (20) inch diameter line,
cathodic protection and for appurtenances necessary to make the
project function in the manner intended;
(iv) Total project budget: Four million one hundred
ninety-five thousand dollars ($4,195,000.00);
(v) Project loan: The state of Wyoming shall loan to
the sponsor from water development account II through the
commission for permit procurement, right-of-way acquisition,
final design, plans and specifications, construction engineering
and construction of the project an amount not to exceed two
million ninety-seven thousand five hundred dollars
($2,097,500.00) or fifty percent (50%) of the actual development
costs, whichever is less, for a term of twenty (20) years from
the date the commission determines project benefits accrue to
the sponsor, at an annual rate of seven and one-quarter percent
(7.25%);
(vi) Project grant: The state of Wyoming shall grant
to the sponsor from water development account II through the
commission for permit procurement, right-of-way acquisition,
final design, plans and specifications, construction engineering
and construction of the project an amount not to exceed two
million ninety-seven thousand five hundred dollars
($2,097,500.00) or fifty percent (50%) of the actual development
costs, whichever is less; and
(vii) Appropriation: There is appropriated from water
development account II to the commission four million one
hundred ninety five thousand dollars ($4,195,000.00) or as much
thereof as is necessary to carry out the purpose of this
subsection. Unexpended funds appropriated under this subsection
shall revert to water development account II on July 1, 2007.
Source notes for subsection (j): (Laws 2001, Ch. 2, § 1; 2002,
Ch. 88, § 14.)
(k) Project – Pine Haven Pipeline Rehabilitation Project:
(i) Project sponsor: Town of Pine Haven;
(ii) Project purpose: Municipal;
(iii) Project description: The project includes
installation of pipelines to connect the town's existing well
directly to the storage system, to tie the storage system to the
distribution system and appurtenances necessary to make the
project function in the manner intended;
(iv) Total project budget: Two hundred thirty-five
thousand dollars ($235,000.00);
(v) Project loan: The state of Wyoming shall loan to
the sponsor from water development account II through the
commission for the design, permit procurement, project land
procurement, construction engineering, and construction of the
project an amount not to exceed one hundred seventeen thousand
five hundred dollars ($117,500.00) or fifty percent (50%) of the
actual development costs, whichever is less, for a term of
thirty (30) years from the date the commission determines
project benefits accrue to the sponsor, at an annual rate of
seven and one-quarter percent (7.25%);
(vi) Project grant: The state of Wyoming shall grant
to the sponsor from water development account II through the
commission for the design, permit procurement, project land
procurement, construction engineering, and construction of the
project an amount not to exceed one hundred seventeen thousand
five hundred dollars ($117,500.00) or fifty percent (50%) of the
actual development costs, whichever is less; and
(vii) Appropriation: There is appropriated from water
development account II to the commission two hundred thirty-five
thousand dollars ($235,000.00) or as much thereof as is
necessary to carry out the purpose of this subsection.
Unexpended funds appropriated under this subsection shall revert
to water development account II on July 1, 2005.
Source notes for subsection (k): (Laws 2001, Ch. 2, § 1.)
(m) Project – Powell Water Supply Rehabilitation Project:
(i) Project sponsor: City of Powell;
(ii) Project purpose: Municipal and domestic water
supply;
(iii) Project description: Right-of-way acquisition,
final design services, including permitting services and
providing plans and specifications, for replacing an old water
storage tank, for recoating an existing water tank, for
providing miscellaneous piping and pressure reducing valves to
create additional pressure zones to comply with the Safe
Drinking Water Act's minimum pressure requirements, construction
of a new storage tank, valves, pressure reducing valves and for
appurtenances necessary to make the project function in the
manner intended;
(iv) Total project budget: Two million three hundred
twenty-six thousand dollars ($2,326,000.00);
(v) Project grant: The state of Wyoming shall grant
to the sponsor from water development account II through the
commission for the right-of-way acquisition, final design, plans
and specifications, construction engineering and construction of
the project an amount not to exceed one million one hundred
sixty-three thousand dollars ($1,163,000.00) or fifty percent
(50%) of the actual development costs, whichever is less;
(vi) Appropriation: There is appropriated from water
development account II to the commission one million one hundred
sixty-three thousand dollars ($1,163,000.00) or as much thereof
as is necessary to carry out the purpose of this subsection.
Unexpended funds appropriated under this subsection shall revert
to water development account II on July 1, 2008; and
(vii) Special condition: The sponsor is responsible
for acquiring fifty percent (50%) of the total project budget
from other sources.
Source notes for subsection (m): (Laws 2001, Ch. 2, § 1; 2002,
Ch. 88, § 15; 2003, Ch. 69, § 9; 2004, Ch. 118, § 6.)
(n) Project – Riverton Raw Water Supply Rehabilitation
Project:
(i) Project sponsor: City of Riverton;
(ii) Project purpose: Municipal and domestic water
supply;
(iii) Project description: Project construction,
including final design services, plans and specifications, for
rehabilitating a raw water conveyance system which serves the
Riverton Valley Irrigation District, the LeClair Irrigation
District, and the City of Riverton and for appurtenances
necessary to make the project function in the manner intended;
(iv) Total project budget: Two million one hundred
seventy-three thousand dollars ($2,173,000.00);
(v) Project grant: The state of Wyoming shall grant
to the sponsor from water development account II through the
commission for the final design, plans and specifications for
the project, permit procurement, project land procurement,
construction engineering and construction of the project an
amount not to exceed one million eighty-six thousand five
hundred dollars ($1,086,500.00) or fifty percent (50%) of the
actual development costs, whichever is less;
(vi) Appropriation: There is appropriated from water
development account II to the commission one million eighty-six
thousand five hundred dollars ($1,086,500.00) or as much thereof
as is necessary to carry out the purpose of this subsection.
Unexpended funds appropriated under this subsection shall revert
to water development account II on July 1, 2009;
(vii) Special condition: The sponsor is responsible
for acquiring fifty percent (50%) of the total project budget
from other sources.
Source notes for subsection (n): (Laws 2001, Ch. 2, § 1; 2004,
Ch. 118, § 7; 2009, Ch. 38, § 2.)
(o) Project – Sheridan Raw Water Supply Rehabilitation
Project:
(i) Project sponsor: City of Sheridan;
(ii) Project purpose: Municipal and domestic water
supply;
(iii) Project description: Final design services,
plans and specifications, for rehabilitating a raw water
conveyance system which serves the city golf course and for
appurtenances necessary to make the project function in the
manner intended;
(iv) Total project budget: One hundred thousand
dollars ($100,000.00);
(v) Project grant: The state of Wyoming shall grant
to the sponsor from water development account II through the
commission for the final design, plans and specifications for
the project an amount not to exceed fifty thousand dollars
($50,000.00) or fifty percent (50%) of the actual development
costs, whichever is less;
(vi) Appropriation: There is appropriated from water
development account II to the commission fifty thousand dollars
($50,000.00) or as much thereof as is necessary to carry out the
purpose of this subsection. Unexpended funds appropriated under
this subsection shall revert to water development account II on
July 1, 2005; and
(vii) Special condition: The sponsor is responsible
for acquiring fifty percent (50%) of the total project budget
from other sources.
Source notes for subsection (o): (Laws 2001, Ch. 2, § 1.)
(p) Project – Wamsutter Water Supply Rehabilitation
Project:
(i) Project sponsor: Town of Wamsutter;
(ii) Project purpose: Municipal and domestic water
supply;
(iii) Project description: The project includes
refinancing of an existing state land and investment board
emergency loan that funded the replacement of an old three (3)
inch diameter transmission line, funding of the replacement of
another existing transmission pipeline from the water supply
well to town and appurtenances necessary to make the project
function in the manner intended;
(iv) Total project budget: Two hundred eighty
thousand dollars ($280,000.00);
(v) Project grant: The state of Wyoming shall grant
to the sponsor from water development account II through the
commission for refinancing the state land and investment board
emergency loan for replacing an existing three (3) inch diameter
pipeline, and for the design, permit procurement, project land
procurement, construction engineering, and construction of a new
rehabilitation project an amount not to exceed one hundred forty
thousand dollars ($140,000.00) or fifty percent (50%) of the
actual development costs, whichever is less;
(vi) Appropriation: There is appropriated from water
development account II to the commission one hundred forty
thousand dollars ($140,000.00) or as much thereof as is
necessary to carry out the purpose of this subsection.
Unexpended funds appropriated under this subsection shall revert
to water development account II on July 1, 2005; and
(vii) Special condition: The sponsor is responsible
for acquiring fifty percent (50%) of the total project budget
from other sources.
Source notes for subsection (p): (Laws 2001, Ch. 2, § 1.)