§ 99-3-1103 — Level III construction projects-new development
This text of Wyoming § 99-3-1103 (Level III construction projects-new development) is published on Counsel Stack Legal Research, covering Wyoming primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.
Text
Free access — add to your briefcase to read the full text and ask questions with AI
(a) Authorization is granted for the Level III new
development construction projects identified in this section
subject to the general conditions specified in W.S. 99-3-103.
Source notes for subsection (a): (Laws 2006, Ch. 105, § 3.)
(b) Project – Afton 2006 Well:
(i) Project sponsor: Town of Afton;
(ii) Project purpose: Municipal, rural domestic water
supply;
(iii) Project description: Design and construction
of transmission pipelines to connect a groundwater supply to the
town's system and appurtenances necessary to make the project
function in the manner intended;
(iv) Total project budget: Two hundred fifty
thousand dollars ($250,000.00);
(v) Project grant: The state of Wyoming shall grant
to the sponsor from water development account I through the
commission for the design, permit procurement, project land
procurement, construction engineering, and construction of the
project an amount not to exceed one hundred sixty-seven thousand
five hundred dollars ($167,500.00) or sixty-seven percent (67%)
of the actual development costs, whichever is less;
(vi) Project loan: The state of Wyoming shall loan to
the sponsor from water development account I through the
commission for the design, permit procurement, construction
engineering, project land procurement and construction of the
project an amount not to exceed eighty-two thousand five hundred
dollars ($82,500.00) or thirty-three percent (33%) of the actual
development costs, whichever is less, for a term of twenty (20)
years from the date the commission determines project benefits
accrue to the sponsor, at an annual rate of four percent (4%);
(vii) Appropriation: There is appropriated from water
development account I to the commission two hundred fifty
thousand dollars ($250,000.00) or as much thereof as is
necessary to carry out the purpose of this subsection.
Unexpended funds appropriated under this subsection shall revert
to water development account I on July 1, 2010.
Source notes for subsection (b): (Laws 2006, Ch. 105, § 3.)
(c) Project – Bear River/Evanston Regional Pipeline
Project:
(i) Project sponsor: Bear River Regional Joint
Powers Board;
(ii) Project purpose: Municipal, rural domestic water
supply;
(iii) Project description: Design and construction
of transmission pipelines and appurtenances necessary to make
the project function in the manner intended;
(iv) Total project budget: Five million five hundred
twenty-one thousand dollars ($5,521,000.00);
(v) Project grant: The state of Wyoming shall grant
to the sponsor from water development account I through the
commission for the design, permit procurement, project land
procurement, construction engineering, and construction of the
project an amount not to exceed three million six hundred
ninety-nine thousand seventy dollars ($3,699,070.00) or sixty-
seven percent (67%) of the actual development costs, whichever
is less;
(vi) Appropriation: There is appropriated from water
development account I to the commission three million six
hundred ninety-nine thousand seventy dollars ($3,699,070.00) or
as much thereof as is necessary to carry out the purpose of this
subsection. Unexpended funds appropriated under this subsection
shall revert to water development account I on July 1, 2010; and
(vii) Special condition: The sponsor is responsible
for acquiring thirty-three percent (33%) of the total project
budget from other sources.
Source notes for subsection (c): (Laws 2006, Ch. 105, § 3.)
(d) Project – Dubois Well No. Eleven Supply:
(i) Project sponsor: Town of Dubois;
(ii) Project purpose: Municipal, rural domestic water
supply;
(iii) Project description: Design and construction
of transmission pipelines to connect the well that was recently
drilled and developed during the Level II study to the town's
water system and appurtenances necessary to make the project
function in the manner intended;
(iv) Total project budget: Four hundred fifteen
thousand dollars ($415,000.00);
(v) Project grant: The state of Wyoming shall grant
to the sponsor from water development account I through the
commission for the design, permit procurement, project land
procurement, construction engineering and construction of the
project an amount not to exceed two hundred seventy-eight
thousand fifty dollars ($278,050.00) or sixty-seven percent
(67%) of the actual development costs, whichever is less;
(vi) Project loan: The state of Wyoming shall loan to
the sponsor from water development account I through the
commission for the design, permit procurement, construction
engineering, project land procurement and construction of the
project an amount not to exceed one hundred thirty-six thousand
nine hundred fifty dollars ($136,950.00) or thirty-three percent
(33%) of the actual development costs, whichever is less, for a
term of twenty (20) years from the date the commission
determines project benefits accrue to the sponsor, at an annual
rate of four percent (4%);
(vii) Appropriation: There is appropriated from water
development account I to the commission four hundred fifteen
thousand dollars ($415,000.00) or as much thereof as is
necessary to carry out the purpose of this subsection.
Unexpended funds appropriated under this subsection shall revert
to water development account I on July 1, 2011; and
(viii) Special condition: The sponsor shall purchase
the well completed during the Level II study for a price not to
exceed thirteen thousand nine hundred ninety-one dollars and
fifty-nine cents ($13,991.59) or thirty-three percent (33%) of
the well's actual construction costs, whichever is less. The
sponsor may purchase the well with a lump sum payment or with
amortized payments for a term of twenty (20) years from the date
the commission determines project benefits accrue to the sponsor
at an interest rate of four percent (4%).
Source notes for subsection (d): (Laws 2006, Ch. 105, § 3;
2008, Ch. 75, § 2.)
(e) Project – Eight Mile/High Plains Well:
(i) Project sponsor: Eight Mile Improvement and
Service District;
(ii) Project purpose: Rural domestic water supply;
(iii) Project description: Design and construction
of transmission pipelines to connect the well drilled during the
Level II study to the district's water system and appurtenances
necessary to make the project function in the manner intended;
(iv) Total project budget: Five hundred fifty-five
thousand dollars ($555,000.00);
(v) Project grant: The state of Wyoming shall grant
to the sponsor from water development account I through the
commission for the design, permit procurement, project land
procurement, construction engineering, and construction of the
project an amount not to exceed three hundred seventy-one
thousand eight hundred fifty dollars ($371,850.00) or sixty-
seven percent (67%) of the actual development costs, whichever
is less;
(vi) Appropriation: There is appropriated from water
development account I to the commission three hundred seventy-
one thousand eight hundred fifty dollars ($371,850.00) or as
much thereof as is necessary to carry out the purpose of this
subsection. Unexpended funds appropriated under this subsection
shall revert to water development account I on July 1, 2010; and
(vii) Special conditions:
(A) The sponsor shall purchase the well drilled
during the Level II study for a price not to exceed sixty-two
thousand four hundred twenty-eight dollars and seventy-nine
cents ($62,428.79) or thirty-three percent (33%) of the well's
actual construction costs, whichever is less. The sponsor may
purchase the well with a lump sum payment or with amortized
payments for a term of twenty (20) years from the date the
commission determines project benefits accrue to the sponsor at
an interest rate of four percent (4%);
(B) The sponsor is responsible for acquiring
thirty-three percent (33%) of the total project budget from
other sources.
Source notes for subsection (e): (Laws 2006, Ch. 105, § 3.)
(f) Project – Glenrock 2006 Water Storage Tank Project:
(i) Project sponsor: The Town of Glenrock;
(ii) Project purpose: Municipal water supply;
(iii) Project description: Design and construction
of a new water storage tank, site piping, transmission pipeline
and appurtenances necessary to make the project function in the
manner intended;
(iv) Total project budget: Nine hundred fifty
thousand five hundred dollars ($950,500.00);
(v) Project grant: The state of Wyoming shall grant
to the sponsor from water development account I through the
commission for the design, permit procurement, project land
procurement, construction engineering, and construction of the
project an amount not to exceed six hundred thirty-six thousand
eight hundred thirty-five dollars ($636,835.00) or sixty-seven
percent (67%) of the actual development costs, whichever is
less;
(vi) Appropriation: There is appropriated from water
development account I to the commission six hundred thirty-six
thousand eight hundred thirty-five dollars ($636,835.00) or as
much thereof as is necessary to carry out the purpose of this
subsection. Unexpended funds appropriated under this subsection
shall revert to water development account I on July 1, 2010; and
(vii) Special condition: The sponsor is responsible
for acquiring thirty-three percent (33%) of the total project
budget from other sources.
Source notes for subsection (f): (Laws 2006, Ch. 105, § 3.)
(g) Project - Hyattville Water Supply:
(i) Project sponsor: Hyattville Improvement and
Service District;
(ii) Project purpose: Rural domestic water supply;
(iii) Project description: Design and construction
of a storage tank and transmission facilities to connect the
well completed during the Level II study to the district's water
system, and appurtenances necessary to make the project function
in the manner intended;
(iv) Total project budget: Eight hundred thirty-five
thousand dollars ($835,000.00);
(v) Project grant: The state of Wyoming shall grant
to the sponsor from water development account I through the
commission for the design, permit procurement, project land
procurement, construction engineering, and construction of the
project an amount not to exceed five hundred fifty-nine thousand
four hundred fifty dollars ($559,450.00) or sixty-seven percent
(67%) of the actual development costs, whichever is less;
(vi) Project loan: The state of Wyoming shall loan to
the sponsor from water development account I through the
commission for the design, permit procurement, construction
engineering, project land procurement and construction of the
project an amount not to exceed two hundred seventy-five
thousand five hundred fifty dollars ($275,550.00) or thirty-
three percent (33%) of the actual development costs, whichever
is less, for a term of thirty (30) years from the date the
commission determines project benefits accrue to the sponsor, at
an annual rate of four percent (4%);
(vii) Appropriation: There is appropriated from water
development account I to the commission eight hundred thirty-
five thousand dollars ($835,000.00) or as much thereof as is
necessary to carry out the purpose of this subsection.
Unexpended funds appropriated under this subsection shall revert
to water development account I on July 1, 2010; and
(viii) Special condition: The sponsor shall purchase
the well completed during the Level II study for a price not to
exceed one hundred six thousand five hundred sixty dollars
($106,560.00) or thirty-three percent (33%) of the well's actual
construction costs, whichever is less. The sponsor may purchase
the well with a lump sum payment or with amortized payments for
a term of thirty (30) years from the date the commission
determines project benefits accrue to the sponsor at an interest
rate of four percent (4%).
Source notes for subsection (g): (Laws 2006, Ch. 105, § 3.)
(h) Project – Kaycee Storage and Transmission:
(i) Project sponsor: Town of Kaycee;
(ii) Project purpose: Municipal water supply;
(iii) Project description: Design and construction
of transmission pipelines, storage facilities and appurtenances
necessary to make the project function in the manner intended;
(iv) Total project budget: Two million three hundred
fifty thousand dollars ($2,350,000.00);
(v) Project grant: The state of Wyoming shall grant
to the sponsor from water development account I through the
commission for the design, permit procurement, construction
engineering, project land procurement, and construction of the
project an amount not to exceed one million five hundred
seventy-four thousand five hundred dollars ($1,574,500.00) or
sixty-seven percent (67%) of the actual development costs,
whichever is less;
(vi) Project loan: The state of Wyoming shall loan to
the sponsor from water development account I through the
commission for the design, permit procurement, construction
engineering, project land procurement and construction of the
project an amount not to exceed seven hundred seventy-five
thousand five hundred dollars ($775,500.00) or thirty-three
percent (33%) of the actual development costs, whichever is
less, for a term of thirty (30) years from the date the
commission determines project benefits accrue to the sponsor, at
an annual rate of four percent (4%); and
(vii) Appropriation: There is appropriated from water
development account I to the commission two million three
hundred fifty thousand dollars ($2,350,000.00) or as much
thereof as is necessary to carry out the purpose of this
subsection. Unexpended funds appropriated under this subsection
shall revert to water development account I on July 1, 2010.
Source notes for subsection (h): (Laws 2006, Ch. 105, § 3.)
(j) Project – Northwest Rural Water Storage II:
(i) Project sponsor: Northwest Rural Water District;
(ii) Project purpose: Rural domestic water supply;
(iii) Project description: Construction of new water
storage facilities, transmission pipelines and appurtenances
necessary to make the project function in the manner intended;
(iv) Total project budget: Two million nine hundred
sixty thousand dollars ($2,960,000.00);
(v) Project grant: The state of Wyoming shall grant
to the sponsor from water development account I through the
commission for the design, permit procurement, construction
engineering, project land procurement, and construction of the
project an amount not to exceed one million nine hundred eighty-
three thousand two hundred dollars ($1,983,200.00) or sixty-
seven percent (67%) of the actual development costs, whichever
is less;
(vi) Project loan: The state of Wyoming shall loan to
the sponsor from water development account I through the
commission for the design, permit procurement, construction
engineering, project land procurement and construction of the
project an amount not to exceed nine hundred seventy-six
thousand eight hundred dollars ($976,800.00) or thirty-three
percent (33%) of the actual development costs, whichever is
less, for a term of thirty (30) years from the date the
commission determines project benefits accrue to the sponsor, at
an annual rate of four percent (4%); and
(vii) Appropriation: There is appropriated from water
development account I to the commission two million nine hundred
sixty thousand dollars ($2,960,000.00) or as much thereof as is
necessary to carry out the purpose of this subsection.
Unexpended funds appropriated under this subsection shall revert
to water development account I on July 1, 2010.
Source notes for subsection (j): (Laws 2006, Ch. 105, § 3.)
(k) Project – Pine Bluffs Lance, Fox Hills Well:
(i) Project sponsor: Town of Pine Bluffs;
(ii) Project purpose: Municipal water supply;
(iii) Project description: Construction of
transmission pipelines necessary to connect the town's well
completed during the Level II study to the town's water system
and appurtenances necessary to make the project function in the
manner intended;
(iv) Total project budget: Five hundred forty
thousand dollars ($540,000.00);
(v) Project grant: The state of Wyoming shall grant
to the sponsor from water development account I through the
commission for the design, permit procurement, project land
procurement, construction engineering and construction of the
project an amount not to exceed three hundred sixty-one thousand
eight hundred dollars ($361,800.00) or sixty-seven percent (67%)
of the actual development costs, whichever is less;
(vi) Project loan: The state of Wyoming shall loan to
the sponsor from water development account I through the
commission for the design, permit procurement, construction
engineering, project land procurement and construction of the
project an amount not to exceed seventy-three thousand four
hundred forty dollars ($73,440.00) or thirteen and six-tenths
percent (13.6%) of the actual development costs, whichever is
less, for a term of thirty (30) years from the date the
commission determines project benefits accrue to the sponsor, at
an annual rate of four percent (4%);
(vii) Appropriation: There is appropriated from water
development account I to the commission four hundred thirty-five
thousand two hundred forty dollars ($435,240.00) or as much
thereof as is necessary to carry out the purpose of this
subsection. Unexpended funds appropriated under this subsection
shall revert to water development account I on July 1, 2011; and
(viii) Special conditions:
(A) The sponsor shall purchase the well
completed during the Level II study for a price not to exceed
forty thousand three hundred fifty-nine dollars ($40,359.00) or
thirty-three percent (33%) of the well's actual construction
costs, whichever is less. The sponsor may purchase the well with
a lump sum payment or with amortized payments for a term of
thirty (30) years from the date the commission determines
project benefits accrue to the sponsor at an interest rate of
four percent (4%);
(B) The sponsor is responsible for acquiring
nineteen and four-tenths percent (19.4%) of the total project
budget from other sources.
Source notes for subsection (k): (Laws 2006, Ch. 105, § 3; 2008,
Ch. 75, § 2.)
(m) Project – Pine Haven Transmission 2006 Project:
(i) Project sponsor: The Town of Pine Haven;
(ii) Project purpose: Municipal water supply;
(iii) Project description: Construction of new water
transmission facilities and appurtenances necessary to make the
project function in the manner intended;
(iv) Total project budget: Three hundred forty-eight
thousand dollars ($348,000.00);
(v) Project grant: The state of Wyoming shall grant
to the sponsor from water development account I through the
commission for the design, permit procurement, construction
engineering, project land procurement, and construction of the
project an amount not to exceed two hundred thirty-three
thousand one hundred sixty dollars ($233,160.00) or sixty-seven
percent (67%) of the actual development costs, whichever is
less;
(vi) Project loan: The state of Wyoming shall loan
to the sponsor from water development account I through the
commission for the design, permit procurement, construction
engineering, project land procurement and construction of the
project an amount not to exceed one hundred fourteen thousand
eight hundred forty dollars ($114,840.00) or thirty-three
percent (33%) of the actual development costs, whichever is
less, for a term of thirty (30) years from the date the
commission determines project benefits accrue to the sponsor, at
an annual rate of four percent (4%); and
(vii) Appropriation: There is appropriated from water
development account I to the commission three hundred forty-
eight thousand dollars ($348,000.00) or as much thereof as is
necessary to carry out the purpose of this subsection.
Unexpended funds appropriated under this subsection shall revert
to water development account I on July 1, 2012.
Source notes for subsection (m): (Laws 2006, Ch. 105, § 3;
2010, ch. 68, § 2.)
(n) Project – Squaw Creek Well Field:
(i) Project sponsor: Squaw Creek Water District;
(ii) Project purpose: Rural domestic water supply;
(iii) Project description: To connect the well
drilled during the groundwater grant study to the district's
water system, and appurtenances necessary for the project to
function as intended;
(iv) Total project budget: Two hundred sixty-five
thousand dollars ($265,000.00);
(v) Project grant: The state of Wyoming shall grant
to the sponsor from water development account I through the
commission for the design, permit procurement, construction
engineering, and project land procurement of the project an
amount not to exceed one hundred seventy-seven thousand five
hundred fifty dollars ($177,550.00) or sixty-seven percent (67%)
of the actual development costs, whichever is less;
(vi) Appropriation: There is appropriated from water
development account I to the commission one hundred seventy-
seven thousand five hundred fifty dollars ($177,550.00) or as
much thereof as is necessary to carry out the purpose of this
subsection. Unexpended funds appropriated under this subsection
shall revert to water development account I on July 1, 2010; and
(vii) Special conditions:
(A) The sponsor is responsible for acquiring
thirty-three percent (33%) of the total project budget from
other sources;
(B) Funds for construction of the project shall
not be released until the Level II well has been successfully
drilled and developed.
Source notes for subsection (n): (Laws 2006, Ch. 105, § 3.)
(o) Project – Wardwell Water Supply Improvements:
(i) Project sponsor: Wardwell Water and Sewer
District;
(ii) Project purpose: Municipal and rural domestic
water supply;
(iii) Project description: Design and construction of
transmission pipelines, system storage and appurtenances
necessary to make the project function in the manner intended;
(iv) Total project budget: Six million eight hundred
seventy thousand dollars ($6,870,000.00);
(v) Project grant: The state of Wyoming shall grant
to the sponsor from water development account I through the
commission for the design, permit procurement, construction
engineering and project land procurement of the project an
amount not to exceed four million six hundred two thousand nine
hundred dollars ($4,602,900.00) or sixty-seven percent (67%) of
the actual development costs, whichever is less;
(vi) Appropriation: There is appropriated from water
development account I to the commission four million six hundred
two thousand nine hundred dollars ($4,602,900.00) or as much
thereof as is necessary to carry out the purpose of this
subsection. Unexpended funds appropriated under this subsection
shall revert to water development account I on July 1, 2013; and
(vii) Special condition: The sponsor is responsible
for acquiring thirty-three percent (33%) of the total project
budget from other sources.
Source notes for subsection (o): (Laws 2006, Ch. 105, § 3;
2008, Ch. 75, § 2; 2011, Ch. 63, § 2.)
Nearby Sections
15
Cite This Page — Counsel Stack
Wyoming § 99-3-1103, Counsel Stack Legal Research, https://law.counselstack.com/statute/wy/3/99-3-1103.