(a)An electric utility may request approval from
the commission to implement a public use electric vehicle pilot
program to do any of the following:
(1)Install, own, or operate charging infrastructure or make-ready
infrastructure to support public use EVs.
(2)Provide incentives or rebates to customers to encourage
customer investment in public use EVs and in associated EV
supply equipment.
For purposes of this subsection, "EV supply equipment" means a
device or system designed and used specifically to transfer electrical
energy to an electric vehicle, either as charge transferred via physical
or wireless connection, by loading a fully charged battery into the
vehicle, or by other means.
(b)An electric utility's request for approval of a pilot program under
this chapter must include the
Free access — add to your briefcase to read the full text and ask questions with AI
(a) An electric utility may request approval from
the commission to implement a public use electric vehicle pilot
program to do any of the following:
(1) Install, own, or operate charging infrastructure or make-ready
infrastructure to support public use EVs.
(2) Provide incentives or rebates to customers to encourage
customer investment in public use EVs and in associated EV
supply equipment.
For purposes of this subsection, "EV supply equipment" means a
device or system designed and used specifically to transfer electrical
energy to an electric vehicle, either as charge transferred via physical
or wireless connection, by loading a fully charged battery into the
vehicle, or by other means.
(b) An electric utility's request for approval of a pilot program under
this chapter must include the following:
(1) A full description of the need for and goals of the pilot
program.
(2) A full description of objective evaluation criteria that will be
used to measure the success or usefulness of the pilot program.
(3) An estimate of all costs of the pilot program, including an
estimate of the costs to be borne by participating customers of the
electric utility, nonparticipating customers of the electric utility,
and the general public, as applicable.
(4) A timeline for completion or termination of the pilot program.
(5) A plan demonstrating that the charging infrastructure to be
installed under the pilot program will be located in an equitable
manner that ensures that all customers within the electric utility's
service area have convenient access to the charging infrastructure,
including in areas that are:
(A) economically distressed; or
(B) racially or ethnically diverse.
(6) Supporting evidence as to why the pilot program is in the
public interest, including information as to how participating
customers of the electric utility, nonparticipating customers of the
electric utility, and the general public may be affected by the pilot
program.
(c) An electric utility's request for approval of a pilot program under
this chapter may include a request for:
(1) assurance of cost recovery for pilot program capital costs, up
to the amount of an approved cost estimate; and
(2) deferral of pilot program capital costs.
(d) Subject to subsection (f), an electric utility may request approval
of a pilot program under this chapter:
(1) through a proceeding initiated under IC 8-1-2-61, whether as
a standalone proposal or as part of a base rate case;
(2) as an alternative regulatory plan under IC 8-1-2.5; or
(3) through any other process prescribed by the commission.
(e) The commission shall approve an electric utility's request for
approval of a pilot program under this chapter if, after notice and an
opportunity for hearing, the commission determines that the proposed
pilot program is reasonable, just, and in the public interest. In making
a determination under this subsection, the commission shall consider
the following:
(1) The goals of the pilot program, including any data that will be
measured or collected through the pilot program, such as data
concerning customers' electric charging behavior, the electric
utility's load management capabilities, or the impact of public use
EVs on the electric utility's distribution system.
(2) Whether the pilot program includes objective evaluation
criteria consisting of clearly defined metrics to be used in
assessing the success of the pilot program.
(3) The extent to which the estimated costs of the proposed pilot
program will be borne by:
(A) participating customers of the electric utility;
(B) nonparticipating customers of the electric utility; and
(C) the general public;
based on the evidence in the record of the proceeding.
(4) Information as to any benefits that may inure to:
(A) participating customers of the electric utility;
(B) nonparticipating customers of the electric utility; and
(C) the general public;
as a result of the pilot program, based on the evidence in the
record of the proceeding.
(5) The reasonableness of the:
(A) scale; and
(B) duration;
of the pilot program in relation to the estimated costs and benefits
of the program, the electric utility's total customer base and
service area, and the stated goals of the program.
(6) Whether the electric utility's proposal includes a plan
demonstrating that the charging infrastructure to be installed
under the pilot program will be located in an equitable manner
that ensures that all customers within the electric utility's service
area have convenient access to the charging infrastructure,
including in areas that are:
(A) economically distressed; or
(B) racially or ethnically diverse.
(7) Other factors the commission considers relevant in
determining whether the proposed pilot program is reasonable,
just, and in the public interest.
(f) This chapter does not prohibit an electric utility from:
(1) installing, owning, or operating charging infrastructure or
make-ready infrastructure for electric vehicles; and
(2) seeking to include the associated capital costs in the electric
utility's basic rates and charges through a proceeding initiated
under IC 8-1-2-61.
The commission shall approve the inclusion of the capital costs
described in subdivision (2) in the electric utility's basic rates and
charges if the commission finds that the capital costs incurred are
reasonable, just, and in the public interest.