Indiana Statutes
§ 13-19-3-6 — Vertical expansions of existing permitted landfill; submission of design, engineering, and operational requirements
Notwithstanding federal regulations, the board and the department shall adopt rules under section 1 of this chapter that require the applicant for a vertical expansion of an existing permitted landfill to submit design, engineering, and operational requirements, including the following:
(1)A more precise definition of the hydrogeology of the site,
including a soil gas analysis.
(2)Operational requirements.
(3)Surface water control plan.
(4)Landfill gas control plan.
(5)Final cover requirements.
(6)Closure and financial assurance plans.
(7)Remedial action plan.
[Pre-1996 Recodification Citation: 13-1-12-9(d).]
Free access — add to your briefcase to read the full text and ask questions with AI
Indiana § 13-19-3-6 (Vertical expansions of existing permitted landfill; submission of design, engineering, and operational requirements) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.
Legislative History
As added by P.L.1-1996, SEC.9.
Nearby Sections
15
§ 13-11-1-1
Applicability of definitions in this article§ 13-11-1-2
Applicability of definitions in IC 36-1-2§ 13-11-2-0.1
Application of certain amendments to chapter§ 13-11-2-0.2
Application of certain amendments to prior law§ 13-11-2-0.3
"Aboveground petroleum storage tank"§ 13-11-2-0.4
"Aboveground storage tank"§ 13-11-2-0.5
Repealed§ 13-11-2-0.6
Repealed§ 13-11-2-0.7
"ABS sensor"§ 13-11-2-1
"Active area"§ 13-11-2-1.5
"Acute hazardous waste"§ 13-11-2-10
"Asbestos"§ 13-11-2-100
"Hazardous waste facility"§ 13-11-2-101
"Hazardous waste landfill"