Indiana Statutes

§ 13-19-3-6 — Vertical expansions of existing permitted landfill; submission of design, engineering, and operational requirements

Indiana·Art. 19 SOLID WASTE AND HAZARDOUS WASTE·Ch. 3 Powers and Duties Concerning Solid Waste and

Notwithstanding federal regulations, the board and the department shall adopt rules under section 1 of this chapter that require the applicant for a vertical expansion of an existing permitted landfill to submit design, engineering, and operational requirements, including the following:

(1)A more precise definition of the hydrogeology of the site, including a soil gas analysis.
(2)Operational requirements.
(3)Surface water control plan.
(4)Landfill gas control plan.
(5)Final cover requirements.
(6)Closure and financial assurance plans.
(7)Remedial action plan. [Pre-1996 Recodification Citation: 13-1-12-9(d).]

Free access — add to your briefcase to read the full text and ask questions with AI

Indiana § 13-19-3-6 (Vertical expansions of existing permitted landfill; submission of design, engineering, and operational requirements) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Legislative History

As added by P.L.1-1996, SEC.9.

Nearby Sections

15
View on official source ↗