Colorado Statutes

§ 35-49-106 — Plans submitted to state engineer

Colorado·Title 35 Agriculture·Art. Livestock Water Tanks
Anyone proposing to construct a dam for the creation of a livestock water tank, as described in section 35-49-103, shall submit to the state engineer for approval an application on a form provided by the state engineer showing the general location of such proposed dam with reference to section, township, and range, location and dimensions of spillway, and the number, location, and size of dams already constructed within the watersheds of the dry channel on which such dam is proposed to be built. Nothing contained in this section shall be construed to specify plans and specifications of such technical detail or nature as to require preparation by an engineer or construction of such stock water tanks under the supervision of an engineer; it being the intent and purpose of the provi

Free access — add to your briefcase to read the full text and ask questions with AI

Colorado § 35-49-106 (Plans submitted to state engineer) — published by Counsel Stack Legal Research, free access to 12M+ legal documents.

Legislative History

Source: L. 41: p. 526, � 6. CSA: C. 160, � 231. CRS 53: � 8-17-6. C.R.S. 1963: � 8-17-6. L. 92: Entire section amended, p. 2304, � 1, effective June 3.

Nearby Sections

15
View on official source ↗