Colorado Statutes
§ 35-11-107 — Equipment and installation requirements
Colorado § 35-11-107
This text of Colorado § 35-11-107 (Equipment and installation requirements) is published on Counsel Stack Legal Research, covering Colorado primary law. Counsel Stack provides free access to over 12 million legal documents including statutes, case law, regulations, and constitutions.
Bluebook
Colo. Rev. Stat. § 35-11-107 (2026).
Text
(1)An irrigation
system utilizing chemigation on and after January 1, 1990, or an irrigation system
which has been issued a provisional chemigation permit shall have, as component
parts thereof, a properly installed and functioning:
(a)Backflow prevention check valve and vacuum relief valve between the
main check valve and the irrigation pump;
(b)Inspection port to check the performance of the check valve on the
irrigation pipeline;
(c)Automatic low-pressure drain placed between the main check valve and
the irrigation pump so that a chemical will drain away from the source of water
supply;
(d)Check valve in the chemical injection line; and
(e)Simultaneous interlock device between the power system of the chemical
injection unit and the irrigation pumping plant to protect
Free access — add to your briefcase to read the full text and ask questions with AI
Legislative History
Source: L. 87: Entire article RC&RE, p. 1281, � 1, effective July 1.
Nearby Sections
15
§ 35-1-101
Short title§ 35-1-102
Definitions§ 35-1-103
Department of agriculture§ 35-1-104
Functions, powers, and duties - rules§ 35-1-106
Powers and duties of commission - rules§ 35-1-106.4
Emergency invasive-pest response fund§ 35-1-106.7
Conservation district grant fund§ 35-1-106.9
Agriculture management fund - creation - repeal§ 35-1-108
Divisions created§ 35-1-109
Employees interchangeable§ 35-1-110
Legal adviser - legal actions§ 35-1-116
Blockchain educational program - repealCite This Page — Counsel Stack
Bluebook (online)
Colorado § 35-11-107, Counsel Stack Legal Research, https://law.counselstack.com/statute/co/35/35-11-107.